Loading...
HomeMy WebLinkAbout2013 May 16 - Email to BSC Re: Revisions Required� Page 1 of 1 � vonHone, Amy � From: vonHone, Amy ' Sent: Thursday, May 16, 2013 10:53 AM To: 'Kieran Healy' Subject: Jessie's Lane #8 Jessie's Lane: 1. provide high point of fronting road to determine amount of variance request 2. need inspection port on leach field 3. page 2—showing leach chambers instead of a leach field detail 4. clarify the proposed water line location to prove the minimum 10'separation from septic components to both main house and garage #12 Jessie's Lane: 1. provide high point of fronting road to determine amount of variance request 2. show waterline location 3. rooms in garage will need to be reviewed to determine potential bedroom capacity, if applicable 4. relabel "Edge of Leaching Field 16.5'x 56' "to Leaching Trench #4 Jessie's Lane: 1. provide high point of fronting road to determine amount of variance request 2. relabel"Leach Field"to Leach Trench 3. rooms in garage will need to be reviewed to determine potential bedroom capacity, if applicable t Please review and email or call with any questions. I understand that the subdivision approval is pending and that 1 actual submittal of the building permit applications will be completed at a later date. . Thanks, Amy Amy L.von Hone, R.S., C.H.O. Assistant Health Director Yarmouth Health Department 1146 Route 28 South Yarmouth, MA 02664 (0)508-398-2231 X1241 (F) 508-760-3472 avon hone@yarmouth.ma.us 5/16/2013 '