Loading...
HomeMy WebLinkAboutApp-Permit-ComplianceNo. ® 1 )�/ FEE r Boa 1�JTE 28 MA �(� APPLICATION FOP DISPOSAL SYSTLM CONSTRUCTION PERMIT .Application for a Permit to Construct( ) Repair (✓UUpgrade( ) Abandon( ) - ❑ Complete System ❑ Individual Components Location s- 1V0yW' aeP a6p Owner's Name @ y Map/Parcel# 9 e) r Address Ilt# Telephone# Installer's Name n e Designer's Name Address Address Telephone# •y ,o f —7 7 S` 3 Telephone# Type of Building Dwelling - No. of Bedrooms Other - Type of Building Other Fixtures No. of persons Lot Size sq. ft. _ Garbage grinder( ) Showers ( ), Cafeteria ( ) Design Flow (min. required) gpd Calculated design flow Design flow provided gpd Plan: Date Number of sheets Revision Date Title Description of Soil(s) _ Soil Evaluator Form No. DESCRIPTION OF REPAIRS OR ALTERATIONS Name of Soil Evaluator a Date of Evaluation The undersigned agrees to install the above described Individual Sewage Disposal System in accordance with the provisions of TITLE 5 and further agre t to place the system in ratiortificate of Co pliance has been issued by the Board of Health. 010, Signed `// 'Date l 0 03 Inspections •`% No. % FEE 9" c COMMONWEALTH Of MASSACHUSETTS. Board of Health, V (.12 Y' vtn t- MA. CEPITIFI -OF COMPLIANCE / it Description of Work: ❑ Individual Component(s) ❑ Complete System ` The undersigned hereby certify that the Sewage Disposal System; Constructed ( ), Repaired ( ), Upgraded ( ), Abandoned ( ) by: - /9 at ✓ i4 Y w a o _....._....._...:. ... has been installed in accordance with the pr visions of 310 CMR 15.00 (Title 5) and the approved design plans/as-built plans relating to application No. - -)-77 , dated ' Approved Design Flow (gpd) Installer 115C R -C Designer: Inspector: U°'` Date: IP) The issuance of this permit shall not be construed as a guarantee that the system willfunction as designed._ No.�! t FEE. Board of Health, _ y' ` MA. DISPOSAL SYSIN CONSTRUCTION PERMIT 0 hY Permission is hereby granted to; Construct( ) Repair( Upgrade ( ) Abandon( ) an individual sewage disposal system at S /�A i' G(iyy �� as described in he application for Disposal System Construction Permit No. 0 77 , dated Provided: Construction shall be completed within three years of the date this permit. All. loca onditions must be met. Form 1255 Rev. 5/96 A.M. Sulkin Co. Boston, MA Date ( Board of Health .