HomeMy WebLinkAboutSE83-2092 OOC 32 Lewis Bay Blv - Updated with corrcet owner infoWPA FORM 5-ORDER OF CONDITIONS SPECIAL CONDITIONS -PAGE 10A OF 12 SE83-2092, David Bradbury 32 Lewis Bay Blvd, Yarmouth MA 1. The applicantlowner shall be responsible for having a copy of the "Order of Conditions" on the job site at all times and shall be responsible for insuring that all persons performing the permitted activity are fully aware of its terms and conditions. Failure to do so may result in the revocation of these "Orders", a fine or both. 2. The Conservation Commission, its agent(s) or assigned(s) shall have the express right of entry upon the job site at all reasonable times for the purposes of establishing compliance with the "Order of Conditions", "By -Laws" and "Regulations". Commission members and the Conservation Administrator may acquire any information, measurements, photographs, observations and/or materials or may require the submittal of any data/information deemed necessary by this Commission for that evaluation. 3. A preconstruction review shall be arranged by the contractor with the Conservation Administrator and shall occur prior to the commencement of any work. 4. Any change in the approved plan(s) shall require the Applicant to file, in writing, a notice of project change with this Commission. The Commission will determine the significance of the change and determine whether administrative approval or an "Amended Order of Conditions" is required. Should the project be changed without permission, or found by the Yarmouth Conservation Commission to be altered in any way from the approved plan(s), all work will immediately cease until the project is reapproved by the Commission. 5. The "Order of Conditions" is valid for three years from the date of issuance unless otherwise specifically noted in the "Orders". Extension Permit requests must be applied for at least 30 calendar days prior to the expiration date of the original Orders". Failure to do so will result in a new "Notice of Intent" filing. 6. Noncompliance with these conditions shall constitute grounds for an Enforcement Order and possible fines. Fines shall not exceed $300.00 per day/per violation. 7. A "work limit" line shall be established around the entire property with Erosion Controls (i.e straw bales, staked filter fabric, bark mulch, "silt sacks," products made with rice straw, and other weed -free products or approved by the Commission.) Hay bales are not allowed. It is the applicant's responsibility to implement and maintain appropriate and adequate erosion controls measures throughout the construction process. 8. All imported fill shall be clean and not contain any foreign debris such as cement, bituminous concrete, rubber, metal, trash, boulders, etc. Boulders will be allowed in specific instances if part of the project design. 9. Debris, including litter, shall be picked up immediately. Any excess material that is excavated from the job site shall be disposed of at a location approved by the Conservation Administrator or in a covered dumpster. No debris shall be allowed in a Wetland or Waterway. 10. Washing of equipment/tools shall be done OFF -SITE or handled in a manner appropriate by the Conservation Administrator. 11. No equipment shall be refueled, nor shall fuel be stored within 100 feet of a resource area.