Loading...
HomeMy WebLinkAboutEngineered Plan - 1998I. VERTICAL DATUM: ASSUMED FROM QUAD (NGVD +/-) ENGINEER: THOMAS McLELLAN, P.E. 2, MUNICAPAL'WATER IS AVAILABLE. WITNESS. BRUCE MURPHY, R.S. 3. SCHEDULE 40 4" PVC PIPE TO BE USED THROUGHOUT SEPTIC SYSTEM. DATE:; 6-2-98 4. ALL PRECAST UNITS TO CONFORM WITH AASHTO H-10 PERCOLATION RATE: < 2 MIN/IN LOADING SPECIFICATIONS. " 5. PIPE PITCH = 1/4" PER FOOT, (UNLESS NOTED OTHERWISE). °°q RD TH-! 20.0 TH-2 6. FIRST 2' OF PIPE OUT OF D -BOX TO BE SET LEVEL. A E HoR"Z ELEV.7. THE SEPTIC SYSTEM HAS NOT BEEN DESIGNED TO ACCOMODATE THE S USE OF A GARBAGE DISPOSAL. °UTE 10" 10YR 3/3 f92 8 8. ALL CONSTRUCTION_ DETAILS ARE TO BE IN CONFORMANCE WITH THE LOAAU sANn STATE OF MASS. ENVIRONMENTAL CODE (TITLE FIVE) AND LOCAL LOCATION MAP forR s/8 z7" 17.8 HEALTH REGULATIONS. I; LOT 4 zo. s C1 HORIZON 9. CONTRACTOR TO VERIFY LOCATIONS OF ALL UTILITIES PRIOR 15,484 ± S.F. MED -FINE SAND (0.36 ± AC.) 21 84 2.5Y 7/4 13.0 TO CONSTRUCTION. C2 HORIZON 10. GROUND COVER OVER ALL SEPTIC SYSTEM COMPONENTS NOT TO MEDIUM SAA. D EXCEED 3.0'. ASSESSORS MAP: 3 / 2.5Y 7/2 11. EXISTING CESS POOLS ARE TO BE PUMPED AND FILLED WITH SAND �- � OR REMOVED. PARCEL: 144" I 8.0 FLOOD ZONE: C 21 �it� 4� NO GROUNDIrATER 'ENCOUNTERED 20.2 � + / 20 SEPTIC SYSTEM DESIGN 19.9 FLOC' ESTIMATE: BEDROOMS AT 110 GAL/DAY/BEDROOM =440 GAL/DAY - ` SEPTIC TANK: 40 GAL/DAY x 2 DAYS = 880 GAL S USE 1500 GALLON SEPTIC TANK i CP LEACHING AREA: CS AAE ! P USE 6 INFILTRATORS (MAXIMIZER CHAMBERS) 1° : t1a� Nig fs. z WITH 4 OF STONE AT ENDS AND 2 AROUND SIDES \ AT t ! (51.5 x 7' x 2 DEEP) 8 Digo o yyE��� 11� SIDE AREA: (58.5)2 x 2 - 234 SF (.74) - 173 GAL/DAY ' = •� E E i 8� �� 'BOTTOMAREA. 51.5 x 7 - 360.5 SF (.74) = 267 ..GAL/DAY g 18.2 CAPACITY = 440 GAL/DAY BENCHMARK AT �. 1 y � � CP41 �o � C . CONCRETE BOUND \ Y �, ,��p Gg C o ►. • ELEVATION = 20.5 + " 18.0 SEPTIC. SYSTEM 'SECTION / 2" PEASTONE COVERS WITHIN 12" OF ' 17.7 FINISHED GRADE " 21.0 3/4 - 1 1/2" . FIRST FLOOR 6- of FINI HED BE WITHIN WASHED.STONE i A 17.7 i a S ELEV: 17.2 17.05 V-0 - ELEV. Q 17.3 D -BOX e . 14.7 / O�� ELEV. 1500 GAL " 16.8 - H ELEV. -18 ' 17. s `�� SEPTIC TANK 16.97 (6 OF ELEV. 2'-4' 2'-4' 18.2, 18.3 & 18.4 . (6" OF STONE s UNDER OR ELEV. STONE 51.5' ELEV. MECHANICALLY COMPACTED) UNDER) 6 INFILTRATORS (MAXIMIZER CHAMBERS) (EXISTING) TEE SIZES: 16'7 WITH 4' OF STONE AT ENDS AND 2' / GAS BAFFLE h� INLET: 6" UP, 13" DOWN AT OUTLET TEE ELEV. AROUND SIDES (51.5' x 7' x 2' DEEP) f7.5 OUTLET: 6" UP, 14" DOWN I KEY: SITE AND SEWAGE PLAN EXISTING CONTOUR: ! APP OVED BY: DATE: PROPOSED CONTOUR: EXISTING SPOT ELEVATION: 25.5 .� LOCATION PROPOSED SPOT ELEV AT ION: 25 A� r 243 WOOD ROAD TEST HOLE: - • t^""^sJ. SOUTH YARMOUTH. MA. �a� UTILITY POLE: -0-� C'`�� -, rf Z. FENCE LINE: ,Pty F T ��STr,iR. N PREPARED FOR: HYDRANT: -& PATRICIA BOW EN RETAINING WALL: TREE: DEdfAREST-McLELLAN ENGINEERING SCALE: 1"= z0• DATE: 7-1-98 �� �s�� 24 SCHOOL STREET P.O. BOX 468 WEST DENNIS, MASSACHUSETTS 02670 REFERENCE: PLAN BOOK 83 PAGE 13 " DM # -9-8=07-1- (D29Ff1) THOMAS McLELLAN, P.E. JOHN Z. DEbfAREST JR., P.L S. PLAN BOOK 91 PAGE 111 PHONE FAX : (508) 398-7710 rte_ 5EP 2 3 1998 c�' C� HEALTH DEPT.