Loading...
HomeMy WebLinkAboutEngineered Plan - 2016ACCESS COVERS MUST BE WITHIN 9" MINIMUM. 6" OF FINISH GRADE 3 ' MAXIMUM COVER FIRST 2' TO BE LEVEL MIN 2" OF PEASTONE OR FILTER FABRIC 3/4" - 1 //2" DIA. 98.6 98.4 E20�2"' DOUBLE WASHED STONE d GAS �X 98.2 .9 96.2 BAFFLE 98.57 3 OUTLET 2-500 GAL LEACHING CHAMBERS EXISTING D -BOX W/4' STONE AROUND. 12.8'w x 25'1 x 2'd 1000 GAL H-20 SEPTIC TANK 6" CRUSHED STONE OR COMPACTED BASE PROF I L E: NOT TO SCALE LOCUS MAP 1� „ a. 100. 100.5 i 1 i ® w / 9c / a / CB/DH FN /02.5 / i / UP 2-G 98.7 ® lt% 99.8 + 100.1 i oc / 2-500 GALLON o LEACHING CHAMBERSi TPs! W/4' STONE AROUND I 4'PEAC o \ i +99.8 � A o Ifo o/ D -BOX 8K. CORNER STEP o EL -102.90 -?i ' + EXISTING / SEPTIC TANS 000 Ro4 A l//j, '< 0�9ROplA \ 8P•tt� > epRC1� aG \oI&O GPRPo �OP�� e0Rp1� LOT 281 18.907+ S.F. LEGEND 98.6 ® CB CONCRETE BOUND -W WATER L I NE O HYDRANT -G GAS L INE OHW- OVER HEAD WIRES OBSERVED GROUND WATER: LIGHT POST -f - UNDERGROUND ELECTRIC LINE -T UNDERGROUND TELEPHONE LINE - CTV- UNDERGROUND CABLEVISION LINE + 40.4 SPOT ELEVATION ........ 40-- ... EXISTING CONTOUR R 0-1 PROPOSED CONTOUR 7.95' C8/DH FND 0 IO 20 INVERT ELEVATIONS: INVERT OUT SEPTIC TANK: 98.6 `INVERT IN DIST. BOX: 98.57 INVERT OUT DIST. BOX: 98.4 INVERT IN LEACH CHAMBER: 98.2 BOTTOM OF LEACH CHAMBER: 96.2 ADJUSTED GROUND WATER: N/A OBSERVED GROUND WATER: N/A BOTTOM OF TEST HOLE sl: 89.4 40 DESIGN CRITERIA DESIGN FLOW: 3 BEDROOMS AT 1/0 G.P.D. PER BEDROOM EQUALS 330 G.P.D. NO GARBAGE GRINDER SEPTIC TANK REQUIRED: 330 G.P.D. X 200% - 660 GAL. SEPTIC TANK PROVIDED: 1000 GAL. EXISTING SOIL ABSORPTION SYSTEM REQUIRED: DESIGN PERC RATE C 5 MIN/INCH SOIL TEXTURAL CLASS - l EFFLUENT L OAD l NG RATE - 0.74 GPD/SF 330 GPD / 0.74 GPD/SF - 446 S.F. REQUIRED PROVIDED: 2-500 GAL LEACHING CHAMBERS W14* STONE AROUND. A-471 S.F. 471 S.F. x 0.74 - 348 G.P.D. SOIL TEST PIT DATA INDICA TES INOICA TES PERCOLATION = OBSERVED TEST c GROUNDWATER TP #1 0. „�,, , ­ 1-1- 1— 100.7 A LOAMY IOYR SAND 3/3 5" - - - - - - - - -- -- - -- 100.3 B LOAMY IOYR SAND S/6 22'-q 2' --------------- 98.9 C / MEDIUM IOYR SAND 616 48" 136 1 NO WATER - 89.4 DATE: JUNE 16. 2016 TEST BY: STEPHEN HAAS WITNESSED BY: AMY VONEHONE PERC RATE: f2 MIN/INCH GENERAL NOTES.- I. OTES:I. THIS PLAN IS FOR THE DESIGN AND CONSTRUCTION OF THE SEWAGE DISPOSAL SYSTEM ONLY. 2. VERTICAL DATUM IS ASSUMED. FOR BENCH MARKS SET. SEE SI TE PLAN. J. ALL CONSTRUCTION METHODS AND MA TER I AL S AND MAINTENANCE OF THE SEPTIC SYSTEM SHALL CONFORM TO MASS. D.E.P. TITLE 5 AND LOCAL BOARD OF HEALTH REGULATIONS. 4. ALL SEPTIC SYSTEM COMPONENTS LOCATED UNDER AREAS SUBJECT TO VEHICULAR TRAFFIC OR GREATER THAN 3 ' IN DEPTH SHALL BE CAPABLE OF WI TH- STANDING H-20 WHEEL LOADS. 5. ALL SEWER PIPE SHALL BE SCHEDULE 40 PVC OR APPROVED EQUAL. 6. SEPTIC TANK AND D -BOX SHALL BE REINFORCED PRECAST CONCRETE OR APPROVED POLYETHYLENE. BOTH SHALL BE WATERTIGHT. D -BOX SHALL BE WATER TESTED FOR LEVEL WHEN THERE IS MORE THAN ONE OUTLET. 7. BEFORE CONSTRUCTION CALL 'DIG -SAFE". 1-888-DI6-SAFE AND THE LOCAL WATER DEPT. FOR L OCA T I ON OF UNDERGROUND UTILITIES. 8. EXISTING LEACHING TO BE PUMPED DRY. REMOVED ALONG WITH ALL CONTAMINATED SOIL AND BACKFILLED WITH CLEAN SAND. 9. ALL UNSUITABLE MATERIAL (EXISTING SAS) ENCOUNTERED BELOW THE INVERT OF THE LEACHING FAC I L I TY TO BE REMOVED FOR A DISTANCE OF 5' AROUND AND REPLACED WITH SAND IN ACCORDANCE WITH TI TLE 5. 10. EXISTING SEPTIC TANK TO BE PUMPED AND CLEANED. INSPECT AND REPLACE INLET TEE IF REQUIRED. VARIANCES REOU I RED : TITLE 5. MAXIMUM FEASIBLE COMPLIANCE SECTION 15.211:(1) MINIMUM SETBACK DISTANCES /0' IS REQUI kED BETWEEN THE SAS AND THE PROPERTY LINE. 6' IS PROVIDED. A 4' VARIANCE IS REQUESTED. 20' IS REQUIRED BETWEEN THE SAS AND THE FOUNDATION, 15' IS PROVIDED. A 5' VARIANCE IS REQUESTED. „? ®FMASS9 c 44 G.'38721 � j 4 SE7PT l C SYSTEM DE7S l GN 11 COPPER BROOK ROAD. MAP SO. PARCEL 29 SOUTH YARMOUTH. MA. f-�A W rk1� PREPARED FOR A U D R E Y D E L O R O S S O Pa mit Naleil for Rk:PA1R OH SI?PTIC SYSTEM ONLY, due to State and I ocal septic variances. Boaro of Ifealth.re.view ,jail approval is required for S CA L_ E / 2 O J UNE 21 2016 any.: future additions/eeiiovaiionm s/adterati�s to sewage facilities and/gr struclores/dwelling. 1 arraoath f1c7,,1t DepartmentSTEPHEN A. HAAS �,)�jJ���_�� ENGINEERING, INC ��� P.O. Box 16 Sou t h Denn i s MA 02660 14 ( 508 ) 362-8 1 32 Name Uatel / JOB NO: 16-029 I