Loading...
HomeMy WebLinkAboutEngineered Plans - 2017ZI 0 N -P rn Un tQ (A OD 0 0 \ 51.2 \ \ o \ /49.9 \\ADO \\ / / / / ✓ / i i5 �6 50.8 / / LOT 21 E PLAN BOOK 649 F4-91 PAGE 55 49.4 . ............... EI:••..42.5 .. •.. —pas 47 j l/� d'•••.. ........... 41 ...... 48 •.., �0 1 47 0, 49:0 ZiC\ 4 ... 46:9 Electric ......................�° EX;stin9 Box •................ Fence Fen "Ouse ®ES 51.35 46 .......... TOF 45.9 •..... \G 48.8 `\car/c...... BH 45 •.... 49.0 ..\Se Wood 47.9•.. Install..... Clean Deck 44 ........... " •..... 45.5 ..........� t. 47 43 ....................� ......BENOR-MARK •'`�#�C....... ............... TI CD on•.. Su rvey 42 ............... EI:••..42.5 47 j l/� d'•••.. ........... 41 ...... 4 41�§ •........ n 45 ........ Cesspool'X, 4 ... ....... 4� i, •....5'Overdig 'A� . 3 38:7 ................. `r ..................... 35...•38. �C. O ♦ TH�i F3-8-1Holly `\ J \` IN Cesspool 4-1 ��`�' o UC 39.2 TI CD m 40 35,8 :. 38.7 39 38 37 36.8 49.0 u7 LO rn d - u7 BENCH MARK on TOF EI. 51.35 ........... 48 47 ..•• 46 45.0 \' 44.9 0 n 45 Abandoned Water Utility \ \U) . N 5'54 E 55.00 LOCATION MAP Assessors Map 913 \ Parcel 12. 1.6 Deed: Bk.2942, Pg. 183 14 Plan: Bk.649, Pg.55 0 Lot 21E 00 Woodside Cemetery LOCUS (n r Pond 0 q / J Dennis 01 Ln '– — Pond w 0 �O RTy °'- SIA1, m \ q�so % . 0, �qN o°o 10, rya 115.00' S g0' 35' 34,> W 0 c 44 \ m ' Elec,Coble,Phone \\\ 43.4 Utility Cluster 4�ysHOFibgss�iHOFMq�,s9 DANIEL y� �� MICHAEL cy P. S- .14 _ 43 o CROTEAU J , j c�i,�U %J G U No. 46253 o No. 37560� PFGISTS s s %OSP fl ail co Yarmouth Health Department PP'VED �- Name Date SCALE 1 "= 30 0 - 30 60 90 Sh t: I o f2 LOT 29E Fc N LOT 21 C 55.00' LOT 21 E n LOT 22c W 115 -OU ^�h LOT 23 OVERVIEW OF FULL LOT 1 SCALE 1 "= 150' Stable Ln MORAN ENGINEERING ASSOC LLC 508-432-2878 941 MAIN STREET (RTE 28), HARWICH, MA SEPTIC SYSTEM DESIGN PLAN IN YARMOUTH Prepared For: Sandy Side Corporation 55 NORTH SANDYSIDE LANE YARMOUTH PORT MA PROJECT: 16-265 1 SCALE: 1 "=,30'1 DATE: 3/15/17 JV - T. 0. F. .. T.O.F. 40'f 20' 22' max ELEV. 51.35 Covers Within 6" of Grade Covers Within 6" ELEV. 1_0/ � / of Grade hk A A ELEV. 47.0 Vi 0" - 14" 1500 GAL. SEPTIC TANK GAS 1 SYSTEM PROFILE Not to Scale TEST HOLE I El. 41.5 *MAINTAIN 3' MAX. COVER BETWEEN TOP OF SAS AND FINISH GRADE 3' MAX. COVER filter fabric or 1/8" to 1/2" double washed 3/4 " to 1 2 double washed stone l------0000�r------0000l ----ELEV. 37.0 4'ends 4-500 Gal ,Chambers 4'ends "4'sides 34 4'sides- 6 5' Elev. Depth Horizon Texture Color Bath Bedrm 0-10" A Loomy Sand 10YR3 2 40.7 10-42" B Loamy Medium 10YR4/6 Very Friable 38.5 Sand 38.0 Loose 42-132" C Medium Sand 2.5Y6/4 30% gravel and stones at 48'-54" Btm El. 30.5 No Groundwater Encountered *Fill to 48" & B—Layer to 80" at West Face of Hole. TEST HOLE 2 El. 41.5 Elev. Depth Horizon Texture Color Bath Bedrm 0-10" A Loamy Sand 10YR3 2 40.7 10-36" B Loamy Medium 10YR4/6 Very Friable 38.5 Sand 36-132 C Medium Sand I 2.5Y6/4 Loose Btm El. 30.5 No Groundwater Encountered SEPTIC SYSTEM NOTES 12.8' x 42' x 2' Deep 500 Gal. Chamber & Stone B 30.5 LEACHING FACILITY Bttm.m. TH SAS CONSTRUCTION DETAIL 500 GAL. LEACHING CHAMBER 1 STONE 1 12.8'1 0 0 Ciser 0 1 I STONE— — 1-8 4' e 4 Chambers(500 Gala, 34'eie I 42' all Soil Test Date: 3/15/2017 Performed By: Daniel Croteau, PE �'iH°Fissq Witness: Amy VonHone, HA �o�'� TI DANIEL oyG� AU PERCOLATION TEST @ TH 1 �ft CIVIL � ClWIL 24 GALLONS OF WATER IN 8 MIN. 40 SEC. �5 A DEPTH OF 60 INCHES IN C LAYER ����9sT�gtiaa�' DESIGN RATE: < 2 min./in.�, SYSTEM DESIGN Design Flow: 5 bedrooms @ 110 gal/day = 550 gal. Septic Tank: 550 gal. x 200% = 1100 gal. Use 1500 Gal. Tank Leaching Facility: 12.8'x42'x2'd Chamber and Stone SAS Bottom: 12.8'x 42' x 0.74 Gal/sf= 397 Gal Sides: (12.8'+42')x2x2x0.74Ga1/sf=162 Gal TOTAL = 559 Gal Note: Garbage disposal is not permitted with this design. — CONTACT DESIGN ENGINEERING OFFICE (508)-432-2878 PRIOR TO START OF PROJECT. — EXISTING SEWER ELEVATION IS TO BE VERIFIED PRIOR TO THE INSTALLATION OF NEW SYSTEM COMPONENTS. — INSTALL 4" PVC CLEAN OUT TO GRADE BETWEEN DWELLING AND PROPOSED SEPTIC TANK AS SHOWN. — EXISTING CESSPOOLS ARE TO BE PUMPED & SAND FILLED OR REMOVED WITH CONTAMINATED SOILS IF WITHIN 5' OF PROPOSED SAS. — UNSUITABLE SOILS ARE TO BE REMOVED BELOW AND FOR 5' AROUND THE LEACHING AREA AND REPLACED WITH TITLE -5 FILL SOIL. — ALL COMPONENTS ARE TO MEET TITLE 5 MATERIALS &. CONSTRUCTION REQUIREMENTS. — SYSTEM COMPONENTS ARE TO BE SET ON A STABLE, COMPACTED BASE. — DISTRIBUTION BOX EXIT LINES ARE TO BE SET LEVEL FOR THE FIRST 2'. — DESIGN ENGINEER IS TO VERIFY SOILS OF ALL SAS EXCAVATIONS BEFORE SYSTEM INSTALLATION. — DESIGN ENGINEER IS TO VERIFY SYSTEM INSTALLATION (LOCATIONS & ELEVATIONS) PRIOR TO BACKFILLING. — COMPONENTS ARE TO BE WITHIN 3' OF FINISH GRADE. ACCESS COVERS ARE TO BE WITHIN 6" OF FINISHED GRADE. Sh t: 20 f2 2nd FLOOR Kitchen Bedrm Bath Living Rm Bedrm 1 ST FLOOR cl 0C Bath Bedrm o Z. Bedrm gin' 2nd FLOOR Kitchen Bedrm Bath Living Rm Bedrm 1 ST FLOOR Basement 4' 4.8' t4' EXISTING FLOOR LAYOUT cliLaun 0C o Z. gin' UBedrm Q Basement 4' 4.8' t4' EXISTING FLOOR LAYOUT