Loading...
HomeMy WebLinkAboutEngineer Certification Letter with As-Built Plan Nashob�Engineeru-�g Associates 6 Bea�rer Braok Road Littl�ton,MA OS4G0 97fi.501.30Q� johnffieldCaaol.cam 9-2-16 � � � RE:10GQ RT2�YARMOUTH McDC�NALDS REF PLaN:SDS ASBUILT PLAN 106Q YARMOUTH, PLAN 2016-Q09 To�vn c�f Yarmauth Board of Health Ta whom it rnay concern, In aerordance with 31U CMR 1�.000 anc.-i t11e town of Yarmouth Board of�Iealth Regulations,I hereby certify,to the best of my knowledge,information and belief, that the septic system shoum on the pian by Nashava Engineering entitled, "Design of Subsurface Sewage Disposal System in Yarmouth" fnr McDonalds USA,plan 2Q16-(}(}9,Iast revised 4/2J16, appxoved by the Yarmouth 13aard af He�lt11 an 5J16/16 has been sixbstantially constructed in compliance with s�id plazl and regualtions. � Accolnpanying ttlis certification lett�r, ple�se also find the as-built plan entitled "As-Built P1an af SuUstzxf�ce S�w�ge Disposal Systam in Yarmau#h" for McDonalds USA,plan 2016-009,last , revised 9-1-16. Regards, ►�"►'�• � ����1H 0�A�tq���� . vi �'�' JOHN F. �'� � �IE�{7 � ,�; o CIVIL � .' {-' N0.49241 . � �� �� �� � . ���:�,r�/ST��''��a`L�J, ; . � �nq��LtiN �.! � .��=�� � �`� john F. �zeic�, .P.E. 4 Principal Civil Engineering 6 Beaver Broak Littleton MA 0146Q i V' [w* waAxHas w a ssas D ° R uEna ox 4.wxaF t vi Rs n , ,/v sa .P u au w/V.• F[w e• ac DD D a aHp p a In. PT ra o F aaa � a awa OLE . ni Wx s' cwAeEP mAVEL Ua a a aM ew Awa P LE EL e ga « «� ... FU. 1.1=41111- sT fsm cFi m[Ax rR,v E.In sago aAl s[Pnc IAHK-4-saiw x- Cl 5¢A c,x-xoo sc wi H-za P,) eo Y sa 4 w v Mux ,� mkxrun EP Pa TIE ms 1. n.m(NVERn H.u, I.. n� ,au SEPTICSYSTEM PROFILE PUMP REQUIREMENTS -A W,TER AN[M£ ELEVATION HEAD 3.03 FT DYNAMIC LOSS 5.76 FT BEST- HEAD 1.5 FT TDTAL WORK 1228 FT USE MYEPSV3WHV D.P.'AT tB Fi PUMP SETTINGS (ELEV FROM DATUM, INCHES FROM BOTTOM OF TANK 9-1-16 LOCA310111 NCHES WI MI PUMP N W (OUCHES) PUMPRUCHES) 0.38 4 9It8 PUMP 6.64 td tM PUMPS OFF et. I95R 6L40 P6 IGt1F �EI- -A W,TER AN[M£ AMP/WL FFMIFACR 300aS WIOIH 4010100 FT 1l0p Ff X�..MM LL VA 6PKIIw FTA.K WpGI RTA.[ 6008 92 iT Ll FT 1.mFT M SLOee001B TOTALW86NCY cMSEASASCILERGaUh SL-LUOI TANK WOYAXCYItTElalrta WATERMY1ACfa1 SLMiw LL . STARTOFBEG-, Ex0 RP .E � Pu 1d " NOTES PUMP CURVE MYERS V3WHV PUMP NOTES PD LATERAL. ( IN FEET) A-100-A80012)MCASE/BALL DATE INSP. COMMENT 1. STAKE OUT COMPONENTS 1 inch = 20'7= HOUSING-POLYPROPYIFNE 2. BOTTOM OF EXCAVATION TANK AND LEACHING FAC. 5-27-16 BUSHING PVC „L T4 sw 40 Pw solm WN 5-31-16 ssP WAVE[ BALL -HDPE COLOR -GREY '"� TE E �Iflf .l l-.. �.1)llII (�)IIu:r?SL'I11�S4,TI. :.'k1F0u,d:: LLQ_.. e nR FAnc +wren 6x[P oaeLE KA9,ED sravE w +/.• urza.us RBIeacw 9-1-16 PROVIDE 3000 GAL SMALL COMPARTMENT (24 HR DETENTION) I . s..0 Pas -T , +/.' sa .o 1A E ALs W...+/.' P[nFaAn- s Fra oancR NNISH GRACE BED CROSS SECTION 1. PUMPS AND ALARM SHALL BE ACTIVATED BY MERCURY FLOAT A. BASIS 2 MIN./IN PERCOLATION RATE 2. SWITCHES AS SHOWN (3 FLOATS REQUIRED). M EFFECTIVE AREA PROVIDED 2640 S.F. P 2640 S.F. X .74 GPD/S.F.= 1953.6 GPD AND TIED TO A 3/4' SOHO 40 Pvc PIPE WITH S.S HOSE POLTLOK A10O EFFLUENT FILTER ELeaW ENCASEB 40 PVc PERF _ cwcxETOEY. CLEANOUT -DISTAL END D. TOTAL S0. FT. PROVIDED 2640 OBSERVATION PORT NO SCALE H -o -A SWITCH NO SCALE SET ON MORTARED CONCRETE BLOCK 4. 88%30X.5 LEACH BED PRESSURE DISTRIBUTION ACCESS TO GRADE RING COVER AND RUBBER GASKET 4- CLEANOUT OPEN TO BOTTOM OF STONE LESARON FOUNDRY LAOSO OR EQUAL NOT ER MTMY eE RE LOCEIEo TO A LESSCCN flNW AAREA SET ON MORTARED CONCRETE BLOCK HOT TOP 1/8" DRILL HOLE IN TOP OF 1 t/4' CLEANOUT TO THE LEACH FACLiY Au VETHI NT PPE 4 SW 10 PVC GRADED GRAVEL VARIANCES REQUIRED HOT TOP -, . . -" 1 '•'. 4• PERF SDR 35 To EXTEND FROM NO KNOWN TITLE 5 VARIANCES PROPOSED VARIANCE REQUEST OF .75' OF ADJUSTMENT 1. FO CE MAN SHALL HAW A CONTINUOUS PITCH. IF COVERED LESS THAN 24' PROVIDE 2' RIGID INSULATION. GRADE BOTTOM OF LEACH BED VENT %T DET•1I% 1 1/4' PO LATERAL VARIANCE REQUEST - SINGLE PUMP DISTRIBUTION PUMP GRADED GRAVEL WRAP PIPE IN FILTER FABRIC I Y fi �J IP FILTER FABRIC INCLUDING BOTTOM. DO N INSTALL rv0T t0 SCALE CRUSHEO STONE POLYETHYLENE, Y PER 21 - 1 1/4- PD LATERAL CAP AT BOTTOM. LEACH BED TEST PIT DATA SOIL TESTING CRUSHED ATONE WITNESSED BY : RATE <2 MPI LEACH BED 1d " NOTES PUMP CURVE MYERS V3WHV DATE TEST PERFORMED: PUMP NOTES INSPECTION SCHEDULE DESIGNER DATE INSP. COMMENT 1. STAKE OUT COMPONENTS 5-9-16 2. BOTTOM OF EXCAVATION TANK AND LEACHING FAC. 5-27-16 ILL IN PL CE 5-31-16 4. SYS7E CO PLETE 3. ALL WORK AND MATERIALS TO CONFORM WITH STATE AND LOCAL CODES. 5. PUMP TEST 6-1-16 6. FINAL FILL AND GRADE 9-1-16 DATE TEST PERFORMED: PUMP NOTES DESIGN CRITERIA GENERAL: RESTAURANT USE -(92 SEATS AT 20 GPD/SEAT) 1840 GPD 1. ALL PIPING, CONTROLS k PUMPS SHALL BE APPROVED BY THE ENGINEER. 1840 GPD. 2. THE MANUFACTURERS LITERATURE SHALL BE SECURELY FASTENED 1. PERCOLATION RATES - - - - (<2MIN./INCH) TO ABOARD ADJACENT To ALARM. 2. FLOWS: 1840 GPD. 3. ALL WORK AND MATERIALS TO CONFORM WITH STATE AND LOCAL CODES. 3. SEPTIC TANK REQUIRED. 6000 GAL 2 COMPARTMENT 4. ALL ELECTRIAL WORK AND MATERIALS SHALL BE BY ELECTRICA PERMIT EXISTING 6000 ALL LARGE COMPARTMENT (75 HR DETENTION) FILL PROVIDE 3000 GAL SMALL COMPARTMENT (24 HR DETENTION) 3-42- FILL CONTROLS: 6'-120 1. PUMPS AND ALARM SHALL BE ACTIVATED BY MERCURY FLOAT A. BASIS 2 MIN./IN PERCOLATION RATE 2. SWITCHES AS SHOWN (3 FLOATS REQUIRED). M EFFECTIVE AREA PROVIDED 2640 S.F. FLOATS AND PUMP POWER CABLE ARE TO BE SUSPENDED FROM 2640 S.F. X .74 GPD/S.F.= 1953.6 GPD AND TIED TO A 3/4' SOHO 40 Pvc PIPE WITH S.S HOSE C. TOTAL GPD PROVIDED FOR 1853 CLAMPS 3 GLOATS SHALL BE READILY ACCESSIBLE FROM HATCH. D. TOTAL S0. FT. PROVIDED 2640 a CONTROLS AND PUMP r0 BE ON A SEPARATE CIRCUIT WITH F. SOIL CLASS SAND - CLASS 1 H -o -A SWITCH G. LONG TERM APPLICATION RATE 0.74 GPD/SF 5. CONTROL PANEL TO BE LOCATED ADJECENT TO THE TANKAGE IN A NEMA TYPE ENCLOSURE WITH AN AUDIO ALARM. 4. 88%30X.5 LEACH BED PRESSURE DISTRIBUTION 6. THE ALARM IS TO BE ON A SEPARATE CIRCUIT AND A SIGN 10 RM 88 FT LONG 1 1/4" LATERALS SHOULD BE PLACED NEXT TO IT INDICATING THE SOURCE OF THE WITH 1/4" PERF 6 FT ON CENTER ALARM, lHE PUMP INFORMATION, AND THE SUPPLIER. 7. WIRING SHALL BE CONTINUOUS TO THE BUILDING WITH THE USE OF PERC TESTING A THERMOPLASTIC UNCTON BOX IN THE PUMP CHAMBER. VARIANCES REQUIRED H ls IN UDE. WIRING FOR THE PUMP AND THE FLOATS. FORCE MAIN: NO KNOWN TITLE 5 VARIANCES PROPOSED VARIANCE REQUEST OF .75' OF ADJUSTMENT 1. FO CE MAN SHALL HAW A CONTINUOUS PITCH. IF COVERED LESS THAN 24' PROVIDE 2' RIGID INSULATION. INSTEAD OF 2.4' OF ADJUSTMENT 2. FORCE MAN SHALL HAVE 6' BE00 NC IN SANG. VARIANCE REQUEST - SINGLE PUMP DISTRIBUTION PUMP 3. PIPE SHALL BE HIGH DENSm, HIGH MOLECULAR WEIGHT, 20D PSI INSTEAD OF DUAL PUMP POLYETHYLENE, Y PER 21 4. INSTALLATION SHALL BE PER MANUFACTURERS RECOMMENDATIONS APPROPRIATE FITTINGS AND TEST PIT DATA SOIL TESTING . CEMENT SHALL BE USED INSIDE FiF CHAMBER AND AT THE MANIFOLD WITNESSED BY : RATE <2 MPI BRUCE MURPHY, DIRECTOR OF HEALTH, YARMOUTH PUMP CHAMBER: LOCUS 1. THE CHAMBER SHALL BE A S -EA PRECAST REINFORCED SOIL EVALUATOR: CONCRETE 3000 GALLON SEPTIC TANK. (SHEA TK-3GDCH-20 OR EQUAL) JOHN FIELD 2. THE TOP SHALL BE MT WITH THREE 20' DIA OPENINGS. WITH DATE TEST PERFORMED: 1-14-16 DEPTH OF 66" AND REPLACED WITH CLEAN FILL IN ACCORDANCE TP -1 TP -2 ELEV=12.30 ELEV=11.57 V-4" HOT TOP 0--4' HOT TOP SHOWN ON THIS 3-66- FILL 3-42- FILL 6'-120 C S COURSE SAN. 42-60' Bw S FINE SAND BY: CONTROL PONT ASSOCIATES, INC 2,5W/6 THE DEPARTMENT OF ENVIRONMENTAL PROTECTION AND THAT 10YR5 S 352 TURNPIKE ROAD, SOUTHBOROUGH, MA 01772 " ANALYSIS 6o-110' C 2.577/6 COURSE SAND NO REFUSAL NO WEEPING NO REFUSAL WEEPING96V ESHGW @102" ELEV ESHGW - 3.79 ESHGW WV ELEV ESHGW = 4.40 PERC TESTING DATE 1/14/16 DEPTH 74" PT -2 SOAK SOAK 1216 12" 12 1231 9" 1235 CONTRACTOR TO VERIFY AND ESTABLISH ADDITIONAL 6" 1237 RATE RATE <2 MPI A 24' CAST IRON MEDIUM DUTY FRAME AND COVER TO 6' OF GRADE TO ALLOW REMOVAL OF THE PUMP. 3. THE CHAMBER SHOULD BE VENTED WA THE BUILDING PLUMBING SYSTEM . PIPING: 1. PIPING THROUGH PUMP CHAMBER WALL TO THE MANIFOLD SHALL BE CONTINUOUS WITH APPROVED JOINTS. PIPING INSIDE THE CHAMBER TO BE SCHD 80 AND EOUAL TO THE PUMP DISCHARGE. 2. LIFTING 'T' AND UNION SHALL BE READILY ACCESSIBLE FROM HATCH. 3, PIPING SHALL BE SLEEVED WHERE IT PASSES THROUGH THE CHAMBER WALL AND BE SECURED WITH RISER CLAMPS 4. DRAIN HOLE TO BE INSTALLED BEYOND THE CHECK VALVE TO ALLOW DRAIN BACK OF THE FORCE MAN DISTRIBUTION PUMP : L THE PUMP SHALL BE NON -CLOG. SUBMERSIBLE SEWAGE PUMP CAPABLE OF PASSING A 3' DIAMETER SOLID AND STRINGY MATERIAL. 2. PUMP SHALL BE MADE SPECIALLY FOR PUMPING RAW SEWAGE. 3. PUMP SHALL BE CAPABLE OF PUMPING 50 GPM AGAINST A TDH OF 20 FEET. 4. PUMP SHALL BE A MYERS 13.1 OR EQUAL. 5. SOL ABSORPTION SYSTEM SHALL BE DOSED AT A FREQUENCY OF 8 TIMES PER DAY. RECYCLE PUMP: I. THE PUMP SHALL BE NON -CLOG. SUBMERSIBLE SEWAGE PUMP CAPABLE OF PASSING A 2' DIAMETER SOLID AND STRINGY MATERIAL. 2. PUMP SHALL BE A MYERS ME45 OR EQUAL. FORCE MAIN, 2' SUR 21 3. IF EFFLUENT STRENGTH WARRANTS, RECYCLE SYSTEM SHALL BE DOSED BY A INTERMATIC OR EQUAL TIMER SWITCH UP TO 12 TIMES DAILY. HOT TOP, FILL AND B LAYER TO BE REMOVED TO A DEPTH OF 66" AND REPLACED WITH CLEAN FILL IN ACCORDANCE T� SURVEY PLAN REFERENCE: WITH 310 CMR15.255(3). UNSUITABLE SOIL TO BE REMOVED TO A DISTANCE OF 5' BEYOND THE LIMITS OF THE SAS. PROPERTY LINES AND TOPOGRAPHICAL INFORMATION DRAWING TAKEN FROM A DRAWING ENTITLED SHOWN ON THIS ' BOUNDARY ANDTOPOGRAPHIC SURVEY I CERTIFY THAT ON APRIL, 1998 1 HAVE PASSED THE EXAMINATION DATED: 1/26/16 , SCALE 1-=20' APPROVED BY BY: CONTROL PONT ASSOCIATES, INC THE DEPARTMENT OF ENVIRONMENTAL PROTECTION AND THAT THE ABOVE 352 TURNPIKE ROAD, SOUTHBOROUGH, MA 01772 " ANALYSIS SURVEYOR: GERRY L HOLDRIGHT, PUS HAS BEEN PERFORMED BY ME CONSISTENT WITH THE REQUIRED TRAINING, DEED REFERENCE BK. 6994 P. 293 ASSESSOR'S REFERENCE MAP 50 LOT 101 EXPERTISE AND EXPERIENCE DESCRIBED IN 310 CMR 15,0111 CONTRACTOR TO VERIFY AND ESTABLISH ADDITIONAL JOHN FIELD BENCHMARES ON SITE, PRIOR TO CONSTRUCTION. STREET: LEGEND LOCUS APPLICANT: ADDRESS: /C •' ^NyJ, 3g PHONE SEPTIC TANK ST PUMP CHAMBER PC 6Nmd sl 0 S ` DESIGNED BY: IF '- PROPOSED WELL ® _ -g SI g� %f CHECKED BY: JFF COMPS: - WATER SERVICE W EDGE OF PAVEMENT 4tR 3" FIELD BOOK: NEA 2DI6 100 FT. WETLAND BUFFER - � - ¢ EDGE OF VEGETATED WETLAND - - �C F j�e MAsewcMnwlh 2S PLAN REF: EXISTING CONTOUR - -120- •.IiHI/ ' d,pydln9e PROPOSED CONTOUR 122 I�r•„y. TEST PIT ® PERCOLATION TEST O oPBMwp= € /...' SEWER LINE S /.. 2 9/1/16 AS -BUILT PLAN PROPERTY 1 4/2/16 VENT. ELEVATIONS DATE I DESCRIPTION GENERAL NOTES: 1. This plan was prepared for the design of the subsurface wage tlisposal system only and is based on the subsurface exploration and percolation tests listed. 2. System was designed only to accommodate sanitary sewage as .icted with normal domestic usage, consisting of water carrying putresc ble Waste, and for the flows est mated by the design criteria 3 The system as not designed for garbage grind,,, and must be vented through the bu'Id'ng s plumbing n accordance with applicable codes. 4 Topography property Ines and building location are the result of a survey referenced below. 6 Plans show only those features that were vi..ally apparent on the date of topography and the absence of subsurface structures, unities eto.,hove not been verYetl not intended implied. lied. 7. Contractor to determine if site condition, are suitable for proposed constructan antl inform the design eng neer and owner, n writing, promptly of any plan deficiencies. unforeseen subsurface conditions. or required changes. B Alt -tion, are NOT proposed vi thin 100 feet of a bordering wetland (pond brook swamp, etc. NO portions f the project fall under the Wetland Protection Act (M.G L. C131 S40) 9 There a e no Water supply Wells within 150 FT__ of the proposed leaching s ( 150 FT of the septic tank) 10. System shall be inspected yearlyand p...... a.. reported to the Town of YARMOUTH DOH Ata 'nim , water ter usage condition of PD LEACHFIELD and pump cycles shall um me reported and recorded annually. 11 Any deviation in construction from this plan or from the design ora ntenance conditions shall be deemed to void any certifications or representations made relative to the system. TECHNICAL NOTES: 1 Building sew shall be n accordance with slate plumbing code and have a m n'mum of 4' of cover 'n landscape areas, and 1' of cover or be sleeved in areas subject to vehicular traffic- 2, raffic 2Septc tank shall be of approved design and made waterproof at the factory, prior to installation. Manholes shall extend to final grade. 3 Inlet lee shall extend a minimum of 10 inches below the flow line and the depth of the outlet tee, below the flow liho. shall conform to the following table LIQUID DEPTH DEPTH OF TEE q 4' 5' 6' 9 24' 4. Tees shall have 3" of air space obove them, extend a minsmum of 6' above the flow line and be at the centerline of the tank. 5. Septic tank shall be suitable for HS -20 loading. fi Pip, from septic tank to distribution box shall be laid true to line and grade and in accordance With manufacturers spec'ficol ons. Cover shall be 1' (minimum) f over 100 feet 7 Changes in slope or direction, other than joint deflections, shall be at a cleanout. S. Gravity piping outside (Iter stone Shall be sold, 4' schd 40 pvc and be water tight. Pping within stone shall be perforated 4' SDR 35 pvc and laid true to grade 9 Distribution box shall best on 6"c shed tone with all outlets to be at the same elevation and level far the first 2 feet. Install a solvent welded tee cul off 1' above the outlet on the 2" fo... main 10. For this project, remove all hot top fill TO C horizon AND to 5' around leach area. Replace with title 5 approved sand 11 Filter stone, if required, shall be double washed stone free from 'r n, fines, Stan, shall be laced n leaching reo on do and excavation. place St p g a y ofso 12. All natural 'I or fill interfaces shall be scarfed prior to placement of stone or chambers. 13. Install SILTSACK silt barrier at any catchbasins Within project This project will require siltation/,tormw. ter barriers as shown. 14. Fill shall be comprised of clean granular sand, free from organic matter and deleterious substances. Mixtures and layers of different classes of sail shall not be used. The fill shall not contain any moteriol larger than than 2 inches. A sieve anclysis employing procedures a outlined in 310 CMR 15.255(3) shall be performed o representative sample of the fill to dam onstrate the material meet specifications contained in 310 CMR 15.255(3). 15. Cover material shall be suitable far backfll and compaction to m 959. compaction. Place and compact in m See detail. x. 8" lifts. Provide compaction nayl is prior to finish hot top is instolled. 16 Finished Surface over leaching area shall insure runoff - 2 % min. for landscapes a 17. All disturbed urfaces shall be maintained to prevent erosion and be properly stabilized after construction 18. Any portion of the exstng septic system encountered shall be removed and disposed of in accordance with 31OCMR15.354 AS -BUILT PLAN OF SUBSURFACE SEWAGE DISPOSAL SYSTEM IN YARMOUTH, MA DESIGNED FOR McDONALD'S USA, LLC SCALE: AS NOTED JANUARY, SEPTEMBER 2016 NASHOBA ENGINEERING GROUP 6 BEAVER BROOKROAD, LITTLETON, MASS. 01460 TEL: (978)-501-3007 FILE: 1060YARMOUTH SHEET 1 OF 1 PLAN NO.: 2016-009