Loading...
HomeMy WebLinkAboutEngineered Plan - Rev. 1998CLEAN SAND HORIZ TEXTURE LOAM AND SEED MOTT. OTHER 2" LAYERDF 0/A SANDY LOAM 1 /8" TO 1 2" ROOTS MINIMUM WASHED TONE VENT 16'R5/6 SCALE 1.. 20• ROOTS z Cl 1 CU. FT. OF 10 R6/2 REVISED CONCRETE 72-15 C2 ANCHOR 5GY ' TIGHT C3 C1 q� OTf t?^.J b l7Ci L30 C'iZ� CiLI Q F]G1 C3 rJ Qta ClC� OC3 L3C7 Ab : L6c,TID.�:t'�. ro7Cte�,�`r3l CfJ- [�IRiOqi 4O�1Cl71 10 " �bGi.cbO:'y]''F�Crp1j1s+sAvr2 iR7y9+s.7a-.I ELEV.p - .y .-- ^� �rGYaa']�t4o�-Y rcGG._tsliGr��3.� v=f HIGH CAPASCTITYI WITH ' ONEINILAiRATORS X ?Io X 10" FIELD FORMATION z WELL SDW 252 SOIL ABSORPTION. i �- NDEX 47.3 ADJUST 1.4 SYSTEM (SAS) V. _ 2.9V. 1.5 V. = 0.5 USGS PROBABLE WATER TABLE SEWAGE DISPOSAL SYSTEM PROFILEoeSERVEo WATER TABLE ( 9/ 24/ 97 ) NOT TO SCALE BOTTOM OF TEST HOLE l { �o j), y7v.w?I /a, 3 7o n 4-% 7G. r 1 lr SOIL TEST DATE OF SOIL TEST sFPT, ?4. 1997 SOIL TEST DOME BY SWEETSER 'ENGINEERING i WITNESSED BY A 1012HY tn.3 OBSERVATION HOLE 1 ELEV.- 10 -- OBSERVATION HOLE 2 ELEV.-- 18 PERCOLATION RATE < 16 MKIINCH ' AT 46 INCHES PERCOLATION RATE �-, 2 MIN,/INCH AT Z INCHES DEPTH HORIZ TEXTURE CALOR MOTT. OTHER 0-9 0/A SANDY LOAM 10183/3 ROOTS 9-33 B LOAMY SAND 16'R5/6 SCALE 1.. 20• ROOTS 33--72 Cl SILT LOAM 10 R6/2 REVISED TIGHT 72-15 C2 SILT CLAY LOAM 5GY ' TIGHT NO WATER ENCOUNTERED AT15On _ ELEV. _ 4.3 OBSERVATION HOLE 3 ELEvA-15-5-- PERCOLATION RATE' < 115 WiLlINCH AT 41 INCHES DEPTH HORIZ TEXTURE COLOR MOTT. OTHER 0-10 O/A SANDY LOAM IOYR3/2 ROOTS 10-30 B LOAMY SAND 10YR6/3 SCALE 1.. 20• ROOTS 30-42 Cl FINE SAND 1OYR6/2 REVISED REVISED 42-102 C2 SILT LOAM 10YR6/2 TIGHT 02-18 C3 SILT CLAY LOAM 5GY DEPTH HORIZ TEXTURE COLOR MOTT. OTHER 0-11 0/A SANDY LOAM 10YR3/2 ROOTS 11-26 B LOAMY SAND 10YR5/8 SCALE 1.. 20• ROOTS 26-38 Cl FINE SAND 10YR6/4 REVISED REVISED 38-108 C2 SILT LOAM 10YR6/2 TIGHT 08- 131 C3 SILTLOAMY 5 G . NO WATER ENCOUNTERED AT 38 .. ELEV. OBSERVATION HOLE 4 ELEV.ws 15.9 PERCOLATION RATE < 3_.._ MIN./INCH AT 44 INCHES PERCOLATION RATE� 7.-. MIN./INCH AT7, 0 _ INCHES DEPTH HORIZ TEXTURE COLOR MOTT. OTHER 0-10 0/A SANDY LOAM 10YR3/2 10-30 B LOAMY SAND 10YR5/8 SCALE 1.. 20• DATE DEC. 11. 1997 30-51 Cl FINE SAND 10YR6/3 REVISED REVISED 51-100 C2 SILT LOAM 10YR6/2 04-15 03 SILT CLAY LOAM 5GY �. r} L z I„J.} rwc '� T WATER ENCOUNTERED AT ? 5..� . ELEV. *z 1.5 NO WATER ENCOUNTERED AT -150' ELEV. �.... i I DESIGN CALCULATIONS NOTES: P xarnpti?n�tc 4 1. ALI WORkCMANSHIP AND MATERIALS SHALL'CONFORM TO `D.E.P. - --- - - �. _ - ----- - SiND THE TOWS! OF YARMOUTH RULES; AND J -r -j.- I I .. 7. _. - : l •-- :u i"E'i:.6 r"i ,s i... i%...ri L; �/a'4a w1 i.T. } �... -..� r�. A �". ,r. ."' C . _.. �y GULA iIGIvS F(Jr� Tlic SUfiSil#�F 40E DISPOSAL Or . EVIAGI r J >a )S ' ' _ -,40 6A ,1 UAY 2. ALL COVLRS TO SANITARY UNITS SHALL 8E BROUGHT TO . - - - 18i 1i�.... �° iJS '.., it J°� t .i\ i.�#�t. } M•. " REQUIRED SEPTIC TANK CAPACITY 880 GAL. WITHIN 6" OF "FINISHED GRADE. ACTUAL SIZE OF SEPTIC TANK 1500 GAL 3. ALL COMPONENTS OF THE SANITARY SYSTEM SHALL BE CAPABLE 0 SOIL CLASSIFICATION Ill WITHSTANDING H-10 LOADING UNLESS THEY ARE UNDER OR WITHIN DESIGN PERCOLA11ON RATE < 20 MIN./Ill 10 FT. OF DRIVES OR PARKING AREAS. H-20 LOADING SHALL 8E EFFLUENT LOADING RATE 0,34 CAL./DAY/S.F. USED UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS.. ' LEA('HING AREA 297 r- ,SQ. FT,,, 4. ANY MASONARY UNITS USED TO BRING COVERS TO GRADE SHALL 3L X 3h `G BE .MORTARED IN PLACE. \` LEACHING CAPACITY (AREA X RATE) `��' �' GAL/DAY 5. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH r2%- X 0.34 ! DEEDED OR ZONING REGULATIONS. OWNER / APPLICANT IS TO 4/ RESERVE LEACHING CAPACITY � DETERMINAT10N FROM APPROPRIATE AUTHORITY. 6 GAL./DAY OBTAIN SUCH 6. UTILITIES SHOWN ARE APPROXIMATE ONLY, EXCAVATION CONTRACTO IS TO CALL "DIG --SAFE" AT 1-8$8--344-7233 AT LEAST 72 HOUR: 4 PRIOR TO COMMENCING WORK ON SITE. 7. PARCEL IS IN FLOOD ZONE C. Oj 8. ALL UNSUITABLE MATERIAL SHALL E REMOVED FROM UNDER AND FOR A MINIMUM OF 5* ABSORP11ON �6. r 9. ALL DISTURBED REAS AREUND TO BE SOIL- REVEGETATED. SYSTEM. 10. DESIGN ENGINEER AND HEALTH DEPARTMENT ARE TO INSPECT THE p ; SEP11C SYSTEM ON THE FOLLOWING SCHEDULE: A. SURVEYOR IS TO STAKE OVERDIG. B. ENGINEER IS TO INSPECT OVERDIG PRIOR TO FILLING. C: ENGINEER IS TO INSPECT PLACEMENT OF SEPTIC COMPONENTS I PRIOR TO BACKFILLING. j' 11. DESIGN ENGINEER IS TO CERTIFY INSTALLATION OF ` SEPTIC SYSTEM ACCORDANCE WITH THIS PLAN. 12. SEPTIC TANK AND DISTRIBUTION BOX ARE TO BE SET ON A 6" BE OF 3/4" TO 1 1/2" STONE. T A. 13. LOT IS SHOWN ON ASSESSORS MAP 132 AS PARCEL S5 ou#,,s 14. CONTRACTOR IS TO VERIFY GRADES AND ELEVATIONS AS WELL AS No. 3 ' SITE CONDITIONS PRIOR TO COMMENCING WORK ON SITE. ' •d 9i APPR0VED YARMOUTH COi�MITTEE oKwil® LEGEND: EXISTING SPOT ELEVATION 00x0 EXISTING CONTOUR----00---- FINAL SPOT ELEVATION Foo.61 FINAL CONTOUR Z 00 SOIL TEST LOCATION UTILITY POLE --(>- TOWN WATER -W- -W CATCH BASIN (®� GAS LINE G APPROVED: B RD OF EALTH -34 7A - DATE AVENf 4 01997 SWEETSER ENGIN ' LOCUS 0 joPROJECT 0C25 ANNOCI i Z ft U I � PROPOSED SEPTIC DESIGN FOR DAVID & BARBARA CLANCY LOCATIONLOT 5 LOCH RANNOCH WAY, YAR SWEEE'TSER ENGINEERING 235 GREAT WESTERN ROAD P. 0. BOX 713 398-3922 SOUTH DENNIS, MASS. 02660 SCALE 1.. 20• DATE DEC. 11. 1997 REVISED REVISED LOC:�TION MAP JOB NO. 40328 JSHEET 1 -OF 1 01997 SWEETSER ENGIN