Loading...
HomeMy WebLinkAboutEngineered Plan - 2016*Wetland Delineation by Rick Judd of Moran Engineering Assoc., S. Harwich, MA by Soil & Plant Analysis 1D EW : 26 �� S � '•: co��0ry O. \'•: 28 6 O C>° �a 30 ¢ Svc 24 .• 32 CBDH 34 \ FNA 35 0 ' 2 35, Q EW 3 � O ;'':• 34':0 EW 0 MAP: 80 0 o : -V-PCL. 12 co \ - 3 VACANT o 4 2 EW c 7, = L L 2 L v7 i 9 � 'O r, �• O R h Z`,n HOFb/f S- RICHARD J. MAP.- 80 PCL. /4 TOWN WATER Owner to Remove Existing 6' x 10' Shed— \ N�86-21'56"W 10046��\l�ib PUMP & FILL OR REMOVE x EXISTING CESSPOOLS _ (316.E x; i x , Install 4''••. \ Clean Out x 36. to to Grade 31.9 �j' ' "Concrete p :82' x Patio irr*����, s ' Existing Dwelling TOF ® EI 38.36 P" OF elgq W CHAEL 9�y S. '� LADUc Flo. 37560 �OeESS\OSP 6 36.1 5 N PROPOSED BENCHMARK: EI. 41.1 Sre�`do� ROTH MUTLITANK Re ional Ave 4d OR EQUAL (Assumed Datum) 1500 GALLON/MODEL Top of Concrete Bound Mo��n LOCUS RMT -1500 N �y L0 PROPOSED STONE -LESS LEACHING FIELD 23.0' L X l2.0' W X 0.5' D 4 ROWS OF 3 -CUL TEC CONTACTOR /OOHD CB/DH FND R� Bass 40 41.1 ood River 1. 5' 0VEROIG TO EL. 30.9 •INSPECTION REQUIRED• Li O L 0 i u 7.0 31.0 _ �—� -_ MAP: 80 PCL. 12 TOWN WATER 32.1 _ guy 32 35.0 34 MARLIN TATA y SCALE. j 1 "= 20' 40' L. 0. 0 20 40 LOCATION MAP Map ID: 80/11 Deed DOC: 896809 L.C. Plan: 32529—C Lot 5 VARIANCE REQUEST PER 3/0 CMR /5.405 (/) (E) CONTENTS OF LOCAL UPGRADE APPROVAL TOWN OF YARMOUTH BOARD OF HEALTH SUB -SURFACE SEWAGE DISPOSAL REGULATION 3.7 DISTANCES B LOCATIONS OF DISPOSAL FACILITIES LEACHING FIELD TO WATERCOURSES... /00' REQUIRED. 82'± PROVIDED. A VARIANCE REQUEST OF 18 1. Bedrm N Bath Dining Kitchen Area cl Living Bedrm Rm 1 ST FLOOR 0 U C Garage Family Rm Basement EXISTING FLOOR LAYOUT N.TS Sh t: 1 o f2 (\%KORAN ENGINEERING ASSOC.,LLC u v 508-432-2878 941 MAIN STREET (RTE 28), HARWICH, MA SEPTIC SYSTEM DESIGN PLAN IN YARMOUTH Prepared For: Elizabeth Small 60 38 MARLIN WAY SOUTH YARMOUTH MA PROJECT: 16-162 1 SCALE: I "= 20' DATE: IO 3 16 T.O.F. Exist. I--- 10' -- h— 11' max. ACCESS MANHOLES TO WITHIN 6" OF FINISHED GRADE 14'" /..II GAS ROTH MULTITANK MODEL RMT -1500 SEPTIC TANK OR EQUAL Use Clean Medium Sand around and to top of chambers. Cultec No. 410 (4) 4" Perf. Insp Port w/ Fitter Fabr c or equal pull cap and lawn cover approved by Cultec ®� rade Required 9 g% i� I—��1 000 oe oo ooee eo oo ��0000 oe oo oo o0 J eoev000veeo oo ee eeeeooeomeee veooevoeoee oe o0 ooeo ee e00000 4 ELEV. 33.2 23.0'x 12.0'x 0.5' deep Field D -BOX 4 Rows of 3 Cultec Contactor 100HD Chambers SYSTEM PROFILE LEACHING FACILITY Not To Scale Lawn Box 4" Pull Cap Perforated Pipe Chamber ; To Btm. of Chamber Use min.: 2— 3/8" Holes 0 2" vert.spacing INSP. PORT DETAIL CULTEC CROSS SECTION NATIVE Sr" FILTER FABRI TITLE 5 APPROVED FIL INVERT TEST HOLE I El. J6.7 Depth Horizon Texture Color Other 0-70" HTM Fill —REMOVE - 70 -166" C Medium Sand 2.5Y6/3 L.S.G. ' Btm El. 22.9 GWE ® 164" (El. 23.1) Date: 9/7/16, Performed By: Rick Judd, SE, Witness: A. Von Hone, HD *Percolation rate assumed <2 min/inch in C layer *Sieve Analysis: 27.—Gravel, 409 Very Coarse to Coarse Sand 479—Medium Sand, 10.5% Fine to Very Fine Sand & 0.59 Silt/Clay **Designer to perform percolation testing at C layer 5.2' at time of system installation i ELEV. 27.3 Adj. High GW GROUNDWATER ADJ. Groundwater Found: E 1. 23.1 Index Well: MIW-29 Zone B (9/16,9.87')=> +4.2' Adj. High GW Depth= E 1. 27.3 SYSTEM DESIGN SEPTIC SYSTEM NOTES — CONTACT OFFICE (508)--432-2878 A MINIMUM OF 48 HOURS PRIOR TO START OF PROJECT. — EROSION CONTROL BARRIER IS TO BE INSTALLED, AS SHOWN, PRIOR TO THE START OF EXCAVATION. — EXISTING SEWER ELEVATION IS TO BE VERIFIED PRIOR TO THE INSTALLATION OF NEW SYSTEM COMPONENTS. — REPLACE SEWER LINE BACK TO ORIGINAL CAST IRON AS NEEDED. INSTALL 4" PVC CLEAN OUT TO GRADE BETWEEN DWELLING AND PROPOSED SEPTIC TANK. — EXISTING CESSPOOLS ARE TO BE PUMPED AND FILLED OR REMOVED ALONG WITH ALL CONTAMINATED SOILS WITHIN 5' OF PROPOSED SAS. — A 5' UNSUITABLE SOIL OVER—DIG IS REQUIRED TO MIN. EL. 30.9 (MEDIUM SAND). DESIGNER SHALL BE NOTIFIED FOR INSPECTION PRIOR TO PLACEMENT OF TITLE 5 FILL. THE PROPOSED SAS IS IN THE FOOTPRINT OF A FORMER IN—GROUND POOL AREA. — ALL COMPONENTS ARE TO MEET TITLE 5 MATERIAL &CONSTRUCTION REQUIREMENTS. — SYSTEM COMPONENTS ARE TO BE SET ON A STABLE, COMPACTED BASE. — DISTRIBUTION BOX EXIT LINES ARE TO BE SET LEVEL FOR THE FIRST 2'. — DESIGN ENGINEER IS TO VERIFY SOILS OF ALL SAS EXCAVATIONS BEFORE SYSTEM INSTALLATION. — DESIGN ENGINEER IS TO VERIFY SYSTEM INSTALLATION (LOCATIONS & ELEVATIONS) PRIOR TO BACKFILLING. — COMPONENTS ARE TO BE WITHIN 3' OF FINISH GRADE & ARE TO HAVE A MINIMUM OF 1' OF SOIL COVER. ACCESS MANHOLES ARE TO BE WITHIN (3"-6") OF FINISHED GRADE ON SEPTIC TANK INLET AND OUTLET COVERS AND DISTRIBUTION BOX COVER. LEACHING AREA INSPECTION PORTS (4) ARE TO BE SET AT GRADE WITH IRRIGATION CONTROL BOX COVERS REQUIRED. — ALL POST CONSTRUCTION LANDSCAPING DETAILS ARE TO BE BETWEEN INSTALLER AND PROPERTY OWNER OR AGENT. Design Flow: *3 bedrooms @110 gal/day = 330 gal. Septic Tank: 330 gal. x 200% 660 gal. Use: Roth Multitank 1500 Gal/Model RMT -1500 or Equal Tank Leaching Facility: 4 Rows of Cultec 10OHD Chambers (23' Long Rows) Use: 3 Cultec 10OHD Chambers per row 3 Chambers x 7.5'/chamber = 22.5' + 0.5' length adjustment = 23' Proposed Area: 4 x 23 LF of Chamber x**5sf/If = 460 sf Capacity: 460 sf x 0.74 gal/l sf = 34Q, gal. **Per Mass.DEP Certification For General Use (rev. 5/2;