Loading...
HomeMy WebLinkAboutEngineered Plans - 2017REMOVE EXISTING LEACH PIT AND ALL ASSOCIATED CONTAMINATED MATERIALS AND REPLACE WITH CLEAN MEDIUM SAND PER TITLE 5 (370 CMR 15.255(3)). INSTALLER MAY MOVE VENT PIPE TO A DIFFERENT LOCATION. i TREE REMOVAL AT INSTALLERS DISCRETION. A SAMPLE OF THE C SOIL WAS SUBMITTED FOR SIEVE / o ANALYSIS AND WAS FOUND TO BE 99% SAND WITH AN ASSIGNED PERCOLATION RATE OF 2 MINUTES PER INCH / p 0 6�1S DATUM ASSUMED 0 N SCALE: I in = 20 ft O 20 40 O 70 20 PRINT ON 8-1/2 x 14 in PAPER FOR PROPER SCALE VARIANCE REQUESTED 310 CMR 15.221(7) — COMPONENT DEPTH TO FINISH GRADE. 36 in MAX REQUIRED — VARIANCE TO 72 in OF COVER REQUESTED. YARMOUTH. MA BUCd /SZAND n R04D �o NOT v� TO Q 9 SCALE tQ m ROUT — MAIN STREET LOCUS MAP 25 30 �CFTIC INr � �,T C�.�-TES-H UV FLOOR PLAN BATH BED BATH KIT BA FAMILY PLAY ROOM CHEN TH ROOM ROOM BEDROOM BED LIVING OPEN rRlv�cr ROOM ROOM OPEN UPPER FLOOR MAIN FLOOR BASEMENT mit valid for RVIII 11 11M SF'P7'1(' SN S fH:M LY, due to Stale an I ii :�l ,ctH�c varian� cs. ��} tisk,' <yi Mrd/1"tilVe Health review am additions/rem .++�untiieltrratiw ( rfo agr facilities anti/or stru�tu ����c•IbuK, a,�;f� o �A� S ALE :''}`i �APPRON'E rmouth llealth (lel: in`:i:ent Ilia. T LJ `X-77, diff t'f�i fi '0.98 QC +— pe LAND CO UR PLAN 8�8— )ate I / 40 8768Z izzy� C a, o l.• a F L EG ND SEPTIC COMPONENTS EXISTING 1000 GAL SEPTIC TANK •EXISTING LEACH PIT/ CESSPOOL DISTRIBUTION BOX e❑ TEST PIT O PR POSED �SA S SEE DETAIL A ON BACK O �z N A Iv -A VEN; �9 PI Pt 38 THIS ISA 39� \ �VL�m �. PLAN USE COLOR PLAN ONLY FOR INSTALLATION FULL DETAIL IS BEST VIEWED IN FULL COLOR /Q GAR G R �41 OT /'\v( OWED 4 O) i SEWAGE DISPOSAL oF'Nsss9 P�jH oFsass -l� SYSTEM PLAN DAVIDOyGJ�� DAVID 90�G -TD SERVE EXISTING DWELLING D. D. � ROBIN H FAUGHT C) COUGHANOWR N v COUGHANOWR No. 1093 No. 461 •' c/o US BANK TRUST DWNERISI OF RECORD �FGI -PP VES �, � � ��� ' 0 69 CAMP STREET VAS ` J YARMOUTH. MA 155 Geo Ryder Rd S PROPERTY ADDRESS Chatham, MA 02633 Davidcou@Hotmail.com DATE FEBRUARY 12. 2017 508 364-0894 PG l/2 Joer ETE-4132 .F. S O � L TEST LOG JANUARY 11, 2017 SOIL EVALUATOR: DAVID D. COUGHANOWR. ASE *461 WITNESSED BY: AMY VON HONE. HEALTH DEPT. TEST PIT 1 NO GROUNDWATER ENCOUNTERED 2 MIN/INCH IN C SOILS ELEVATION Cto] &fez 34.67- 28.50 - DEPTH INCHES SOIL HORIZON USDA SOIL TEXTURE SOIL COLOR (MUNSELL) SOIL MOTTLES OTHER 0-44 FILL READING 9.27 ADJUSTMENT 4.77 44-52 Ap SANDY LOAM 10 YR 3/2 NONE FRIABLE 52-70 Bw LOAMY SAND 10 YR 4/6 NONE FRIABLE 70-144 C MEDIUM SAND 10 YR 514 NONE LOOSE OBSERVED GW NONE AT 22.65 INDEX WELL MIW-230 ZONE C READING DATE JANUARY 2017 READING 9.27 ADJUSTMENT 4.77 ADJUSTED GW BELOW 27.42 TEST PIT 2 UNWITNESSED FEB 12 201? ELEVATION 25.00 NO GROUND WATER 22.65 1000 GALLON SEPTIC TANK TANK TO BE PUMPED DRY AT TIME OF INSTALLATION AND EXAMINED FOR STRUCTURAL INTEGRITY. INSTALL NEW PVC OUTLET TEE EQUIPPED WITH A GAS BAFFLE. REPLACE WITH A NEW I In 1500 GALLON TANK TAPER IF CRACKED, ROTTED OR OTHERWISE "- COMPROMISED. S O 0 O NOT TO uo SCALE i ft -6 INLET OUTLET CO VER CO VER F/N DROPFLOW LINE FROM 14 TO BUILDING 1^ D -BOX . 48 in LIQUID GAS LEVEL BAFFLE 6 in STONE BASE lF NEW SEPARATION BETWEEN INLET & OUTLET TEES NO LESS THAN LIQUID DEPTH CROSS SECTION VIEW D§ S TR § B U T §OIIV � OW uSE DB -3 H20Y DIMENSIONS PIPES EXITING D -BOX TO RUN LEVEL AND DETAIL FOR 2 FEET BEFORE PITCHING DOWN 12 i MIN ,.FROM •TANK ' SAS TO STONE6 in CROSS SECTION VIEW DESIGN FLOW: 3 BEDROOMS X 110 GPD = 330 GPD SEPTIC TANK: 330 GPD X 2 DAYS = 660 GALLONS USE EXISTING 1000 GALLON SEPTIC TANK IF IN SOUND STRUCTURAL CONDITION. IF NOT, INSTALL NEW 1500 GALLON SEPTIC TANK. DISTRIBUTION BOX: INSTALL UNIT DEPICTED BELOW. SOIL ABSORBTION SYSTEM: THE LONG TERM ACCEPTANCE RATE FOR A CLASS ONE SOIL WITH A PERCOLATION RATE BELOW 5 MINUTES PER INCH = 0.74 GALLONS PER DAY PER SQUARE FOOT. THE 24 ft x 12.5 ft x 2 ft LEACHING GALLERY DEPICTED BELOW CAN LEACH: BOTTOM AREA = (24 x 12.5) = 300 sq. ft. SIDEWALL AREA = (24+24+12.5+12.5)x2 =146 so. ft. TOTAL AREA = 446 sq. ft. FLOW CAPACITY = 0.74 x 446 = 330.04 gal/day INSTALL A 24 ft x 12.5 ft x 2 ft GALLERY AS CONFIGURED BELOW. FLOW CAPACITY = 330.04 gal/day WHICH EXCEEDS THE 330 gal/dog REQUIRED FOR A THREE BEDROOM DESIGN. SO§L ABSORP 1I h'Oo N QYq XrAV rnNSTRI1rTInN I)FT411 USE SHOREY PRECAST 500• DRYWELL DRYWELL 24.0 ft UNIT M OD � �I co Lo EEI J v (V'•. CV �I �y I , 1 -Amo STONE ft 8.5 ft 8.5 ft 3.5 ft 1.3.5 11 500 GALLON DRYWELL DIMENSIONS & DETAIL INSTALL ONE INSPECTION RISER TO WITHIN THREE INCHES OF FINAL GRADE & INDICATE LOCATION ON AS -BUILT 0�0 36 as 00 aoa�OaczaOQO n USE 000c 0j IZ3 00 000 H-20 czIdQc- Q ( RATED UNITS --n 102 n CROSS SECTION VIEW INSTALL AN APPROVED GEOTEXTILE FABRIC OVER STONE 2E 3/4 in TO 0 24 in 3/4 in TO 1-1/2 in GRAVEL EFFECTIVE. 1-1/2 in GRAVEL in . DEPTH ■ �k 46 in 58 in 46 in 150 in -INSTALLER TO OBTAIN DISPOSAL WORKS PERMIT BEFORE STARTING WORK. -ALL COMPONENTS INSTALLED SHALL MEET THE MINIMUM REQUIREMENTS OF MASSACHUSETTS TITLE 5 SEPTIC CODE (310 CMR 15). -INSTALLER TO VERIFY LOCATIONS OF ALL UNDERGROUND UTILITIES BEFORE EXCAVATING FOR SYSTEM. -ECO-TECH ENVIRONMENTAL RECOMMENDS THE INSTALLATION OF LOW FLOW FIXTURES & APPLIANCES. AND PERIODIC PUMPING OF THE SEPTIC TANK. -SEPTIC TANK IS NOT DESIGNED TO WITHSTAND VEHICULAR LOADING. DO NOT PARK OR DRIVE VEHICLES OVER SEPTIC TANK. [� L O W p � O F J L C -TOP EL OF FOUNDATION RAISE = 41.02 +- 6 in v v i/� COVERS TO WITHIN OF FINAL GRADESAND v v 1f ALL PIPE TO BE SCH. 40 PVC TO PITCH AT 1/8 in/ft MINE PrVNT EXISTING EXISTING 1 UN G ,01 1111 D -BOX j6, I Pa USE USE H-20 uNlrs TEE 35.50 MAX if RATED _jr�31111111110 f, mmm!51 PRECAST SEPM TANS 36.45 34.60 DRYWELL EXISTING REFER TO DETAIL BOX 6 /n SORPMON 34.77 STONE S00� AB BASE 34.50 SYSTEM —REFER TO EXISTING 6 !n STONE BASE IF NEW 11 ft 5-12 ft DETAIL BOX 32.50 NO GROUNDWATER Ln BELOW NO OBSERVED-4-1 27.42 SEWAGE DISPOSAL SYSTEM PLAN F69 CAMP STREET YARMOUTH, MA JIFEBRUARY 12, 2017 ETE-4132 PG 2/2