Loading...
HomeMy WebLinkAboutEngineered Plan - Rev. 2017LOCUS DATA CURRENT OWNER THE BRIAN B. SULLIVAN TRUST PLAN REFERENCE LCP 21122-A DEED REFERENCE CTF. 144063 ZONING DISTRICT R-25 FLOOD ZONE AE -11 ASSESSORS MAP 26 PARCEL 48 OVERLAY DISTRICT NONE LOT AREA 8,500± S.F. SITE & SEWAGE REPAIR PLAN #J6 AFT ROAD IN S. YARMOUTH, MASS DATE: JANUARY 11, 2017 DATE: FEBRUARY 1, 2017 OWNER/APPLICANT: BRIAN B. SULLIVAN TRUST EILEEN SULLIVAN, TR. 11 OAK ST., UNIT 38 WELLESLEY, MA 02482 SHEET 1 OF 2 PREPARED BY: EAS SURVEY, INC. P.O. BOX 1729 SANDWICH, MA 02563 CELL (508) 527-3600 EAS. SU RVEY@YAH 00. COM NOTES: 1.) A TWO BEDROOM DEED RESTRICTION IS REQUIRED TO BE RECORDED AT THE BARNSTABLE REGISTRY OF DEEDS. 2.) EXISTING INVERT AT BUILDING TO BE RELOCATED TO FIT BETWEEN THE DECK / CONCRETE PROPOSED 16 PLASTIC AND SHOWER / CONCRETE CHAMBERS 16' LONG x 11.33 WIDE PROPOSED "D" BOX EXISTING TWIN 14" WHITE PINES TO REMAIN EXISTING 14" WHITE PINE REMAIN 9 p0 n o.•r TO 9.0 85 8.6 E FDA E PROPOSED 1,500 54135 GALLON SEPTIC TANK N 10' 9.1 9.3 21' 9.0 .3 C tP T Z 21' m 9.8 S o f O S OUTSIDE 6' SHOWER 9.5 OVER ---9 PUMP, CRUSH AND D.T.H. #1 CONC. 9.5 �n REMOVE BOTH 9 6 2,0' DECK X X 9.2 EXISTING CESSPOOLS OVER BENCHMARK FROM PROPERTY. CONC. S. MIDDLE OF T Z 9.7 X CONCRETE IN N m H BATH BEDROOM FRONT OF BULKHEAD. KITCHEN #2 0 ELEVATION 8.91 FAMILY 0 o O? ROOM o 9.5 BEDROOM m LIVING #1 X 10.1 ROOM 0 9.5 9. o -X 9.8 – m –� 9.3 0 `n I9.2£ LOT 44 8,500± S.F. LOT 45 I DRIVEWAY/ I 9.1 85.0 0, / 35" S 7g•41'W - - - AFT ROA VARIANCES REQUESTED: TO ALLOW THE LEACHING CHAMBERS TO BE 4' ABOVE THE ADJUSTED GROUNDWATER IN LIEU OF 5' J I I 1 I 28 N LOCUS v AFT ROAD z m SOUTH SHORE DRIVE LOCUS MAP NOT TO SCALE: ®16-0144 LOT 4J IPermit valid for 1 OF SF;1'"fIC' Sl S7 F°M ONLY - o State and Loral selrti(- variances. oard of Health, review and approval is reyuirof for YYDj"WT additionsl��.oeations/alterations to wage facili arty structo: es/ds+elling. Yartnouth Health I)cparqn+ent — APPROVF ll` ame Dat r—� I I 0 20 30 40 I GRAPHIC SCALE: I 1 INCH = 20 FEET SILL ELEV. 10.56 GASKET , GRADE ELEV. 8.8 REQUIRED Aoz/ PER PLUMBING 19'OS=0.02 rinnc ", .,,.,. 7 RAISE COVERS TO WITHIN 6" OF FINISH GRADE FINISH GRADE ELEV. 9.4 FINISH GRADE �- ELEV. 9.3 ELEV. 9.3 5' ®S= 0.01 23" OF COVER 4'®S=0.01 4" PVC SCH 40 _TOP ELEV 7. 4" PVC SCH 40 r _ _T -T --=• 22„ bUH 4U LOAMY SAND INV._ Z MIN -J MHA _ 26" ELEV = 7.4 INV.= 7.96 7.58 10"TEE 14"TEE INV.= lz[34" 7.38 RELOCATE 5'-7" GAS BAFFLE CELLAR INVERT OUT. 4'-6 1/2"4'-1" LIQUID LEVEL DRY 4 -4' , ELEV=3.9 :: ��. ELEV 3.04 vo a o 0 DATUM: 6" BASE OF CRUSHED STONE OR MECHANICALLY COMPACTED 1,500 GALLON PRECAST CONCRETE SEPTIC TANK VERTICAL DATUM: NAVD-88 BENCH MARK USED: MIDDLE OF CONCRETE IN FRONT OF BULKHEAD ELEVATION 8.91 SITE & SEWAGE REPAIR PLAN IIJ6 AFT ROAD IN S. YARMOUTH, MASS DATE: JANUARY 11, 2017 REV: FEBRUARY 1, 2017 OWNER/APPLICANT: BRIAN B. SULLIVAN TRUST EI LEEN SULLIVAN, TR. 11 OAK ST., UNIT 38 WELLESLEY, MA 02482 SHEET 2 OF 2 PREPARED BY: EAS SURVEY, INC. P.O. BOX 1729 SANDWICH, MA 02563 CELL (508) 527-3600 EAS.SURVEY@YAHOO.COM OBSERVATION PORT TO GRADE GROUND ELEVATIO 9.2 22" SYSTEM DESIGN DESIGN FLOW 2 BEDROOMS AT 110 GPB/D 2252 GPD REQUIRED SEPTIC TANK 220 x_2 _ 440 GAL. SEPTIC TANK REQUIRED = 1L500__GAL. iv SIZE OF LEACHING FACILITY REQUIRED 6" I --o DESIGN PERC RATE <2__MIN./INCH 7 H-10 X SET "QUIK-4" STANDARD LEVEL LONG TERM APPL. RATE-2--LA-GPD/S.F. INV.= INV.= 7.12 o SIZE OF LEACHING SYSTEM PROVIDED: INV.= 7.17 a �---- - 16.0' I 0 0 6.45 220 _ 0.74 SF/GPD = 298 S.F. MIN. REQ. USE (16) QUIK 4 STANDARDS to I USING 16 STONELESS UNITS CHAMBERS TOTALING 64 LINEAR FEET I ELEV. 2.4 INFILTRATOR - 16 QUIK "4" STANDARD 48"04"x12" STONELESS BED FORMATION ADJ. GROUNDWATER TPIT#1 ( FOUR ROWS OF FOUR PANELS) 4.73 SF / LF X (4 x 16) = 302.7 S.F 302.7 x 0.74 G/SF = 224 GPD CONSTRUCTION NOTES: 1. CONTRACTORS / INSTALLERS SHALL VERIFY GRADES AND ELEVATIONS AND SITE CONDITIONS PRIOR TO COMMENCING WORK ON THE SITE. 2. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH DEEDED OR ZONING REGULATIONS. OWNER / APPLICANT IS TO OBTAIN SUCH DETERMINATION FROM APPROPRIATE AUTHORITY. c 3. VEHICULAR TRAFFIC, PARKING OF VEHICLES AND PLACING MATERIALS OVER THE SEPTIC TANK IS PROHIBITED. GENERAL NOTES: 1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO D.E.P. TITLE V AND THE TOWN OF YARMOUTH RULES AND REGULATIONS FOR SUBSURFACE DISPOSAL OF SEWERAGE. 2. AT LEAST ONE ACCESS POINT OVER TANK TEES SHALL BE ACCESSIBLE WITHIN 6" OF FINISH GRADE, WITH ANY REMAINING ACCESS PORTS BROUGHT TO WITHIN 12" OF FINISH GRADE. 3. ALL COMPONENTS OF THE SANITARY SYSTEM SHALL BE CAPABLE OF WITHSTANDING H-10 LOADING UNLESS THEY ARE UNDER OR WITHIN 10' OF DRIVES OR PARKING AREAS THEY MUST WITHSTAND H-20 LOADING. 4. THE EXCAVATION CONTRACTOR SHALL VERIFY THE LOCATION OF ALL UTILITIES PRIOR TO ANY EXCAVATION. 5. ANY MASONRY UNITS USED TO BRING COVERS TO GRADE OR WITHIN 6" OF GRADE SHALL BE MORTARED IN PLACE. 6. FINISH GRADE SHALL HAVE A MINIMUM OF 0.02 FEET PER FOOT OVER THE S.A.S. AND DISTRIBUTION BOX. 7. SEPTIC TANK SANITARY TEE'S SHALL BE CONSTRUCTED OF SCHEDULE 40 PVC AND SHALL EXTEND A MINIMUM OF 6" ABOVE THE FLOW LINE AND SHALL BE ON THE CENTERLINE AND LOCATED DIRECTLY UNDER THE CLEAN OUT MANHOLES. 8. THE INLET PIPE INVERT ELEVATION SHALL BE NO LESS THAN 2 INCHES NOR MORE THAN 3 INCHES ABOVE THE INVERT ELEVATION OF THE OUTLET PIPE. 9. THE SEPTIC TANK SHALL HAVE A MINIMUM COVER OF 9 INCHES 10. THE OUTLET SANITARY TEE SHALL BE EQUIPPED WITH A GAS BAFFLE, 4 INCHES IN DIAMETER AND CONSTRUCTED OF 4" PVC 11. ALL PIPES SHALL BE SCHEDULE 40 PVC SEWER PIPE AND SHALL BE SLOPED 1/4 INCH PER FOOT MIN. EXCEPT FOR THE FIRST TWO FEET OUT OF THE DISTRIBUTION BOX WHICH SHALL BE LEVEL 12. CHANGES OR REVISIONS TO SEPTIC DESIGN REQUIRE NOTIFICATION TO EAS SURVEY INC. FOR B.O.H. AND DESIGN ENGINEERS REVIEW AND APPROVAL. 13. MAGNETIC TAPE OVER ALL COMPONENTS. 2 OBSERVATION PORT ,/ SCREW CAP TO GRADE SAND FILL �--2.83'---2.83'---- 2.83'- -- 2.83' �'-=- 11.33' END VIEW 224 GPD PROV > 220 GPD REQ. = 4 GPD RES. NO (GARBAGE DISPOSAL / GRINDER ALLOWED) GROUNDWATER ADJUSTMENT DATE OF WELL: INDEX WELL: WELL ZONE: WELL DEPTH: DEPTH OF WATER: WELL ADJUSTMENT: USING 1' OF ADJ. DEPTH OF ADJ.: DTH #1 0 11/16 MIW-29 A 9.91 9.0 2.8 1.8 (PER BOH) 86" 7.2 108" INDICATES DEEP TEST HOLE INDICATES PERC TEST NO MOTTLING NO WEEPING => 86" INDICATES ADJ. G.WATER ..* 108" INDICATES OBS.. G.WATER D.T.H. #1 i DATE: 12-7-2016 GROUND ELEV, 9.6 ADJ. G.WATER. 2.4 FILL 22„ A LOAMY SAND 10YR 4/3 26" ELEV = 7.4 B LOAMY SAND 32„ 7.5YR 5/6 1/1 lz[34" 50" C MED. SAND 1OYR 7/6 120" ELEV = (-0.4) B.O.H. AMY VON HONE, RS SOIL EVALUATOR ED. STONE, PLS BACKHOE OPERATOR. ELLIS BROTHERS (KEVIN) SOIL TYPE: _1_ PERC RATE: ! 2 MIN. PER INCH LOADING RATE: 074 GAL/SF/MIN