Loading...
HomeMy WebLinkAboutEngineered Plan - 200011 127,Sp 764 74,0 -2 22`4 8 \� F. 70,0 0,5L AQRE'S-` Ek 6o.g / \ ITH #1 M#j T #2 0 co PRI DWELLING yo' ��+ 7 EL'—"',@ 11 TOP OF FOUND. `% 4 EL. 78:0 TEST HOLE LOG DATE: APRIL 20, 2000 SOIL EVALUATOR: DAVID B. MASON, CSE PERC RATE: 5 MIN. / IN. ORGANIC A =LOAMY SAND 10YRM2 11M=LOAMY SAND 10YR6/8 C=MEDIITM SAND 10YR6/6 51.5 32" ps>yc 54 132" 52,t> ORGANIC A= LOAMY SAND 10YR3/l B �r— LOAMY SAND 10YR6/8 Cl = LOAMY SAND 10YR5/6 C2 = FINE MEDIUM SAND 10YR6/6 NO WATER ENCOUNTERED DESIGN DATA o" 4" 13" 4s" —411" 108" 138" DAILY FLOW: (4) BDRMS.. x 110 GPD =440 GPD SEPTIC TANK: 440 GPD x 200% X80 GPD USE: 1500 GALLON PRECAST SEPTIC TANK LEACHING FACILITY: USE: (3) 500 GAL. PRECAST DRYWELLS w/4' OF DOUBLE WASHED STONE ALL AROUND CAPACITY: SIDEWALL: 93 x 2 x 0.74 =137.6 BOTTOM: 13 x 33.5 x 0.74 = 322.3 TOTAL: 459.9 GPD �IL-1 �, o .rl:�575_0-M� ��.o .�Y r•NE G� . J U N 1 4 2000 HEALTH U 1. ALL PIPE TO BE 4" DIA. SCII 40 PVC. 2. PIPE TO BE LAID LEVEL FOR 2' OUT OF DISTRIBUTION BON. 3. RAISE ALL APPLICABLE MANIIOLE COVERSTO WITHIN 6" OF FINISH GRADE. 4. SEPTIC SYSTEM IS NOT DESIGNED FOR THE USE OF A GARBAGE DISPOSAL. 5. SEPTIC TANK AND DISTRIBUTION BOR TO BE INSTALLED ON A 6" LAYER OF STONE. z" LAYER OF 3/8" PEASTONE OVER 6. INSTALL GAS BAFFLE IN OUTLET TEE. ST - 11/2" DOUBLE WASHEDTONE ALL AROUND r -- 'I\ <�� SEPTIC SYSTEM PROFILE SITE SEWAGE PLAN FOR 50 LONGFELLOW DR.. YARMOUTH, MA. LOT 41 - PLAN BOOK 203 PAGE 111 PREPARED FOR SEMINARA CONSTRUCTION CORP. ✓w�/4 /f� ZaaO DATE: APRIL 26, 2000 SCALE: I"= 30' :(508) LER & ASSOCIATES 1645 FALOAD - SUITE 4C CENTERVILLE, MA. 02632 TE5-0735 FAX: (508) 775-0754 j 5—civ -rc>P- s.. 7a BoT o► a Fc-. (; /. o a GENERAL NOTES 1. CONTRACTOR TO BE RESPONSIBLE FOR THE LOCATION OF ALL UTILITIES, ABOVE AND UNDERGROUND, PRIOR TO ANY EXCAVATION OR CONSTRUCTION. 2. SEPTIC SYSTEM TO BE INSTALLED IN COMPLIANCE WITH 310 CMR 15.00: TITLE V. 3. THIS PLAN IS NOT TO BE USED FOR PROPERTY LINE DETERMINATION. 4. ALL DISTURBED AREAS TO LOAMED AND SEEDED. 5. CONTRACTOR TO PROVIDE 24 HOUR NOTICE FOR ANY REQUIRED INSPECTIONS. ...... � 1N OF MAs�q O� DANIEL 1. Cy IRAMAN GN C Cl IL V — No.3 ~ /L APPROVED BY: