Loading...
HomeMy WebLinkAboutEngineered Plan - 2017LOCATION MAP ASSESSORS MAP: �o PARCEL: �J FLOOD ZONE_-_.__ REFERENCE:��17J_-- 5Wif1 t�w r-\,\ . n ku� IXAM 104 ri, LOWIM �14Y 22 AM 0 r 5Wif1 t�w r-\,\ . n ku� TEST {-TOLE LOGS SOIL EVALUATOR: t �� � � V W I TRESS : 0A h� DATE:- �' k 'O PERCOLATION RATE: vv J{ Ly. %DD %v Na&. -V/- TFI- i TH- 2 Cl IXAM 104 ri, LOWIM �14Y 22 AM 0 TEST {-TOLE LOGS SOIL EVALUATOR: t �� � � V W I TRESS : 0A h� DATE:- �' k 'O PERCOLATION RATE: vv J{ Ly. %DD %v Na&. -V/- TFI- i TH- 2 Cl 1 SEPTIC SYSTEM DESIGN FLOW ESTIMATE ' 7 BEDROOMS AT 1(D AL/DAY/BEDROOM - ZZQGAL/DAY ACANKT ZZ0 GAL/DAY x 2 DAYS • 44D GAL USE (DO GALLON SEPTI TANK �'itAOLr SOIL 'ABSORPTION SYSTEM 1 5 o 0H ?5 AwD Qty/ - SIDE AREA: Zx �.��� it'12�ZrJ/ �� = 1�31 1-D BOTTOM AREA: X .Z >C �7 Z�,q�O 3 9 ►�D SEPTIC SYSTEM SECTION I) The installation shall comps with Title V ani) Town of d Board of Ilealth Itegulations. 2) The installer shall verify [lie location of utilities, sewer inverts and septic components prior to installation and selling base elevations. 3) All gravity septic piping to be 4 inch Sch 40 PVC at 1/8" per root. The first two feet out of the d -box to the icaeliing shall be level. 4) This plan is not to be utilized for property line determination nor any other purpose other than the proposed system installation. 5) All septic components must meet'l'ille V specifications. 6) Parking sliall not be constructed over 1110 septic components. 7) 1'he property is bounded by property corners and property lines. 8) The property owner shall review design considerations to approve of total design flow and number of bedrooms to be considered for design. Receipt of payment for the plan and installation based oil the plan shall be dee►ned approval of the design flow by the owner. 9) The existing leaching or cesspools shall be pumped and filled with material per Title V abandonment procedures. Those within the proposed SAS shall be removed along with contaminated soil and replaced with clean sand per Title V specs. 10) System components to be 10 feet from water line. Sewer lines crossing (lie water line shall be sleeved with 4 inch SC1I 40 PVC with ends grouted if applicable. "Che proposed SAS is tieing installed below the water service line. 'I'Iie line is to be sleeved as aforementioned and maintained in place. 11) If a garbage grinder exists it is to be removed and is the responsibility of the owner to ensure such. 12)The histaller is to lake caution in excavation around the gas line ifsuch exists. 13)'I'he installer shall verify the location, quantity and elevation of the sewer lines exiting the dwelling'prior to the installation. 14)'This plan is representative only that a system can fit on a property meeting "Title V requirements. ,�;�,, t1> of DAVID MAsorl u; B DATE LYarmouthalth Department D Date HEALTH AGENT i I -.� .,✓ --ice 1,...� ��.t% nor SITE AND SEWAGE PLAN L 0 C A T 10 N : -A Z � 200' !�DA PREPARED FOR: 7fIWHI�2 f4ZLC aplaL SCALE: DAV I D B . MASONtb DATE: I I 7N DBC ENVIRONMENTAL DESIGNS EAST SANDWICH. MA (508) 833-2177 IXAM 104 ri, LOWIM �14Y 22 AM 1 SEPTIC SYSTEM DESIGN FLOW ESTIMATE ' 7 BEDROOMS AT 1(D AL/DAY/BEDROOM - ZZQGAL/DAY ACANKT ZZ0 GAL/DAY x 2 DAYS • 44D GAL USE (DO GALLON SEPTI TANK �'itAOLr SOIL 'ABSORPTION SYSTEM 1 5 o 0H ?5 AwD Qty/ - SIDE AREA: Zx �.��� it'12�ZrJ/ �� = 1�31 1-D BOTTOM AREA: X .Z >C �7 Z�,q�O 3 9 ►�D SEPTIC SYSTEM SECTION I) The installation shall comps with Title V ani) Town of d Board of Ilealth Itegulations. 2) The installer shall verify [lie location of utilities, sewer inverts and septic components prior to installation and selling base elevations. 3) All gravity septic piping to be 4 inch Sch 40 PVC at 1/8" per root. The first two feet out of the d -box to the icaeliing shall be level. 4) This plan is not to be utilized for property line determination nor any other purpose other than the proposed system installation. 5) All septic components must meet'l'ille V specifications. 6) Parking sliall not be constructed over 1110 septic components. 7) 1'he property is bounded by property corners and property lines. 8) The property owner shall review design considerations to approve of total design flow and number of bedrooms to be considered for design. Receipt of payment for the plan and installation based oil the plan shall be dee►ned approval of the design flow by the owner. 9) The existing leaching or cesspools shall be pumped and filled with material per Title V abandonment procedures. Those within the proposed SAS shall be removed along with contaminated soil and replaced with clean sand per Title V specs. 10) System components to be 10 feet from water line. Sewer lines crossing (lie water line shall be sleeved with 4 inch SC1I 40 PVC with ends grouted if applicable. "Che proposed SAS is tieing installed below the water service line. 'I'Iie line is to be sleeved as aforementioned and maintained in place. 11) If a garbage grinder exists it is to be removed and is the responsibility of the owner to ensure such. 12)The histaller is to lake caution in excavation around the gas line ifsuch exists. 13)'I'he installer shall verify the location, quantity and elevation of the sewer lines exiting the dwelling'prior to the installation. 14)'This plan is representative only that a system can fit on a property meeting "Title V requirements. ,�;�,, t1> of DAVID MAsorl u; B DATE LYarmouthalth Department D Date HEALTH AGENT i I -.� .,✓ --ice 1,...� ��.t% nor SITE AND SEWAGE PLAN L 0 C A T 10 N : -A Z � 200' !�DA PREPARED FOR: 7fIWHI�2 f4ZLC aplaL SCALE: DAV I D B . MASONtb DATE: I I 7N DBC ENVIRONMENTAL DESIGNS EAST SANDWICH. MA (508) 833-2177