HomeMy WebLinkAboutEngineered Plan - 2016GENERAL NOTE5 501L TE5T LOG5:
TEST HOLE I - 'EL= 21-9±
A.) NEITHER DRIVEWAYS NOR PARKING AREAS ARE ALLOWED OVER SEPTIC SYSTEM
UNLESS H-20 COMPONENTS ARE U5ED.
B.) THE DESIGNER WILL NOT BE RESPONSIBLE FOR THE SYSTEM AS DESIGNED UN-
LESS CONSTRUCTED AS SHOWN. ANY CHANGES SHALL BE APPROVED IN WRITING.
C.) CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION OF ALL
UNDERGROUND AND OVERHEAD UTILITIES PRIOR TO COMMENCEMENT OF WORK.
DEPTH FROM
SURFACE
(INCHES)
SOIL
HORIZON
SOIL
TEXTURE
(USDA)
SOIL
COLOR
(MUN5ELL)
501L
MOT
MOTTLING
OTHER
0=8
Cf
Fill
NA
NONE
1G.W. P 137"
8-31
B
Loimy Fine Sand
I OYR6/G
NONE
PEPC 3 1"
31-138
C
Fine Sand
IOYR7/G
NONE
RATE: <2MIN/IN
7.) DISTRIBUTION LINES FOR SOIL ABSORPTION SYSTEM (AS REQUIRED) SHALL BE
`Nater Level Range Zone: B (0-3')
4" DIAMETER SCHEDULE. 40 PVC LAID AT 0.005 FT/FT, UNE-SHALL..BE.CAPPED
Current Depth To Water Level For Index Well (8/16): 9.6'
AT END OR AS NOTED.
Longest Run
5'
Water Level Adjustment: 3.9'
Estimated Depth To High Water: 6.5 FEET, EL= 14.4
CO NSTrllU CTI ON NOTES • TEST HOLE 2: EL=20.7+
1.) ALL CONSTRUCTION SHALL CONFORM TO THE STATE ENVIRONMENTAL CODE,
TITLE 5, AND THE REQUIREMENTS OF THE LOCAL BOARD OF HEALTH.
2.) SEPTIC TANK(S), GREASE TRAP(S), DOSING CHAMBER(5) AND DISTRIBUTION
13OX(E5) SHALL BE 51T- ON A LEVEL STABLE .BASE WHICH HAS .BEEN MECHANICALLY
COMPACTED, OR ON A 6 INCH CRUSHED STONE BASE.
3.) SEPTIC TANK(5) SHALL.MEET A5TM STANDARD C 1 127-93 AND SHALL HAVE
DEPTH FROM
SURFACE
(INCHES)
501L
HORIZON
SOIL
TEXTURE
(U5DA)
501L
COLOR
(MUNSELL)
SOIL OTHER
MOTTLING
PERCOLATION RATE: LE55 THAN 2 MIN/INCH IN "C' LAYERS.
WITNESSED BY: MATTHEW T. FARRE LL, EIT, J.M. OREILLY � ASSOCIATES, INC.
0-8
E
Loamy Fine Sand ....._ ___
__ __ I 0YR5/2_.
NONE,_.-_ G.W. 123"_ .
20.20
8-36
B
Loamy Fine Sand
I OYRG/G
NONE
36-132
Cl
Fine Sand
I OYR7/G
NONE
Appropriate Index Well: MIW-29
7.) DISTRIBUTION LINES FOR SOIL ABSORPTION SYSTEM (AS REQUIRED) SHALL BE
`Nater Level Range Zone: B (0-3')
4" DIAMETER SCHEDULE. 40 PVC LAID AT 0.005 FT/FT, UNE-SHALL..BE.CAPPED
Current Depth To Water Level For Index Well (8/16): 9.6'
AT END OR AS NOTED.
Longest Run
5'
Water Level Adjustment: 3.9'
Estimated Depth To High Water: 6.5 FEET, EL= 14.4
AT LEAST THREE 20" DIAMETER MANHOLES. THE MINIMUM DEPTH FROM THE BOT-
TOM OF THE SEPTIC TANK TO THE FLOW LINE SHALL BE 48".
DATE OF TESTING: 8-18-16
4.) SCHEDULE 40 PVC INLET AND OUTLET TEES SHALL EXTEND A MINIMUM OF 6"
PERCOLATION RATE: LE55 THAN 2 MIN/INCH IN "C' LAYERS.
WITNESSED BY: MATTHEW T. FARRE LL, EIT, J.M. OREILLY � ASSOCIATES, INC.
ABOVE THE FLOW LINE OF THE SEPTIC TANK AND SHALL BE INSTALLED ON THE
AMY VON HONE, AGENT, YARMOUTH HEALTH DEPARTMENT
CENTERLINE OF THE TANK DIRECTLY UNDER THE CLEANOUT MANHOLE.
USE A LOADING RATE OF 0.74 GPD/SF FOR SIZING OF SOIL ABSORPTION SYSTEM.
5.) RAISE COVERS OF THE SEPTIC TANK AND DISTRIBUTION BOX WITH PRECAST
20.20
CONCRETE WATER TIGHT RISERS OVER INLET AND OUTLET" TEES TO WITHIN 6" OF
�
HIGH GROUNDWATER LEVEL CALCULATIONS:
FINISH GRADE, OR AS APPROVED BY THE LOCAL BOARD OF HEALTH AGENT.
6.) PIPING SHALL CONSIST OF 4' SCHEDULE 40 PVC OR EQUIVALENT. PIPE SHALL
2" DROP
Depth To Water Table (8-18-1 6): 10.4 FEET, EL= 10.5
BE LAID ON A MINIMUM CONTINUOUS GRADE OF NOT LESS THAN I %.
Appropriate Index Well: MIW-29
7.) DISTRIBUTION LINES FOR SOIL ABSORPTION SYSTEM (AS REQUIRED) SHALL BE
`Nater Level Range Zone: B (0-3')
4" DIAMETER SCHEDULE. 40 PVC LAID AT 0.005 FT/FT, UNE-SHALL..BE.CAPPED
Current Depth To Water Level For Index Well (8/16): 9.6'
AT END OR AS NOTED.
Longest Run
5'
Water Level Adjustment: 3.9'
Estimated Depth To High Water: 6.5 FEET, EL= 14.4
8.) OUTLET PIPES FROM DISTRIBUTION BOX SHALL REMAIN LEVEL FOR AT LEAST
2' BEFORE PITCHING TO SOIL ABSORPTION SYSTEM. WATER TEST DISTRIBUTION
BOX TO ASSURE EVEN DISTRIBUTION.
H-20
ZONING CLA551FICATION
9.:) DISTRIBUTION BOX 5HALL.HAVE A MINIMUM:5UMP OF 6" MEASURED BELOW
ZONE R-25 (RESIDENTIAL)
THE OUTLET INVERT.
MINIMUM AREA 25,000 S.F.
10.) BASE AGGREGATE FOR THE LEACHING FACILITY SHALL CONSIST OF 3/4" TO
MINIMUM FRONTAGE 150 FEET
1-1 /2" DOUBLE WASHED NATIVE STONE FREE OF IRON, FINES AND DUST AND SHALL ';
FRONT YARD SETBACK 30 FEET
BE. INSTALLED BELOW THE CROWN OF THE DISTRIBUTION .LINE TO THE BOTTOM OF THE
SIDE YARD SETBACK 15 FEET
SOIL ABSORPTION SYSTEM.. BASE AGGREGATE SHALL BE COVERED WITH A 2"
REAR YARD SETBACK 20 FEET
LAYER OF 1/8" TO 1/2" DOUBLE WASHED NATIVE STONE FREE OF IRON, FINES AND DUST.
_MAXIMUM BUILDING HEIGHT 35 FEET"
1 1.) VENT 501L ABSORPTION SYSTEM WHEN DISTRIBUTION LINES EXCEED 50 FEET;
MAXIMUM BUILDING COVERAGE 25%
WHEN LOCATED EITHER W WHOLE OR IN PART UNDER DRIVEWAYS, PARKING AREAS,
*BUILDING HEIGHT MEASURED STREET
TURNING AREAS OR OTHER IMPERVIOUS MATERIAL; OR WHEN PRESSURE DOSED.
51DE Of FOUNDATION SEE TABLE 203.4.2,
12.) SOIL ABSORPTION SYSTEM SHALL BE COVERED WITH A MINIMUM OF 9" OF
YARMOUTH ZONING BY-LAW
CLEAN MEDIUM SAND (EXCLUDINGTOP501Q.
13.) FINISH GRADE SHALL BE A MAXIMUM OF 36" OVER THE TOP OF ALL SYSTEM
PROPOSED BUILDING COVERAGE
COMPONENTS, INCLUDING THE SEPTIC TANK, DISTRIBUTION BOX, DOSING CHAMBER
PROPOSED DWELLING 1,412 5P -_t
AND SOIL ABSORPTION. SYSTEM.. SEPTIC TANKS SHALL HAVE A MINIMUM COVER.
OF 911.
SHED
14.) FROM THE DATE OF INSTALLATION OF THE SOIL ABSORPTION SYSTEM UNTIL
RECEIPT OF A CERTIFICATE OF COMPLIANCE, THE PERIMETER OF THE SOIL AB5ORP-
TOTAL 1,509 SF -.t
TION SYSTEM SHALL BE STAKED AND FLAGGED TO PREVENT THE USE OF SUCH
AREA FOR ALL ACTIVITIE5 THAT MIGHT. DAMAGE THE SYSTEM.,
Buildmq Area. 1,509
( 100)= 100)= 16. I %
15.) THE BOARD OF HEALTH SHALL REQUIRE INSPECTION Of AH CONSTRUCTION
Lot Arco 9,3601
BY AN AGENT OF THE BOARD OF HEALTH (OR THE DESIGNER 1F THI5 SYSTEM RE-
QUIRES A VARIANCE) AND MAY REQUIRE SUCH PERSON TO CERTIFY IN WRITING
THAT ALL WORK HAS BEEN COMPLETED IN ACCORDANCE WITH THE TERMS OF THE
PERMIT AND APPROVED PLAN5. ' 46 HOURS ADVANCE NOTICE IS REQUESTED.
16:) INSTALL A 40 and HDPE LINER FROM EL 20.7 TO EL 18.7 AS SHOWN ON PLAN.
17.) 501L REMOVAL: ALL A AND B LAYERS SHALL BE REMOVED FOR DISTANCE OF
OF 5' FROM THE SOIL ABSORPTION 5Y5TEM DOWN TO THE CLEAN SAND EL 17.7±.
AREA TO BE BACKFILLED WITH CLEAN SAND AND COMPACTED TO MINIMIZE
SETTLING.
FLOW PRO FI LE:
NOT TO SCALE
TOP OF FOUNDATION
,7771 EL=25.00
24" DIAMETER CONCRETE COVERS
RAISED TO WITHIN 6" OF FINISH
GRADE (OR AS NOTED)
(SEE NOTE #5)
Proposed EL= 23.20 %
THREE (3) COVERS TOTAL
TWO SEPTIC TANK AND I D
40.(5;`
SYSTEM DESIGN CALCULATIONS:
O
SEWAGE DESIGN FLOW: Or`
2 BEDROOM DWELLING @ I 10 GPD = 220 GPD Ole
LEACHING CAPACITY REQUIRED:
3 BEDROOMS (MAX.) @ 110 GPD = 330 GPD REQUIRED �0\O
SEPTIC TANK CAPACITY REQUIRED:P
DAILY FLOW = 330 GPD @ 200% = 660 GAL. REQUIRED
SEPTIC TANK CAPACITY PROVIDED: �O�Oxi
150 CALLON SEPTIC TANK (MIN. ALLOWED)
LEACHING CAPACITY PROVIDED: O
ONE (1) 40.0'X 12.0- X 8" LEACHING FIELD CAN LEACH:
Vt= [(40.0'X 12.0)] 0.74 GPD/SF=355.2 GPD
355 GPD>330 GPD REQUIRED
NOTE: A GARBAGE DISPOSAL 15 NOT PERMITTED WITH THI5 DESIGN
INSTALL:
ONE ( i ) - 1500 GALLON SEPTIC TANK
Yarmouth,
MA
°a Big Sandy
Pond
LO SUS CIO
o
ONE (1) -3 OUTLET DISTRIBUTION BOX (h-20 Rated)
ONE (1) - 40.0'X 12.0'X 8" NATIVE STONE LEACH FIELD NOT TO SCALE
Existing Parking Area
TO BE REMOVED
PROP05ED 40 MIL HDPE PLAN BOOK I '10 PAGE 5
LINER SEE NOTE 16 " `o m DEED BOOK 13073 PAGE. 187
A! ASSESSORS' MAP 47 PARCEL 2G
N0 xh
19.7
�� a LEGEND
32 EXISTING CONTOUR
Existing Sewage System , '9 -32 PROPOSED CONTOUR
.(Per Health Records) 6 22 21'2 9.s ` q� C x 12.34 EXISTING SPOT GRADE
TO BE REMOVED �k 2 j �/ �9 @ 14 y7 24x5 PROPOSED SPOT GRADE
�! o',o "'tom O - w WATER SERVICE LINE
-o- OVERHEAD UTILITY SERVICE
-U- UNDERGROUND UTILITY SERVICE
x. -G- GAS SERVICE LINE
X 1P TEST HOLE/ BORING LOCATION
s,6 ® 5T SEPTIC TANK
18.4 DB DISTRIBUTION BOX
SAS SOIL ABSORPTION SYSTEM
�k 6.7 j x i,3. / Reserve RESERVED FOR FUTURE
2 22. // j
/ � UTILITY' POLE
2O�Xi
BOX 4" PVC
INSPECTION PORT
i
16, #5, REBAR
m FUTURE LOCATION
EL=22.5± J r -Proposed EL= 22.2 (21.4 MINIMUM)
9" Mm - 36:' Max
19.2 1s.2
4��i� `'��, ,v ® CATCH BASIN
OeOO ��\\\� " O �v Ta a FIRE HYDRANT
�-
Q ` i`y °. ' NO h/N� O WELL
DRAINAGE MANHOLE
m hARG� o BqS/N CONCRETE BOUND, FOUND
S7� 20.7
27.8 B/
]Oyu O+� ���- ✓ co X
2 Sc S O 1 18.6 -x-x- LIMIT OF WORK.
/ x 26. cF,. �j F �v FENCE
20.5 18.9.., EDGE OF CLEARING
2 x 27.���
�cL.9
:........' : 21.1
�.... O
LOT �2 O
c46, rea=9,36 SF+
pQ 2.s
rl:• 4
i
5A5 FLAN VIEW
SCALE: I" = 10'
f 23.9
1
\�k
�Q1
t�sa�� Yhf'kL'9cuth Hedth Deg lrtment
p V E
Date
BENCHMARK:
Top of PK Nail,'EL=23.6±
(1988 NAVD Datum)
0
2 LAYER OF 1,8" - 1/2" STONE
3/4' -
1- 112" STONE
' 20.00 PLAN
i 9.50
SCALE 1"= 20'
INSPECTION NOTE: THIS AREA IS SERVED
5. I'+ PRIOR TO FINAL INSPECTION BY THE ENGINEER, SYSTEM BY TOWN WATER.
NEEDS TO BE COMPLETE.INCLUDING, BUILDUP FOR. COVERS.
- EL= 14.4. HIGH GROUNDWATER 0 ZO L� Q 60
LEACHING FIELD
-1- �- EL= 10.5.OBSERVED GROUNDWATER 8/ 18/ 16
40.0' x 12.0' x 8" _ SCALE I "=20'
G:\AAjobs\Reei\Munce)A8223SDS: dwg
ExlstlncJ 1000 Gallon Septic Tank
TO BE REMOVED
Exr5t+ng 2 Bedroom DWelling
TO BE REMOVED
-PROPOSED .GAS SERVICE
-PROPOSED WATER SERVICE RECEIVED
SCEP 0 7 r'rl i a
•PROPOSEQ GRAVEL DRIVEWAY
P \\A OF blgss .1 HEALTH DEPT.
�F -STC OF M
JOHN M. *
z O'REIL.LY JOHN
CIVIL
M. fil
¢ NO. 36206 UREILLY
t4.O. 46733 ��
Muncey Re,50ence
clo Jim Hagerty, Reef, Cape Cods Home Budder, PO Box 186, West Dennis, MA 02670
51TE AND SEWAGE DISPOSAL 5Y5TEM DESIGN
83 CoTfAGE Yarmouth, MA
J.M. OTEILLY & ASSOCIATES, INC.
Professional Engineering & Land Surveying Services
1573 Main Street Route 6A
P.O. Bog 1773
(508)896-6601 Office- Brewster, MA 02631 (508)896-6602 Fag.
DATE: SCALE: BY: CHECK: JOB NUMBER:
9/G/I G A5 Noted MTF JMO JMO-8223
10"
14"
21.00
20.20
3"
4'O"
�
20.40
20.25
19.50
2" DROP
GAS BAFFLE
-38
Longest Run
5'
1500 GALLON
DB -3
SEPTIC TANK
D -BOX
H-20
9" Mm - 36:' Max
19.2 1s.2
4��i� `'��, ,v ® CATCH BASIN
OeOO ��\\\� " O �v Ta a FIRE HYDRANT
�-
Q ` i`y °. ' NO h/N� O WELL
DRAINAGE MANHOLE
m hARG� o BqS/N CONCRETE BOUND, FOUND
S7� 20.7
27.8 B/
]Oyu O+� ���- ✓ co X
2 Sc S O 1 18.6 -x-x- LIMIT OF WORK.
/ x 26. cF,. �j F �v FENCE
20.5 18.9.., EDGE OF CLEARING
2 x 27.���
�cL.9
:........' : 21.1
�.... O
LOT �2 O
c46, rea=9,36 SF+
pQ 2.s
rl:• 4
i
5A5 FLAN VIEW
SCALE: I" = 10'
f 23.9
1
\�k
�Q1
t�sa�� Yhf'kL'9cuth Hedth Deg lrtment
p V E
Date
BENCHMARK:
Top of PK Nail,'EL=23.6±
(1988 NAVD Datum)
0
2 LAYER OF 1,8" - 1/2" STONE
3/4' -
1- 112" STONE
' 20.00 PLAN
i 9.50
SCALE 1"= 20'
INSPECTION NOTE: THIS AREA IS SERVED
5. I'+ PRIOR TO FINAL INSPECTION BY THE ENGINEER, SYSTEM BY TOWN WATER.
NEEDS TO BE COMPLETE.INCLUDING, BUILDUP FOR. COVERS.
- EL= 14.4. HIGH GROUNDWATER 0 ZO L� Q 60
LEACHING FIELD
-1- �- EL= 10.5.OBSERVED GROUNDWATER 8/ 18/ 16
40.0' x 12.0' x 8" _ SCALE I "=20'
G:\AAjobs\Reei\Munce)A8223SDS: dwg
ExlstlncJ 1000 Gallon Septic Tank
TO BE REMOVED
Exr5t+ng 2 Bedroom DWelling
TO BE REMOVED
-PROPOSED .GAS SERVICE
-PROPOSED WATER SERVICE RECEIVED
SCEP 0 7 r'rl i a
•PROPOSEQ GRAVEL DRIVEWAY
P \\A OF blgss .1 HEALTH DEPT.
�F -STC OF M
JOHN M. *
z O'REIL.LY JOHN
CIVIL
M. fil
¢ NO. 36206 UREILLY
t4.O. 46733 ��
Muncey Re,50ence
clo Jim Hagerty, Reef, Cape Cods Home Budder, PO Box 186, West Dennis, MA 02670
51TE AND SEWAGE DISPOSAL 5Y5TEM DESIGN
83 CoTfAGE Yarmouth, MA
J.M. OTEILLY & ASSOCIATES, INC.
Professional Engineering & Land Surveying Services
1573 Main Street Route 6A
P.O. Bog 1773
(508)896-6601 Office- Brewster, MA 02631 (508)896-6602 Fag.
DATE: SCALE: BY: CHECK: JOB NUMBER:
9/G/I G A5 Noted MTF JMO JMO-8223