Loading...
HomeMy WebLinkAboutEngineered Plan - 2003N ASSESSORS MAP: 70 PARCEL: 1 oFLOOD ZONE: C 1 RT 28 LOCUS LOCATION MAP PARCEL 1 (18,973 SF) 30.0 \ P 94.41 ,EL i V. 27.0 O coto � o FENCE 41 Q sT i :LP: :LP: �9. 5 1itIN \ ll�q Crpr SHO p TEST HOLE LOGS ENGINEER: THOMAS McLELLAN, P.E. WITNESS: LYNNE MULKEEN, R.S. DATE: 1-21-03 PERCOLATION RATE: < 2 MIN/IN TH-1 TH-2 28.5 A HORIZON 1, ELEV LOAMY SAND 16" fOYR 3/2 27.2 B HORIZON LOAMY SAND 36" 10YR 5/6 25E C HORIZON MED -FINE SAND 2.5Y 7/4 142-1 16.7 NO GROUND WATER ENCOUNTERED \ 30 \ GRAVEL \ DRIVE 1 �ENC� _SEED. 1 1: \ 30 a \ '29 29 I \ E >0, • �jN 28. 4 TH-1 UNDER SIZED SEPTIC TANK \ tw AND 2 LEACH PITS ARE TO BEA A W PUMPED AND FILLED WITH SAND OR REMOVED. KEY: EXISTING CONTOUR: - PROPOSED CONTOUR: ...•...•••..••...•..••....... EXISTING SPOT ELEVATION: 25.5 PROPOSED SPOT ELEVATION: 25 TEST HOLE: _$ • UTILITY POLE: -0- FENCE LINE: HYDRANT: -6- RETAINING WALL: TREE: 0 DM # ROUNS BENCHMARK AT WOOD STAKE ELEVATION = 28.6 DEMAREST-McLELLAN ENGINEERING 24 SCHOOL STREET P.O. BOX 463 WEST DENNIS, MASSACHUSETTS 02670 PHONE & FAX : (508) 398-7710 NOTES: 1. VERTICAL DATUM: ASSUMED FROM QUAD (NGVD +/-) 2. MUNICAPAL WATER. IS AVAILABLE. 3. SCHEDULE 40 - 4" PVC PIPE TO BE USED THROUGHOUT SEPTIC SYSTEM. 4. ALL PRECAST UNITS TO CONFORM WITH AASHTO H-10 & H-20 LOADING SPECIFICATIONS. 5. PIPE PITCH = 1/4" PER FOOT, (UNLESS NOTED OTHERWISE). 6. FIRST 2' OF PIPE OUT OF D -BOX TO BE SET LEVEL. 7. THE SEPTIC SYSTEM HAS NOT BEEN DESIGNED TO ACCOMODATE THE USE OF A GARBAGE DISPOSAL. 8. ALL CONSTRUCTION DETAILS ARE TO BE IN CONFORMANCE WITH THE. STATE OF MASS. ENVIRONMENTAL CODE (TITLE FIVE) AND LOCAL HEALTH REGULATIONS. 9. CONTRACTOR TO VERIFY LOCATIONS OF ALL UTILITIES PRIOR TO CONSTRUCTION. 10. GROUND COVER OVER ALL SEPTIC SYSTEM COMPONENTS NOT TO EXCEED 3.0'. SEPTIC SYSTEM DESIGN FLOW ESTIMATE: 4 BEDROOMS AT 110 GAL/DAY/BEDROOM = 440 GAL/DAY SEPTIC TANK: 440 GAL/DAY x 2 DAYS = 880 GAL USE 1500 GALLON SEPTIC TANK LEACHING AREA: USE 4 INFILTRATOR CHAMBERS (MODEL 3050) WITH 3.5' OF STONE ALL AROUND (37' x 11.2'x Z DEEP) SIDE AREA-- (37 + 11.2)2 x 2 = 193_(.74) = 143 GAL/DAY BOTTOM AREA: 37'x 11.2'= 414 SF (74) = 306 CAL/DAY CAPACITY = 449 GAL/DAY SEPTIC SYSTEM SECTION 31.6 ITFIRST FLOOR ELEV BED ROOM LIVING L ROOM r KIT. I BT H 2nd FLOOR BED KIT./ ROOM LIVING BATH KITCHEN BATH DINING CLOS. -- LIVING ROOM BED ROOM SUN PORCH 1st FLOOR, EXISTING FLOOR PLAN I0 COVERS WITHIN 12" OF FINISHED CRADE ONE INSPECTION COVER 0 BE WITHIN 6' OF CRADE) 3' MAX COVER 26.25 r� r \ ELEV. 25.5 1500 GAL ELEV. SEPTIC TANK \ 27.0 (6" OF STONE UNDER OR ELEV. MECHANICALLY COMPACTED) (EXIST.) . TEE SIZES: INLET: 6" UP, 13" DOWN OUTLET: 6" UP, 14" DOWN ID -BOX 25.83 26.0 (6" OF ELEV. ELEV. STONE UNDER) GAS BAFFLE 25.0 AT OUTLET TEE ELEV APPR VED BY: DATE: ' 30.2 ' OF 30. 2 C a� w•ti� � �' ;?�� ail. t. AG J ti. 'fit .. i r'>>, �• ��-.. CC� rrl�� �1 � 30 -�--W 11 �► .- ' 1 EXISTING C�' 1 4 BEDROOAf DWELLING 1st flr. elev. 31.6 4 `~ IN 30.0 \ P 94.41 ,EL i V. 27.0 O coto � o FENCE 41 Q sT i :LP: :LP: �9. 5 1itIN \ ll�q Crpr SHO p TEST HOLE LOGS ENGINEER: THOMAS McLELLAN, P.E. WITNESS: LYNNE MULKEEN, R.S. DATE: 1-21-03 PERCOLATION RATE: < 2 MIN/IN TH-1 TH-2 28.5 A HORIZON 1, ELEV LOAMY SAND 16" fOYR 3/2 27.2 B HORIZON LOAMY SAND 36" 10YR 5/6 25E C HORIZON MED -FINE SAND 2.5Y 7/4 142-1 16.7 NO GROUND WATER ENCOUNTERED \ 30 \ GRAVEL \ DRIVE 1 �ENC� _SEED. 1 1: \ 30 a \ '29 29 I \ E >0, • �jN 28. 4 TH-1 UNDER SIZED SEPTIC TANK \ tw AND 2 LEACH PITS ARE TO BEA A W PUMPED AND FILLED WITH SAND OR REMOVED. KEY: EXISTING CONTOUR: - PROPOSED CONTOUR: ...•...•••..••...•..••....... EXISTING SPOT ELEVATION: 25.5 PROPOSED SPOT ELEVATION: 25 TEST HOLE: _$ • UTILITY POLE: -0- FENCE LINE: HYDRANT: -6- RETAINING WALL: TREE: 0 DM # ROUNS BENCHMARK AT WOOD STAKE ELEVATION = 28.6 DEMAREST-McLELLAN ENGINEERING 24 SCHOOL STREET P.O. BOX 463 WEST DENNIS, MASSACHUSETTS 02670 PHONE & FAX : (508) 398-7710 NOTES: 1. VERTICAL DATUM: ASSUMED FROM QUAD (NGVD +/-) 2. MUNICAPAL WATER. IS AVAILABLE. 3. SCHEDULE 40 - 4" PVC PIPE TO BE USED THROUGHOUT SEPTIC SYSTEM. 4. ALL PRECAST UNITS TO CONFORM WITH AASHTO H-10 & H-20 LOADING SPECIFICATIONS. 5. PIPE PITCH = 1/4" PER FOOT, (UNLESS NOTED OTHERWISE). 6. FIRST 2' OF PIPE OUT OF D -BOX TO BE SET LEVEL. 7. THE SEPTIC SYSTEM HAS NOT BEEN DESIGNED TO ACCOMODATE THE USE OF A GARBAGE DISPOSAL. 8. ALL CONSTRUCTION DETAILS ARE TO BE IN CONFORMANCE WITH THE. STATE OF MASS. ENVIRONMENTAL CODE (TITLE FIVE) AND LOCAL HEALTH REGULATIONS. 9. CONTRACTOR TO VERIFY LOCATIONS OF ALL UTILITIES PRIOR TO CONSTRUCTION. 10. GROUND COVER OVER ALL SEPTIC SYSTEM COMPONENTS NOT TO EXCEED 3.0'. SEPTIC SYSTEM DESIGN FLOW ESTIMATE: 4 BEDROOMS AT 110 GAL/DAY/BEDROOM = 440 GAL/DAY SEPTIC TANK: 440 GAL/DAY x 2 DAYS = 880 GAL USE 1500 GALLON SEPTIC TANK LEACHING AREA: USE 4 INFILTRATOR CHAMBERS (MODEL 3050) WITH 3.5' OF STONE ALL AROUND (37' x 11.2'x Z DEEP) SIDE AREA-- (37 + 11.2)2 x 2 = 193_(.74) = 143 GAL/DAY BOTTOM AREA: 37'x 11.2'= 414 SF (74) = 306 CAL/DAY CAPACITY = 449 GAL/DAY SEPTIC SYSTEM SECTION 31.6 ITFIRST FLOOR ELEV BED ROOM LIVING L ROOM r KIT. I BT H 2nd FLOOR BED KIT./ ROOM LIVING BATH KITCHEN BATH DINING CLOS. -- LIVING ROOM BED ROOM SUN PORCH 1st FLOOR, EXISTING FLOOR PLAN I0 COVERS WITHIN 12" OF FINISHED CRADE ONE INSPECTION COVER 0 BE WITHIN 6' OF CRADE) 3' MAX COVER 26.25 r� r \ ELEV. 25.5 1500 GAL ELEV. SEPTIC TANK \ 27.0 (6" OF STONE UNDER OR ELEV. MECHANICALLY COMPACTED) (EXIST.) . TEE SIZES: INLET: 6" UP, 13" DOWN OUTLET: 6" UP, 14" DOWN ID -BOX 25.83 26.0 (6" OF ELEV. ELEV. STONE UNDER) GAS BAFFLE 25.0 AT OUTLET TEE ELEV APPR VED BY: DATE: ' ' OF qq ,> a� w•ti� � �' ;?�� ail. t. AG J ti. 'fit .. i r'>>, �• ��-.. k\ <. J�• ����e '�. THOMAS McLfELLAN, P.E.JOHN Z. DEMAREST JR., P.L.S. 2" PEASTONE 3/4" - 1 1/2" WASHED STONE �- ELEV.= 25.5 F: 123.0 F-> H ELEV. 3.5' 3.5' 37' -- 4 INFILTRATOR CHAMBERS (MODEL 3050) WITH 3.5' OF STONE ALL AROUND (37'x 11.2'x 2' DEEP) (H-20) SITE AND SEWAGE PLAN L OCA TION. 48 NORTH MAIN STREET SOUTH YARMOUTH, MA rr t PREPARED FOR: HEAL ALLEN ROUNSEV I LLE SCALE: I"= 20' DATE: 3-11-03 REFERENCE: PLAN BOOK 283, PAGE 18 AND PLAN BOOK 69, PAGE 3