HomeMy WebLinkAboutEngineered Plan - 2014TOP OF FOUNDATION
EL=24.9
77
. 7 , 7 \,
24"diameter concrete covers
rarsed to wrtbn C' of finish grade
(or as noted)
CL-22.2(mm)
/
inspection Port and cap with magnetic
marbng tape to wrthm 3"of grade
EL=22.7+ EL=22.0 - RR.8(nz
20.00 /9.67 "- Law 19.40,
Gas Baffle 18.50 ,
}`
Longest Run
/500 GALLONDB-6
(H-20 Rated)
SEPTIC TANK D -301y
FLOW PROFILE
CONSTRUCTION NOTES NOT TO SCALE
1.) ALL WORK SHALL CONFORM TO THE STATE ENVIRONMENTAL CODE, TITLE 5 (31 O CMR 15.000):
STANDARD REQUIREMENTS FOR THE SITING, CONSTRUCTION, INSPECTION, UPGRADE, AND EXPANSION OF
ON-SITE SEWAGE TREATMENT AND DISPOSAL SYSTEMS AND FOR THE TRANSPORT AND DISPOSAL OF
SEPTAGE AND THE LOCAL BOARD OF HEALTH REGULATIONS.
2.) ANY SEPTIC SYSTEM COMPONENT INSTALLED IN A LOCATION WHERE THERE 15 POTENTIAL FOR
VEHICLES OR HEAVY EQUIPMENT TO PA55 OVER IT SHALL BE DESIGNED TO WITHSTAND AN H-20 LOADING.
IF UNDER AN IMPERVIOUS SURFACE, SYSTEM SHALL BE VENTED TO THE ATMOSPHERE.
3.) TO MINIMIZE UNEVEN SETTLING, SEPTIC TANKS SHALL BE INSTALLED ON A STABLE
MECHANICALLY -COMPACTED BASE ON 51X INCHES OF CRUSHED STONE.
4.) COVERS OVER THE INLET AND OUTLET TEES OF THE SEPTIC TANK, THE DISTRIBUTION BOX, AND THE
SOIL ABSORPTION SYSTEM SHALL BE RA15ED TO WITHIN 6" OF FINAL GRADE. LEACHING FIELDS,
TRENCHES, AND OTHER 501L ABSORPTION SYSTEMS WITHOUT ACCE55 MANHOLES SHALL HAVE AT LEAST
ONE (1) INSPECTION PORT CONSISTING OF PERFORATED 4' PVC PIPE PLACED VERTICALLY TO THE BOTTOM
OF THE SOIL ABSORPTION SYSTEM WITH A CAP, TIED WITH MAGNETIC MARKING TAPE, ACCESSIBLE TO
WITHIN 3" OF FINAL GRADE.
5.) PIPING SHALL CONSIST OF 4' SCHEDULE 40 PVC OR EQUIVALENT. PIPE SHALL BE LAID ON A MINIMUM
CONTINUOUS GRADE OF NOT LE55 THAN 2% FROM THE BUILDING TO THE SEPTIC TANK, AND NOT LESS
THAN I % OTHERWISE.
6.) DISTRIBUTION LINES FOR THE SOIL ABSORPTION SYSTEM SHALL BE 4' DIAMETER SCHEDULE 40 PVC
(OR EQUIVALENT) LAID AT 0.005 FT/FT. UNLESS OTHERWISE NOTED. LINES SHALL BE CAPPED AT END OR
-A5 NOTED: - - -- - - - -
7.) LINES FROM THE DISTRIBUTION BOX TO BE LEVEL FOR THE FIRST TWO (2) FEET BEFORE PITCHING TO
THE 501L ABSORPTION SYSTEM. DISTRIBUTION BOX SHALL BE WATER TESTED TO ASSURE EVEN
DISTRIBUTION.
8.) GROUT TO BE USED AT ALL POINTS WHERE PIPES ENTER OR LEAVE ALL CONCRETE STRUCTURES IN
ORDER TO PROVIDE A WATERTIGHT SEAL,
9.) HEAVY EQUIPMENT SHALL NOT BE ALLOWED TO OPERATE OVER THE LIMITS OF THE SEWAGE DISPOSAL
FIELD DURING THE COURSE OF CONSTRUCTION OF THE SYSTEM.
10.) IN ACCORDANCE WITH 3 10 CMR 15.22 1, ALL SYSTEM COMPONENTS SHALL BE MARKED WITH
MAGNETIC MARKING TAPE.
1 1 .) THERE ARE NO KNOWN WELLS WITHIN 100' OF THE PROPOSED SOIL ABSORPTION SYSTEM.
12.) FROM THE DATE OF THE INSTALLATION OF THE 501L ABSORPTION SYSTEM UNTIL RECEIPT OF THE
CERTIFICATE OF COMPLIANCE, THE PERIMETER SHALL BE STAKED AND FLAGGED TO PREVENT USE OF THE
AREA THAT MAY CAUSE DAMAGE TO THE SYSTEM.
13.) THE DE51GNER WILL NOT BE RESPONSIBLE FOR THE SYSTEM AS DESIGNED UNLE55 CONSTRUCTED
AS SHOWN ON PLAN. ANY CHANGES SHALL BE APPROVED IN WRITING BYTHE DESIGNER.
14.) THE BOARD OF HEALTH REQUIRES INSPECTION OF ALL CONSTRUCTION BY AN AGENT OF THE BOARD
OF HEALTH AND THE DESIGNER. THE DESIGNER SHALL CERTIFY IN WRITING THAT THE SEWAGE DISPOSAL
SYSTEM WAS IN5TALLED IN ACCORDANCE WITH THE TERMS OF THE PERMIT AND THE APPROVED PLANS.
48 HOURS ADVANCE NOTICE IS REQUESTED.
15,) LOCATION OF UTILITIES IS APPROXIMATE AND CONTRACTOR SHALL BE RESPONSIBLE FOR
DETERMINING THE LOCATION OF ALL UNDERGROUND AND OVERHEAD UTILITIES PRIOR TO COMMENCEMENT
OF ANY WORK. THIS INCLUDES, BUT 15 NOT LIMITED TO, REQUESTS TO DIGSAFE, ANY PRIVATE UTILITY
COMPANIES, AND THE LOCAL WATER DEPARTMENT.
16.) CONTRACTOR SHALL VERIFY THAT ALL WASTELINES ARE CONNECTED BY WATER TESTING WITHIN THE
DWELLING PRIOR TO INSTALLATION OF ANY SEPTIC COMPONENTS.
17.) CONTRACTOR SHALL VERIFY EXISTING INVERT ELEVATIONS PRIOR TO INSTALLATION OF ANY SEPTIC
SYSTEM COMPONENTS.
18.) INSTRUMENT SURVEY CONDUCTED FOR PROPOSED WORK ONLY. SITE PLAN SHALL NOT BE USED FOR
STAKING, OR ANY OTHER PURPOSES,
19.) THIS PLAN DOES NOT CERTIFY, GUARANTEE OR WARRANTY COMPLIANCE WITH DEEDED OR ZONING
BYLAWS, SPECIFICALLY, BUT NOT LIMITED TO, SIDELINE SETBACKS AND BUILDING HEIGHT RESTRICTIONS.
OWNER IS RESPONSIBLE FOR OBTAINING SUCH A DETERMINATION FROM THE APPROPRIATE AUTHORITY.
20.) TEST HOLES COMPLETED PER STATE ENVIRONMENTAL CODE, TITLE 5. SOILS CAN BE VARIABLE AND
TEST HOLE DATA 15 NO GUARANTEE OF SOIL CONDITIONS IN OTHER AREAS. IF SOILS DIFFER FROM
THOSE SHOWN IN THE SOILS LOGS, DESIGN ENGINEER IS TO INSPECT THE SOILS PRIOR TO PROCEEDING
WITH INSTALLATION OF ANY SEPTIC COMPONENTS.
2 1.) EXISTING SEPTIC COMPONENTS TO BE LOCATED, PUMPED DRY, FILLED WITH CLEAN SAND AND
ABANDONED IN PLACE. AREA TO BE COMPACTED TO MINIMIZE SETTLING.
22.) EXISTING SEPTIC COMPONENTS TO BE REMOVED. ANY CONTAMINATED SOIL SHALL BE REMOVED
FOR A DISTANCE OF FIVE (5) FEET LATERALLY FROM THE SOIL ABSORPTION SYSTEM AND REPLACED WITH
CLEAN SAND, AREA TO BE COMPACTED TO MINIMIZE SETTLING.
TWENTYFIVE (25) A05 ARC361YC p,
(36/65D2) LEACH CHAMBERS IN BED
CONF/GURAT/ON WITH FIVE (5) ROWS
OF FIVE (5) CHAMBERS
LEACH CHAMBERS EL /2.5f Bottom of Test Hole
SYSTEM DESIGN CALCULATIONS
,SEWAGE DESIGN PLOW REQUIRED: 4 BEDROOM DWELLING Qa
/ /0 GPD/BEDROOM = 440 GPD REQU/RED
5FWAGE DE51GN FLOW PROV/OFOr TWENTYFIVE (25) AD5 VN/T5 IN BED
CONFIGURATION 1N FIVE (5) ROWS OP FIVC (5) UN/75 EACH,
Vt = !(440/0.74)/(4.8 FTz/PT)/5.CLFJ = 24.7/105 UN/T5
REQUIRED (25 PROVIDED)
444 GPD PROVIDED > 440 GPD FFQU/RED
.5EPT1C TANK CAPAC/TYREQUIREO: 440 GPDX 200% = 680 GPD REQU/RED
5EPT1C TANK CAPAC/7YPROV/DED: /500 GALLON 5FPTIC TANK
A GARBAGE D/SP05AL 15 NOT PCRM/TTED WITH TH15 DE514GN FLOW
I NSTALLER TO VERI FY THE LOCATION OF ALL
- -
UNDERGROUND -AND -OVERHEAD UTILITIES
PRIOR TO THE START OF ANY EXCAVATION
ACTIVITIES AND RELOCATE AS NECESSARY
(SEE NOTE # 15)
TEST HOLE LOGS
Test Hole # I (E-722.8 )T
EXISTING SPOT GRADE
Depth
Layer
Sod Class
Sod Color
Comr
0"-4"
A
Fine -Medium Loamy Sand
I OYR 3/1
OVERHEAD UTILITY LINES
4"-27"
B
Medium Loamy Sand
1 OYR 6/8
27"-120"
C I
Fine -Medium Sand
I OYR 6/6
40%
5T
SEPTIC TANK
De__ -_
_051R 5UTION_BOX _._-----:---_-
Perc
BOX
TWENTY FIVE (25) ADS ARC36HC (36 16BD2)
LEACH CHAMBERS IN BED CONFIGURATION WITH
FIVE (5) ROWS OF FIVE (5) CHAMBERS
25'
FLAN VIEW
SCALE: I " = 10'
1175pectIM Pori (see Note 04)
.r
q ,
/,1 �1
/'Arid" % ` ► YJ
t�e�.9 Ivay
r�j4) l i S 76os '4
011
l <°� 0�
C)
- ( -- -
Existing Dwelling Secy_
i (to be Razed)
\ \ 122.2
L JQ o5
M
M�
N
LO
LO
m
11 BENCHMARK
Top Gas Gate
EL --22.5 (Assumed Datum)
?2. / 0, 0 212
O
r ---
r\1 I T 1
1 m --i 1
/1111
F-iComponents to be
Abandoned or Removed as
I --J 1 N,"ceesary (see Notes #2/ 4t 22)
0 11 I I I
1 i i 1
22
/. &.sting septic Components to be
\ D Abandoned or Removed as
N iecessaiy (5ee Notes #2 / 4 22)
~� r 0 O
- O m N
A i 01 01 of O '
OF
MgSs4
�e\Ur9
M/
o� Fo "9aXo�' �t ➢ r a`' LI N DA J. cyG1F
\ (oP2AI+ PINTO
22.0 1 U f CIAL
NAL
Test Hole #2 (EL=22.5±)
EXISTING SPOT GRADE
Depth
Layer
Soil Class
Soil Color
Comments
O"-3'
A
Fine -Medium Loamy Sand
I OYR 3/1
OVERHEAD UTILITY LINES
3"-26"
B
Medium Loamy Sand
I OYR 6/8
26"-120"
C I
fine -Medium Sand
I OYR 6/6
40% Gravel
°
DATE OF TESTING: 09115114 INSPECTION NOTE:
SOIL EVALUATOR: LINDA J. PINTO, P.E., OCEANSIDE SEPTIC, INC
BOARD OF HEALTH AGENT: AMY VON HONE, YARMOUTH HEALTH DEPARTMENT PRIOR TO FINAL INSPECTION BY THE ENGINEER, SYSTEM
PERCOLATION RATE: LESS THAN 2 MIN/INCH IN "C' LAYER NEEDS TO BE COMPLETE INCLUDING BUILDUP FOR COVERS.
NO GROUNDWATER ENCOUNTERED
r
2 0 SITE FLAN
Ynrmoeth Henbth Department
APP: VE3
lalme Date
O 20 40 GO
SCALE 1 "=20'
C:\Ocean5ide\05.lacqueime\05-Jacqueline-SDS Plan.dwg
YARMOUTH,
MA
SITE LOCUS
NOT TO SCALE
1.) Assessor's Map 29 Parcel 39
2.) Deed Book 5222 Page 79
3.) Plan Book 165 Page 85 F2 Lot 30A
4.) This property is not in a Zone II of a Public
Water Supply
5.) Flood Zone: C
LEGEND
I _=
EXISTING SPOT GRADE
24x5
PROPOSED SPOT GRADE
-----z, ---
EXISTING CONTOUR
24-
PROPOSED CONTOUR
w
WATER SERVICE LINE
O
OVERHEAD UTILITY LINES
U
UNDERGROUND UTILITY LINES
G
GAS SERVICE LINE
EDGE OF CLEARING
-�- 7P
FENCE
O
TEST HOLE LOCATION
5T
SEPTIC TANK
De__ -_
_051R 5UTION_BOX _._-----:---_-
5A5
SOIL ABSORPTION SYSTEM
ZONING: R25
Lot Size: 25,000 S.F.
Lot Frontage: 150'
Setbacks:
Front: 30'
Side: 15'
Rear: 20
Maximum Building Coverage: 25%
Proposed Building Coverage: 16%
1 �
16 Z[l15
�I
M8 ,to
ee"i
WLIM
REVISION 10/26/ 15: Revised Proposed Dwelling and Driveway.
REVISION 11/ 14114: Revised Top of Foundation and grading, Survey datum,
added reserve area square footage.
Prepared for:
Andrew Webb
200 Hinckley Rd., Milton, MA 02186-2853
Proposed 51te �t Sewage Disposal System
G Jacqueline Circle, Yarmouth, MA
Prepared by:
��L1 LJ LJ�
ENGINEERING DIVISION
P.O. Box201, Brewster, MR 02631 Phone: (508) 896-1513
Date: 10/10/14 1 Scale: A5 Shown I By: UP I Check: MLA I Project No. 0514075
V z t