Loading...
HomeMy WebLinkAboutReview Checklist �--��"� � . � TOWN OF YARMOUTH ����� � SEWAGE PLAN REVIEW CHECKLIST ''��� � Zone of Contribution: In� Out_�Acr�g Location: A.M._��,� Lot - � �� Commercial: Residential: Street: � Village: li' Floor Plan: " #Bedrooms: Owner: Installer: � Address: Phone: ` Phone: Builder: Engineer: � Address: Phone: �7 " �` Phone: �-��/,,,��'1/�'� �� � ''`'� � , /, ��� A � S NO l.Re uired# of copies received 2.Date of soils exam and percolation test not older than 2 years 3.4-5 ft of naturall occurrin ervious material,above water ta.ble �--'�" 4.Foundation 2 ft above hi oint of road H.P.: Fnd: Var.: 5. Water line 10 ft from septic com onents V�'•� 6. Benchmark indica.ted and shown-NGVD if near wetlands 7. S tic tank minimum 10 ft from foundation, deck Var.: �--�'" 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 9.Leaching minimum 100 ft from wetlands V�'•� 10.Leaching minimum 150 ft from drinkin we1U25 ft irri ation well Var.: - 1 l.Tank/leachin minimum 10 ft from roperty line Var.: � 12. S stem meets all other setback r uirements Var.: 13.Uses adjustment for maximum hi groundwater Var.: � 14.Leaching set 4-5 ft above adj.water or bottom of test hole Var.: 15. System not in top or subsoil(A,B horizons) or 5'removal �-� 16.Pro osed contours are suitable ! 17. S stem meets slo e r uirements-min. 1/8", '/4" eferred L-�` 18. System meets breakout r uirements PVC liner: Wall: � _ ` 19. Specified tee sizes are ro er, gas baffle on outlet tee , 20. Sewa e is under 10,000 d for arcel L��' 21.No garba e dis osal `'� � 22. S stem ad uatel sized for its intended use �o ' 23.Minimum 6"stone or com acted below tank and dbox 24.Manhole covers within 6"of ade, um chamber cover to ade v`'� 25.Ins ection ort on lastic chambers/leach field 26.Electrical ermit for um chamber/S arate meter for du lexes •�A 27,pum system-2" line,wee hole,check valve,tee in dbo� ump size j 28. Septic tank/pum chamber to be factory waterproofed i 29.Vent rovided if leaching below 3 feet,under driveway/parkin , i 30.Buoyancy calculations for tank/pump chamber 31.En ` eer to ins ect and cert' soils: � wall: commerc' L• 32.En ' eer/Registered Sanitarian and Land Surveyor stam s/si ature L ' � 33.H-201oadin is subject to vehicular traffic, oundwater , � 34.Title V A lication and ermit fee, insta.11er si ture �� ?� � � � �'`� 35.Foundaxion footing min. 2 feet above adjusted ground water for new house 36.Deed Restriction r uired max. #bedrooms: max. flow: d 37.Check area lots for groundwater/Label oundwater in Assessor's Ma 6/03/03 ' Plan reviewed by: i i