Loading...
HomeMy WebLinkAboutApp-Permit-Compliance1� YARMOUTH HEALTH DEPT. No.jU 1146 ROUTE 28 r . SO. YARMOUTH MA 02 C®MM®N�LT14®F MAS 02 SETTS Board of Health, �Y, !' `— MA. FEE APPLICATION FOP DISPOSAL SYSTEM CONSTRUCTION PERMIT Application for a Permit to Construct( ) Repair( ) Upgrade( ) Abandon( ) - ❑ Complete System ❑ Individual Components Location c(U C V (r'� Owner's Name Map/Parcel# Z Address Q 3 e Lot# (Cl Telephone# 3 �, Installer's Name ' Designer's Name��-�3�������t�� Address • / -~ �c e Address Telephone# �C, L Telephone# Z, L__ oAq Type of Building /p�f /�� JCd� Lot Size sq. ft. Dwelling - No. of Bedrooms Garbage grinder Other - Type of Building No. of persons Showers ( ) , Cafeteria ( ) Other Fixtures Design Flow (min. required) �� gpd Calculated design flow Design flow provided -3 �` ✓ gpd N Plan: Date c, v 1 2- 'r Number of sheets l Revision Date Title Description of Soil(s) L /`G 2=Z Soil Evaluator Form No. Y- 2 6e Name of Soil Evaluator -7�-:9 Date DESCRIPTION OF REPAIRS OR ALTERATIONS The undersigned agrees to install the above described Individual Sewage Disposal System in accordance with the provisions of TITLE 5 and further agrees to not to place the6tem in operation until a Certificate of Compliance has been issued by the Board of Health. Signed _ i A a t_�� :1 ��r 6, Date s , Inspections No. ./-T FEE ty ' Board of Health, lOTi MA. CERTIFICATE Of COMPLIANCE Description of Work: ❑ Individual Component(s) IQ Complete System The undersign,eo hereby certify that the Sewage Disposal System; Constructed ), Repaired ( ), Upgraded ( ), Abandoned ( by. r L at 7 t_ IAZI has been installed in accord a ce with the rovisi ns of 10 CMR 15.00 (Title 5) and the app ved design plans/as-built plans relating to application No. Z/ ,,rd�ted// — Approved Design Flo l/. (gpd) Installer %� %k1 L•- / 1 1S1SZ_/ 6_ Designee > . (.6�1-f'— c �✓��- Inspector: Theissuance of this permit shall not be construed as a gudra No. Permission is hereby L Date•"�°_tZ t the system will function as designed. COMMONWEALTH OF MASSAC14USETTS Board of Health, DISPOSAL SYSTEM CONSTRUCTION PERMIT to; Construct(�j R�e^pa�ir( ) Upgrade( ) Abandon( ) an individual sewage disposal system. at AT Ii/ / as described in the application for Disposal System Construction Permit No. tQ2 — dated 7� �— Provided: Construction shall be completed within-4wee-7eTrrs of the date of this permit. All local conditions must be met. Form 1255 Rev. 5/96 A.M. Sulkin Co. Boston, MA Date oard of Health