Loading...
HomeMy WebLinkAboutEngineered Plan - 2017LOCUS- �G RUNE -N STONE RD MIDSTREAM ' EL LOCATION MAP LOT 67 (15,057 SF) ASSESSORS MAP: 111 PARCEL: 37 LAND COURT CASE 32679B 33.2' 4 ................. 4'. rn cn '.'. 2' ....... 2......•. LEACH AREA DETAIL , REQUIRED VARIANCES FROM TITLE FIVE: 1. SECTION 15.221 (7): LEACH AREA TO BE MORE THAN X BELOW GRADE (VARIANCE OF 2.0'). 2. SECTION 15.211 (1): LEACH AREA TO BE LESS THAN 10' FROM PROPERTY LINE (VARIANCE OF 5'). 3. SECTION 15.211 (1): LEACH AREA TO BE LESS THAN 10' FROM GARAGE (VARIANCES OF 2'). --'100 �J t/,I Novc 98- e9,N 0OM100- SEPTIC SYSTEM DESIGN FLOW ESTIMATE: 5 BEDROOMS AT 110 GAL / DAY = 550 GAL / DAY SEPTIC TANK: 550 GAL / DAY x2 DAYS= 1100 GAL USE 1500 GALLON SEPTIC TANK LEACHING AREA: USE 4 - 500 GALLON CHAMBERS (8.5'x 4.8'x 2' EFF. DEPTH) WITH 4' OF STONE ALL AROUND AND 2' BETWEEN (33.2'x 16.5'x 2' DEEP) SIDE AREA: (33.21+ 165) x 2 x 2 = 199 SF (0.74) =j47 GAUDAY BOTTOM AREA: 33.2'x 16.5'= 548 SF (0.74) = 406 GAUDAY CAPACITY = 553 GAL/DAY �J v� Q� / 103 -103 G�` / G 102 A'42.1 p aJe�er� \ i0Nk\',� N61lb \ � 101 BENCHMARK AT RIGHT CORNER �r ~ OF A.C. PAD ELEVATION = 96.49 / Q W 100 \ a 99_ \ 16 �eq7 \ 9 82 KEY: EXISTING CONTOUR: - - - - PROPOSED CONTOUR: •------------ EXISTING SPOT ELEVATION: 25.5 PROPOSED SPOT ELEVATION: 25.5 TEST HOLE: * UTILITY POLE: -O- FENCE LINE: HYDRANT: RETAINING WALL: M16-71 97 000, oF M U 101 F SEPTIC SYSTEM SECTION TION LEV. SEWER EXIT PIPE(6" OF STON UNDER BASEMENT SLAB ECHANICA ELEVATION INTO EXISTING SEPTIC TANK = 92.6 TEE SIZES: INLET: 6" UP OUTLET: 6" COVERS WITHIN 6" OF FINISHED GRAD 1500 GAL SEPTIC TANK E UNDER OR LLY COMPACTED) 13" DOWN UP, 14" DOWN ELEV. D -BOX (6" STONE UNDER) -GAS BAFFLE AT OUTLET TEE LIVING I TEST HOLE LOGS BED BED ROOM DINING GARAGE ENGINEER: THOMAS McLELLAN, P.E. ROOM ROOM ROOM WITNESS: AMY VON HONE, R.S. DATE: 12-1-16 PERCOLATION RATE: < 2 MIN/IN BED BATH ROOM KITCHEN w/d BATH SUN ROOM 5' 2" PEASTONE OR FILTER FABRIC - 3/4" - 1 1/2" WASHED STONE INSPECTION PORT i- ELEV.= 91.5 I11' ^1'11.1 88.5 4 4 ELEV. < 33.2'x 16.5' 4 - 500 GALLON CHAMBERS WITH 4' OF STONE ALL AROUND AND 2' BETWEEN CHAMBERS (33.2'x 16.5'x )2' DEEP) (TO BE VENTED) TH-1 „< < FILL 54" 91.0 O/A HORIZON LOAMY SAND 60" 10YR 3/1 90.5 B HORIZON PERC AT 78" LOAMY SAND 74" 10YR 4/6 89.3 C HORIZON MEDIUM SAND 2.5Y 6/4 138" 84.0 NO GROUND WATER ENCOUNTERED BASS RIVER (350' TO THE EAST) SHOWS THAT GROUND WATER IS > 30' DEEP NOTES: 1. VERTICAL DATUM: ASSUMED 2. MUNICAPAL WATER IS AVAILABLE. O BED BASEMENT 3. SCHEDULE 40 -4.1 PVC PIPE TO BE USED THROUGHOUT SEPTIC SYSTEM. ss ROOM STORAGE 4. ALL PRECAST UNITS SUBJECT TO TRAFFIC LOADS TO CONFORM WITH AASHTO H-20 SPECIFICATIONS. Op d' 5. PIPE PITCH = 1/4" PER FOOT (UNLESS NOTED OTHERWISE). �4 OA 6. FIRST 2' OF PIPE OUT OF D -BOX TO BE SET LEVEL. FAMILY f BED ROOM 7. THE SEPTIC SYSTEM HAS NOT BEEN DESIGNED TO ACCOMODATE THE USE OF A GARBAGE DISPOSAL. f O ROOM FBATH 100 ..pp walk -out 8. ALL CONSTRUCTION DETAILS ARE TO BE IN CONFORMANCE WITH THE STATE OF MASS. ENVIRONMENTAL .9 CODE (TITLE FIVE) AND LOCAL HEALTH REGULATIONS. / / \ �9C� EXISTING FLOOR PLANS 9. CONTRACTOR TO VERIFY LOCATIONS OF ALL UTILITIES PRIOR TO CONSTRUCTION. f 10. GROUND COVER OVER ALL SEPTIC SYSTEM COMPONENTS NOT TO EXCEED 3' WITHOUT VARIANCE. \ /✓7.t' -`- �� �" `� 11. FIELD SURVEY PROVIDED BY TERRY A. WARNER, P.L.S., HARWICH, MA. Permit valid t OF r for RFPAIR SEPTIC SY�STIImi I \ 12. THIS PLAN REQUIRES THE REVIEW AND APPROVAL OF ONE OR MORE TOWN DEPARTMENTS AND / \ I Ql`14 Y duz. to State and 1.�eal srptic variances. IS SUBJECT TO CHANGE UNTIL SUCH TIME. B d r Ii" 1th 1 • I 13. EXISTING LEACH PIT AND SEPTIC TANK ARE TO BE PUMPED AND REMOVED. 14. D -BOX TO BE WATER TESTED TO ENSURE LEVELNESS AND EQUAL FLOW. 15. THE INTENT OF THIS DESIGN IS TO KEEP THE PROPOSED LEACH AREA BELOW THE A HORIZON AS SHOWN IN THE TEST HOLE. IF SOIL CONDITIONS VARY A PARTIAL SOIL REMOVAL AND REPLACEMENT WITH CLEAN MEDIUM SAND MAY BE REQUIRED. oar o ca review an 4 approve s require( for Any,, future ad(litions/renov.ttionslalterations to 101 __10 0 sewage facilities and/or structures/divelling. J / Varmou'th 11calt.h Deparintcnt APP OVL u / • �y� . br�c4- pa7io�� G r�7 a to Date 100 X99 36„ 6 I oak t +'L )) 98 t. 96 - i 9 \Fe�oe Lp. Civic-. _41 b No.SC471� SITE PLAN I LOCATION: I LEGEND DR., SNARMOUTH,MA PREPARED FOR: BRIAN & JILL SULLIVAN DATE: 1-9-17 SCALE: 1" = 20' BASS RIVER ENGINEERING TH ' 1VIAS J. McLEL AN, P.E. P.O. BOX 1163, EAST DENNIS, MA 02641 508-364-9048