Loading...
HomeMy WebLinkAboutEngineered Plan - 2016t r f SEPTIC SYSTEM DESIGN FLOW ESTIMATE: 4 BEDROOMS AT 110 GAL / DAY = 440 GAL / DAY SEPTIC TANK: 440 GAL / DAY x 2 DAYS = 880 GAL USE 1500 GALLON SEPTIC TANK LEACHING AREA: USE 3 - 500 GALLON CHAMBERS (8.5'x 4.8'x 2' EFF. DEPTH) WITH 4' OF STONE ALL AROUND (33.5'x 12.8'x 2' DEEP) SIDE AREA: (33.5' + 12.8') x 2 x 2 = 185 SF (0.74) = 137 GAL/DAY BOTTOM AREA: 33.5'x 12.8'= 429 SF (0.74) =.3l 7 GAUDAY CAPACITY = 454 GAL/DAY REQUIRED VARIANCES FROM TITLE FIVE: 1. SECTION 15.211 (1): LEACH AREA TO BE LESS THAN 10' FROM PROPERTY LINE (VARIANCE OF 3'). 2. SECTION 15.211 (1): SEPTIC TANK TO BE LESS THAN 10' FROM PROPERTY LINE (VARIANCES OF 5'). 3. SECTION 15.221 (7): LEACH AREA TO BE MORE THAN T BELOW GRADE (VARIANCE OF 3'). 4. SECTION 15.221 (7): SEPTIC TANK TO BE MORE THAN T BELOW GRADE (VARIANCE OF 2'). BENCHMARK AT LEFT CORNER OF BOTTOM SLATE STEP N1 o?.15 8 ELEVATION = 93.55 98- __100 8- 100 SN�p / ` 96 100 98-1 / 96 G000 � 94 m i 0- 96 96 L N� __--\94-_.__ - KEY: EXISTING CONTOUR: - - - - �6p PROPOSED CONTOUR: ............. Ove RO LOCUS ` EXISTING SPOT ELEVATION: 25.5 PMQPNO PROPOSED SPOT ELEVATION: 25.5 0 % TEST HOLE: * O O ���y UTILITY POLE: -0- FENCE LINE: gPRNPG�� HYDRANT: -6- 1 N 4 RETAINING WALL: LOCATION MAP LOT 92 (12,477 SF) ASSESSORS MAP: 134 PARCEL: 136 PLAN BOOK: 207, PAGE: 57 SEPTIC SYSTEM DESIGN FLOW ESTIMATE: 4 BEDROOMS AT 110 GAL / DAY = 440 GAL / DAY SEPTIC TANK: 440 GAL / DAY x 2 DAYS = 880 GAL USE 1500 GALLON SEPTIC TANK LEACHING AREA: USE 3 - 500 GALLON CHAMBERS (8.5'x 4.8'x 2' EFF. DEPTH) WITH 4' OF STONE ALL AROUND (33.5'x 12.8'x 2' DEEP) SIDE AREA: (33.5' + 12.8') x 2 x 2 = 185 SF (0.74) = 137 GAL/DAY BOTTOM AREA: 33.5'x 12.8'= 429 SF (0.74) =.3l 7 GAUDAY CAPACITY = 454 GAL/DAY REQUIRED VARIANCES FROM TITLE FIVE: 1. SECTION 15.211 (1): LEACH AREA TO BE LESS THAN 10' FROM PROPERTY LINE (VARIANCE OF 3'). 2. SECTION 15.211 (1): SEPTIC TANK TO BE LESS THAN 10' FROM PROPERTY LINE (VARIANCES OF 5'). 3. SECTION 15.221 (7): LEACH AREA TO BE MORE THAN T BELOW GRADE (VARIANCE OF 3'). 4. SECTION 15.221 (7): SEPTIC TANK TO BE MORE THAN T BELOW GRADE (VARIANCE OF 2'). BENCHMARK AT LEFT CORNER OF BOTTOM SLATE STEP N1 o?.15 8 ELEVATION = 93.55 98- __100 8- 100 SN�p / ` 96 100 98-1 / 96 G000 � 94 m i 0- 96 96 L N� __--\94-_.__ - cr>c:0 Ln Lal *0o z j taw - 90 E�\S 0 OOG �g��LL�Ng�o2 O p tt`d 65 �kl e opor tree Prbase� /r 92 --• / Qoje\ 92 i \% LP�) / / 36" �G ��� cherry 90 f lig pEN �'s / l PREP `'s 88 55 teOo\je\ y. I ry oak e G .� , a LP) y'`P C -E -T \`ght90 4 i S OPeEs� 88�� LO OF SSR /ge o%mea'/ g P�ra �"'ep"A S � l8 wPS�RMP\N M16-38 Permit valid ofor REPAIR OF SEPTIC SYSTEM ONLY, du.. to State and Local septic variances. board of _9ealth review and approval is reyuircd for a` suture ad(litions/r•e0uvations/alterations to �sew86e f rcilities and/or structures/dwelling. i 'YArnmth llealbb Department 'AL'PRO V Y5*! ��artTe Date SEPTIC SYSTEM SECTION COVERS WITHIN 6. OF FINISHED GRA[ 85(1/-),/ ELEV. 5(+/- ELEV. (UNDER SLAB) BATH w o OPEN " AREA 0 FAMILY Y ROOM UTILITIES WALK BED OUT ROOM BASEMENT LIVING ROOM BATH DINING I KITCHEN I ROOM I- w/d BEDI 1st FLOOR ROOM BATH BED BED ROOM ROOM 2nd FLOOR EXISTING FLOOR PLAN _EV. d ��ptil lz) (H- 0) 1500 GAL SEPTIC TANK (6" OF STONE UNDER OR MECHANICALLY COMPACTED) TEE SIZES: INLET: 6" UP, 13" DOWN OUTLET: 6" UP, 14" DOWN GARAGE PORCH WALTH DEPT. D -BOX (6" STONE UNDER) (H-20) -GAS BAFFLE AT OUTLET TEE 2" PEASTONE OR FILTER FABRIC 3/4" -1 1/2" WASHED STONE INSPECTION PORT ELEV.-- 85.0 T MAX. (1- OM ) .,. ELEV. TEST HOLE LOGS ENGINEER: THOMAS McLELLAN, P.E. WITNESS: AMY VON HONE, R.S. DATE: 8-18-16 & 8-23-16 PERCOLATION RATE: < 5 MIN/IN LMII' °° . . . 1-119W 82.0 H H ELEV. 33.5'x 12.8'- 1 3 - 500 GALLON CHAMBERS WITH 4' OF STONE ALL AROUND (33.5'x 12.8'x 2' DEEP) H-20 (TO BT VE TED) TH-1 24" FILL GLG°• O/A HORIZON" LOAMY SAND 27" 1 OYR 4/1 86.7 B HORIZON LOAMY SAND PERC AT 42" 48"1 1 OYR 5/8 85.0 Cl HORIZON MEDIUM SAND C2 HORIZON _, - UNSUITABLE SOIL (REMOVE) 156" 2 5Y 6/44AM _ 76.0 C3 HORIZON WICKED GOOD SAN[ 204" MEDIUM SAND 72.0 NO GROUND WATER ENCOUNTERED NOTES: 1. VERTICAL DATUM: ASSUMED 2. MUNICAPAL WATER IS AVAILABLE. 3. SCHEDULE 40 - 4" PVC PIPE TO BE USED THROUGHOUT SEPTIC SYSTEM. 4. ALL PRECAST UNITS SUBJECT TO TRAFFIC LOADS TO CONFORM WITH AASHTO H-20 SPECIFICATIONS. 5. PIPE PITCH = 1/8" PER FOOT (UNLESS NOTED OTHERWISE). 6. FIRST 2' OF PIPE OUT OF D -BOX TO BE SET LEVEL. 7. THE SEPTIC SYSTEM HAS NOT BEEN DESIGNED TO ACCOMODATE THE USE OF A GARBAGE DISPOSAL. 8. ALL CONSTRUCTION DETAILS ARE TO BE IN CONFORMANCE WITH THE STATE OF MASS. ENVIRONMENTAL CODE (TITLE FIVE) AND LOCAL HEALTH REGULATIONS. 9. CONTRACTOR TO VERIFY LOCATIONS OF ALL UTILITIES PRIOR TO CONSTRUCTION. 10. GROUND COVER OVER ALL SEPTIC SYSTEM COMPONENTS NOT TO EXCEED 31. 11. FIELD SURVEY PROVIDED BY TERRY A. WARNER, P.L.S., HARWICH, MA. 12. THIS PLAN REQUIRES THE REVIEW AND APPROVAL OF ONE OR MORE TOWN DEPARTMENTS AND IS SUBJECT TO CHANGE UNTIL SUCH TIME. 13. EXISTING SEPTIC TANK, LEACH PITS (3) AND DRY WELL IS TO BE PUMPED AND FILLED WITH SAND OR REMOVED. 14. D -BOX TO BE WATER TESTED TO ENSURE LEVELNESS AND EQUAL FLOW. 15. EXISTING WATER SERVICE TO BE RELOCATED SO AS TO BE A MINIMUM OF 10' FROM PROPOSED SEPTIC SYSTEM. 16. ALL UNSUITABLE SOIL, (SILT LOAM, APPROX. 13' DEEP) WITHIN 5' OF PROPOSED LEACH AREA IS TO BE REMOVED AND REPLACED WITH CLEAN MEDIUM SAND. SITE PLAN ) LOCATION: N OF41.4 cti i 24 BARNACLE RD., YARMOUTHPORT,MA TERRY Gs' ANN PREPARED FOR: i VARN>-R i 5 CHARLES BRIGHT No. 3,8721 " r DATE: 8-25-16 SCALE: 1" = 20' BASS RIVER ENGINEERING THOMAS J. McLEI AN, P.E. P.O. BOX 1163, EAST DENNIS, MA 02641 508-364-9048