HomeMy WebLinkAboutEngineered Plan - 2016INVERT ELEVATIONS:
INDICATES
N INVERT OUT SEPTIC TANK:
103.0
INVERT IN DIST. BOX:
102.57
INVERT OUT DIST. BOX:
102.4
INVERT IN LEACH CHAMBER:
102.0
0. HORIZON
BOTTOM OF LEACH CHAMBER.
100.0
A
ADJUSTED GROUND WA TER:
N/A
-G
OBSERVED GROUND WATER:
N/A
18- -----
BOTTOM OF TEST HOLE #1:
94.0
V.
, 1
( 1 I
\ ( I
I I I
I \ I { 1
1 1 1 \ I
I I \
I I I I I I I
o
ACCESS COVERS MUST BE WITHIN 9` MINIMUM. MIN 2- OF PEASTONE
6* OF FINISH GRADE 6' MAXIMUM COVER OR F I L TER FABRIC
FIRST 2' TO
BE LEVEL 4'vENT WITH
CHARCOAL FILTER
18- MIN
T3/4" - I 1/2" DIA.
/03. / 02.4 2 ' �° DOUBLE WASHED STONE
GAS 102.57 1X I 102.0 °o 100.0
BAFFLE
3 OUTLET 2-500 GAL LEACHING CHAMBERS
EXISTING D -BOX W/4' STONE AROUND. 12.8'N x 25-I x 2'd
1000 GAL H-20
SEPTIC TANK, 6' CRUSHED STONE OR 1�
COMPACTED BASE
PROF I LE: NOT TO SCALE
I I e l l 1
-4 I \ \ \ ppb
I L �REM(�VAd I �4i/vo \\ 0'o o
9EE NOT 9. I 1 I 1 p 4y �0
NO I / / l !09.71 !{03.2 / / I \ J0
ty+111/-81 I o l 1 A P47N I / 0
16/.21 \ P4
401
D -B
0::.:\
12-5001 GALLdN I \ EXISTING
l LEAChING C1hAMB#'RS • • • :::::. , \ \ / PIT I Qy \ \ 1
W/4f STONE AROFND 1\
\
O5. ..... \ / 02.2
l l \\ \ \ l� 1 \ \
ry12.3 I I 1 +108.6\.....:...�.':.'$
0 \
DESIGN CRITERIA
DESIGN FLOW:
3 BEDROOMS AT 1/0 G.P.D. PER
BEDROOM EQUALS 330 G.P.D.
NO GARBAGE GRINDER
SEPTIC TANK REQUIRED:
330 G.P.D. X 2001 - 660 GAL.
SEPTIC TANK PROVIDED: 1000 GAL. EXISTING
SOIL ABSORPTION SYSTEM REQUIRED:
DESIGN PERC RATE C 5 M I N/ I NCH
SOIL TEXTURAL CLASS - I
EFFL UENT L OAD I NG RA TE - 0. 74 GPD/SF
330 GPD / 0.74 GPD/SF - 446 S.F. REQUIRED
PROVIDED: 2-500 GAL LEACHING CHAMBERS
W/4' STONE AROUND, A-471 S.F.
471 S.F. x 0.74 - 348 G.P.D.
SOIL TEST PIT DATA
INDICATES
INDICATES
PERCOLATION
=
OBSERVED
TEST
-
GROUNDWATER
TP +1
-W
0. HORIZON
TEXTURE
COLOR 104.0
A
LOAMY
IOYR
-G
SAND
2/2
18- -----
------- - -- 102.5
B
LOAMY
IOYR
SAND
4/4
36' -----
- --- - -
- --- 101.0
C /
MED -COARSE
IOYR
SAND AND
5/8
GRAVEL
SPOT ELEVATION
54-
.......
4
; \\ QP I \ SECOND FLOOR PLAN 110- I NO WATER I 94.0
LAMP / / \ EXISTING
I
lo3\AEPTIC TANK\
DATE: MAY 18. 2016 ( I I I I \ / 1 I / TEST BY: STEPHEN HAAS
WITNESSED BY: PHIL RENAUD
By CORNER -BRICK _ _2LAMP I ----- Tk M1N/1NCH�
- =
L- I - � -•. - - _
EL -107.09-
1
o I
\ A�
L 0CUS MAP
F_
L 0 T 32
2/.085± S.F.
Permit valid for REPAIR OF SEPTIC S\'S'1'Fm
ONLY, due to State and Local septic variances.
Boar. of health review and approval i, required for
an.future additions/renmmions/aIterations to
se ;age facilities and/or structures/dwelling.
1a.rrtotith lichillt Department
APOP (.)V EP,/,�A/
GENERAL NO TES :
I. THIS PLAN IS FOR THE DESIGN AND CONSTRUCTION
OF THE SEWAGE DISPOSAL SYSTEM ONLY.
2. VERTICAL DATUM IS ASSUMED. FOR BENCH MARKS
SET, SEE SITE PLAN.
J. ALL CONSTRUCTION METHODS AND MATERIALS AND
MAINTENANCE OF THE SEPTIC SYSTEM SHALL
CONFORM TO MASS. D.E.P. TITLE 5 AND LOCAL
BOARD OF HEALTH REGULATIONS.
4. ALL SEPTIC SYSTEM COMPONENTS LOCATED UNDER
AREAS SUBJECT TO VEHICULAR TRAFFIC OR GREATER
THAN J' IN DEPTH SHALL BE CAPABLE OF WITH-
STANDING
ITH-
STANDING H-20 WHEEL LOADS.
5. ALL SEWER PIPE SHALL BE SCHEDULE 40 PVC OR
APPROVED EQUAL.
6. SEPTIC TANK AND D -BOX SHALL BE REINFORCED
PRECAST CONCRETE OR APPROVED POLYETHYLENE.
BOTH SHALL BE WATERTIGHT. D -BOX SHALL BE WATER
TESTED FOR LEVEL WHEN THERE IS MORE THAN ONE
OUTLET.
7. BEFORE CONSTRUCTION CALL -DIG-SAFE".
1 -888 -DIG -SAFE AND THE LOCAL WATER DEPT.
FOR L OCA T I ON OF UNDERGROUND UTILITIES •
8. EXISTING LEACH PIT TO BE PUMPED DRY AND
BACKF I L LED .
9. ALL UNSUITABLE MATERIAL (A & B HORIZONS)
ENCOUNTERED BELOW THE INVERT OF THE LEACHING
FACILITY TO BE REMOVED FOR A DISTANCE OF 5'
AROUND AND REPLACED WITH SAND IN ACCORDANCE
WITH TITLE 5.
VARIANCES REQUIRED:
TITLE 5, MAXIMUM FEASIBLE COMPLIANCE
SECTION 15.22/:(7) GENERAL CONSTRUCTION REQUIREMENTS FOR ALL SYSTEM COMPONENTS
THE TOP OF ALL SYSTEM COMPONENTS SHALL BE NO DEEPER THAN 36" BELOW GRADE,
A VARIANCE IS REQUIRED FOR THE SAS TO BE BETWEEN 3' AND 6' DEEP.
RECEIVED
OCT 7 01016
HEALTH DEPT.
Dati ✓
SSR T / C S YS 7E7M DE7S l ON
62 MERCHANT A VENUE . MAP l _27. PARCEL 30
YARMOUTHPORT. MA.
PREPARED FOR:
rzp 14 -
PETER & VIRGINIA ,AUDINO
SCALE : 1 a 20 ' SEPTEMBER 20, 2016
STEPHEN A. HAAS
ENGINEERING, INC
P . O . Box 16
South Denn i s MA 02660
( 508 ) 362-8132
J 0
JOB NO: 16-026
LEGEND
® CB
CONCRETE BOUND
-W
WATER L I NE
4
HYDRANT
-G
GAS LINE
OHW-
OVER HEAD WIRES
LIGHT POST
E-
UNDERGROUND ELECTRIC LINE
CATCH BASIN
-T-
UNDERGROUND TELEPHONE LINE
-CTV-
UNDERGROUND CABLEVISION LINE
+40.4
SPOT ELEVATION
0 /0 20 40
- .----40-------
EXISTING CONTOUR
40
PROPOSED CONTOUR
GENERAL NO TES :
I. THIS PLAN IS FOR THE DESIGN AND CONSTRUCTION
OF THE SEWAGE DISPOSAL SYSTEM ONLY.
2. VERTICAL DATUM IS ASSUMED. FOR BENCH MARKS
SET, SEE SITE PLAN.
J. ALL CONSTRUCTION METHODS AND MATERIALS AND
MAINTENANCE OF THE SEPTIC SYSTEM SHALL
CONFORM TO MASS. D.E.P. TITLE 5 AND LOCAL
BOARD OF HEALTH REGULATIONS.
4. ALL SEPTIC SYSTEM COMPONENTS LOCATED UNDER
AREAS SUBJECT TO VEHICULAR TRAFFIC OR GREATER
THAN J' IN DEPTH SHALL BE CAPABLE OF WITH-
STANDING
ITH-
STANDING H-20 WHEEL LOADS.
5. ALL SEWER PIPE SHALL BE SCHEDULE 40 PVC OR
APPROVED EQUAL.
6. SEPTIC TANK AND D -BOX SHALL BE REINFORCED
PRECAST CONCRETE OR APPROVED POLYETHYLENE.
BOTH SHALL BE WATERTIGHT. D -BOX SHALL BE WATER
TESTED FOR LEVEL WHEN THERE IS MORE THAN ONE
OUTLET.
7. BEFORE CONSTRUCTION CALL -DIG-SAFE".
1 -888 -DIG -SAFE AND THE LOCAL WATER DEPT.
FOR L OCA T I ON OF UNDERGROUND UTILITIES •
8. EXISTING LEACH PIT TO BE PUMPED DRY AND
BACKF I L LED .
9. ALL UNSUITABLE MATERIAL (A & B HORIZONS)
ENCOUNTERED BELOW THE INVERT OF THE LEACHING
FACILITY TO BE REMOVED FOR A DISTANCE OF 5'
AROUND AND REPLACED WITH SAND IN ACCORDANCE
WITH TITLE 5.
VARIANCES REQUIRED:
TITLE 5, MAXIMUM FEASIBLE COMPLIANCE
SECTION 15.22/:(7) GENERAL CONSTRUCTION REQUIREMENTS FOR ALL SYSTEM COMPONENTS
THE TOP OF ALL SYSTEM COMPONENTS SHALL BE NO DEEPER THAN 36" BELOW GRADE,
A VARIANCE IS REQUIRED FOR THE SAS TO BE BETWEEN 3' AND 6' DEEP.
RECEIVED
OCT 7 01016
HEALTH DEPT.
Dati ✓
SSR T / C S YS 7E7M DE7S l ON
62 MERCHANT A VENUE . MAP l _27. PARCEL 30
YARMOUTHPORT. MA.
PREPARED FOR:
rzp 14 -
PETER & VIRGINIA ,AUDINO
SCALE : 1 a 20 ' SEPTEMBER 20, 2016
STEPHEN A. HAAS
ENGINEERING, INC
P . O . Box 16
South Denn i s MA 02660
( 508 ) 362-8132
J 0
JOB NO: 16-026