Loading...
HomeMy WebLinkAboutEngineered Plan - Rev. 2001�; , TOP OF FOUND. ELEV. /-A6 ,38. o 0 S 3511 q . 0 4po;t: Eppy 67114 F I --- —711't-- , \\{ I 37.3 y �I I 5/ 32.5 I I L TEST HOLE LOG DATE: FEBRUARY 23, 1999 IL EVALUATOR: D. MASON . WITNESS: C. STEIFEL PERC RATE: <2 MIN/IN 40.0 I 39.7 1 38.5 STREET ORGANIC A - SILT LOAM 10YR3/2 Bw - LOAMY SAND 10YR6/4 Cl - COARSE MEDIUM SAND 10YR5/6 C2 - MED. SAND 10YR6/6 0" 40.0 0" A - SILT LOAM 4" 39.5 10YR4/3 6" 18" Bw - LOAMY SAND 38.4 10YR5/6 191, 32" 35.7 90" 52" 1 AA" JNO WATER ENCOUNTERED I 0�, DESIGN DATA DAILY FLOW: (3) BDRMS. x 110 GPD = 330 GPD SEPTIC TANK: 330 GPD x 200% = 660 GPD v USE: 1500 GALLON PRECAST SEPTIC TANK LEACHING FACILITY: USE: (3) 500 GALLON PRECAST DRYWELLS LINED w/4' OF DOUBLE WASHED STONE I CAPACITY: I , SIDEWALL: 76 x 2 x 0.74 = 112.5 BOTTOM: 13 x 25 x 0.74 = 240.5 TOTAL: 353.0 GPD CPO NOTES: 1. ALL PIPE TO BE 4" DIA. SCH 40 PVC. 2. PIPE TO BE LAID LEVEL FOR 2' OUT OF DISTRIBUTION BOX. 3. RAISE ALL APPLICABLE MANHOLE COVERS TO WITHIN 6" OF FINISH GRADE. 4. SEPTIC SYSTEM IS NOT DESIGNED FOR THE USE OF A GARBAGE DISPOSAL. 5. SEPTIC TANK AND DISTRIBUTION BOX TO BE INSTALLED ON A 6" LAYER OF STONE. A _ TNATAT.T. (SAS }aAFFT.E TN OUTLET TEE . .1//5 2" LAYER OF 3/8" PEASTONE OVER 44"-141' DOUBLE MASHED STONE ALL AROUND 3� Sa SEPTIC SYSTEM PROFILE SITE -- SEWAGE PLAN FOR 20 EDDY ST., WEST YARMOUTH, MA LOT 7 - PLAN BOOK 139 PAGE 97 PREPARED FOR TOM POWERS DATE: MAY 9, 2001 SCALE: 1" = 30' WELLER & ASSOCIATES 1645 FALMOUTH RD. - SUITE 4C P.O. BOX 417 CENTERVILLE, MA 02632 TEL: (508)775-0735 FAX: (508)775-0754 3 f 3% 7c 3S. o0 GENERAL NOTES 1. CONTRACTOR TO BE RESPONSIBLE FOR THE LOCATION OF ALL UTILITIES, ABOVE AND UNDERGROUND, PRIOR TO ANY EXCAVATION OR CONSTRUCTION. 2. SEPTIC SYSTEM TO BE INSTALLED IN COMPLIANCE WITH 310 CMR 15. 00: TITLE V. 3. THIS PIAN IS NOT TO BE USED FOR PROPERTY LINE DETERMINATION. 4. ALL DISTURBED AREAS TO LOAMBD AND SEEDED. 5. CONTRACTOR TO PROVIDE 24 HOUR NOTICE FOR ANY REQUIRED INSPECTIONS. APPROVED BY: �� OQ Il' O O Ing �., �� � ��•' STREET ORGANIC A - SILT LOAM 10YR3/2 Bw - LOAMY SAND 10YR6/4 Cl - COARSE MEDIUM SAND 10YR5/6 C2 - MED. SAND 10YR6/6 0" 40.0 0" A - SILT LOAM 4" 39.5 10YR4/3 6" 18" Bw - LOAMY SAND 38.4 10YR5/6 191, 32" 35.7 90" 52" 1 AA" JNO WATER ENCOUNTERED I 0�, DESIGN DATA DAILY FLOW: (3) BDRMS. x 110 GPD = 330 GPD SEPTIC TANK: 330 GPD x 200% = 660 GPD v USE: 1500 GALLON PRECAST SEPTIC TANK LEACHING FACILITY: USE: (3) 500 GALLON PRECAST DRYWELLS LINED w/4' OF DOUBLE WASHED STONE I CAPACITY: I , SIDEWALL: 76 x 2 x 0.74 = 112.5 BOTTOM: 13 x 25 x 0.74 = 240.5 TOTAL: 353.0 GPD CPO NOTES: 1. ALL PIPE TO BE 4" DIA. SCH 40 PVC. 2. PIPE TO BE LAID LEVEL FOR 2' OUT OF DISTRIBUTION BOX. 3. RAISE ALL APPLICABLE MANHOLE COVERS TO WITHIN 6" OF FINISH GRADE. 4. SEPTIC SYSTEM IS NOT DESIGNED FOR THE USE OF A GARBAGE DISPOSAL. 5. SEPTIC TANK AND DISTRIBUTION BOX TO BE INSTALLED ON A 6" LAYER OF STONE. A _ TNATAT.T. (SAS }aAFFT.E TN OUTLET TEE . .1//5 2" LAYER OF 3/8" PEASTONE OVER 44"-141' DOUBLE MASHED STONE ALL AROUND 3� Sa SEPTIC SYSTEM PROFILE SITE -- SEWAGE PLAN FOR 20 EDDY ST., WEST YARMOUTH, MA LOT 7 - PLAN BOOK 139 PAGE 97 PREPARED FOR TOM POWERS DATE: MAY 9, 2001 SCALE: 1" = 30' WELLER & ASSOCIATES 1645 FALMOUTH RD. - SUITE 4C P.O. BOX 417 CENTERVILLE, MA 02632 TEL: (508)775-0735 FAX: (508)775-0754 3 f 3% 7c 3S. o0 GENERAL NOTES 1. CONTRACTOR TO BE RESPONSIBLE FOR THE LOCATION OF ALL UTILITIES, ABOVE AND UNDERGROUND, PRIOR TO ANY EXCAVATION OR CONSTRUCTION. 2. SEPTIC SYSTEM TO BE INSTALLED IN COMPLIANCE WITH 310 CMR 15. 00: TITLE V. 3. THIS PIAN IS NOT TO BE USED FOR PROPERTY LINE DETERMINATION. 4. ALL DISTURBED AREAS TO LOAMBD AND SEEDED. 5. CONTRACTOR TO PROVIDE 24 HOUR NOTICE FOR ANY REQUIRED INSPECTIONS. APPROVED BY: ��