Loading...
HomeMy WebLinkAboutEngineered Plan - 2017Q N KEY: EXISTING CONTOUR: - — — - J� PROPOSED CONTOUR: ------------- LOCUS QO EXISTING SPOT ELEVATION: 25.5 TUCK�� RD PROPOSED SPOT ELEVATION: 25.5 SE TEST HOLE: * UTILITY POLE: -p- T. FENCE LINE: w mi HYDRANT: � Z RETAINING WALL: W LOCATION MAP LOT 7 (18,784 SF) ASSESSORS MAP: 135 PARCEL: 65 PLAN BOOK: 169, PAGE: 153 2 20" oak 106 i 106 "Z-°' 1 AD th-1 1 i��o Y dip 105 OF�'rf 104 \ \ 12" oak 103 \ S \ w 102 \ \ BENCHMARK AT \ RIGHT CORNER 102 OF BULKHEAD ELEVATION = 106.23 M17-15 SEPTIC SYSTEM DESIGN SEPTIC SYSTEM SECTION FLOW ESTIMATE: FIRST FLOOR _rnVERS WITHIN W. 3 BEDROOMS AT 110 GAL / DAY = 330 GAL / DAY SEPTIC TANK: 330 GAL / DAY x 2 DAYS = 660 GAL USE 1500 GALLON SEPTIC TANK 104.3 8, 104.4 ELEV. LEACHING AREA: USE 2 - 500 GALLON CHAMBERS (8.5'x 4.8'x 2' EFF. DEPTH) WITH 4' OF STONE ALL AROUND (25'x 12.8'x 2' DEEP) SIDE AREA: (25' + 12.8') x 2 x 2 = 151 SF (0.74) =_112 GAUDAY BOTTOM AREA: 25'x 12.8'= 320 SF (0.74) = 237 GAUDAY CAPACITY = 349 GAL/DAY BATH F BED ROOM 2nd FLOOR BED bh ROOM BATH BED ROOM (2 PIPES) TOP OF FOUNDATION DINING ROOM (KITCHEN LIVING ROOM pch I 1st FLOOR EXISTING FLOOR PLAN \100 \99 \\103 \102 101 \\ \ 105 \104 q � 1 1043 /A 1 1 / q Div, W 106196 pcti / 1 I' 102 /101 ti oQ / 103 / M / 1co 105 LP \ \ \ N1S3 ~ ~EDGE OF LAWN 66 \ \ \ 104 \103 103 102 1 100 98 ` /98 w l / 99 ELEV. 1500 GAL SEPTIC TANK 6' OF STONE UNDER OR ECHANICALLY COMPACTED) TEE SIZES: INLET: 6" UP, 13" DOWN OUTLET: 6" UP, 14" DOWN GARAGE FINISHED GRADE 3' MAX. COVER (1' MIN) 102.27/ 102.1 ELEV. D -BOX ELEV. (6" OF STONE UNDER OR MECHANICALLY COMPACTED) ELEV. -GAS BAFFLE AT OUTLET TEE 2" PEASTONE OR FILTER FABRIC - 3/4" - 1 1/2" DOUBLE WASHED STONE INSPECTION PORT ELEV.= 102.65 ltl 1 " ' 1' I ##J 99.82 4 4 ELEV. IE —25'x 12.8' 2 - 500 GALLON CHAMBERS WITH 4' OF STONE ALL AROUND (25'x 12.8'x 2' DEEP) 144"1 1 93.5 NO GROUND WATER ENCOUNTERED NOTES: 1. VERTICAL DATUM: ASSUMED 2. MUNICAPAL WATER IS AVAILABLE. 3. SCHEDULE 40 - 4" PVC PIPE TO BE USED THROUGHOUT SEPTIC SYSTEM. 4. ALL PRECAST UNITS SUBJECT TO TRAFFIC LOADS TO CONFORM WITH AASHTO H-20 SPECIFICATIONS. 5. PIPE PITCH = 1/4" PER FOOT (UNLESS NOTED OTHERWISE). 6. FIRST 2' OF PIPE OUT OF D -BOX TO BE SET LEVEL. 7. THE SEPTIC SYSTEM HAS NOT BEEN DESIGNED TO ACCOMODATE THE USE OF A GARBAGE DISPOSAL. 8. ALL CONSTRUCTION DETAILS ARE TO BE IN CONFORMANCE WITH THE STATE OF MASS. ENVIRONMENTAL CODE (TITLE FIVE) AND LOCAL HEALTH REGULATIONS. 9. CONTRACTOR TO VERIFY LOCATIONS OF ALL UTILITIES PRIOR TO CONSTRUCTION. 10. GROUND COVER OVER ALL SEPTIC SYSTEM COMPONENTS NOT TO EXCEED 3' WITHOUT VARIANCE. 11. FIELD SURVEY PROVIDED BY TERRY A. WARNER, P.L.S., HARWICH, MA. 12. THIS PLAN REQUIRES THE REVIEW AND APPROVAL OF ONE OR MORE TOWN DEPARTMENTS AND IS SUBJECT TO CHANGE UNTIL SUCH TIME. 13. EXISTING CESS POOLS AND LEACH PIT ARE TO BE PUMPED AND FILLED WITH SAND OR REMOVED. 14. D -BOX TO BE WATER TESTED TO ENSURE LEVELNESS AND EQUAL FLOW. RECEIVED Yarmouth Health Deprtme nt Arp f 'D Date r R4 CiL`Fp_ J. APR 18 2017 HEALTH DEPT. SITE PLAN LOCATION: 17 EILEEN ST., YARMOUTHPORT, MA PREPARED FOR: EDWARD ATHAYDE DATE: 4-7-17 SCALE: BASS RIVER ENGINEERING U, P.E. P.O. BOX 1163, EAST DENNIS, MA 02641 508-364-91048 TH-1 105.5 TEST HOLE LOGS ELEV. 0/A HORIZON ENGINEER: THOMAS McLELLAN, P.E. LOAMY SAND 10YR 4/1 10" 104.7 WITNESS: AMY VON HONE, R.S. B HORIZON DATE: 4-6-17 LOAMY SAND 42" 10YR 6/8 102.0 PERCOLATION RATE: < 2 MIN/IN C HORIZON MEDIUM SAND 2.5Y 7/4 PERC AT 72" 144"1 1 93.5 NO GROUND WATER ENCOUNTERED NOTES: 1. VERTICAL DATUM: ASSUMED 2. MUNICAPAL WATER IS AVAILABLE. 3. SCHEDULE 40 - 4" PVC PIPE TO BE USED THROUGHOUT SEPTIC SYSTEM. 4. ALL PRECAST UNITS SUBJECT TO TRAFFIC LOADS TO CONFORM WITH AASHTO H-20 SPECIFICATIONS. 5. PIPE PITCH = 1/4" PER FOOT (UNLESS NOTED OTHERWISE). 6. FIRST 2' OF PIPE OUT OF D -BOX TO BE SET LEVEL. 7. THE SEPTIC SYSTEM HAS NOT BEEN DESIGNED TO ACCOMODATE THE USE OF A GARBAGE DISPOSAL. 8. ALL CONSTRUCTION DETAILS ARE TO BE IN CONFORMANCE WITH THE STATE OF MASS. ENVIRONMENTAL CODE (TITLE FIVE) AND LOCAL HEALTH REGULATIONS. 9. CONTRACTOR TO VERIFY LOCATIONS OF ALL UTILITIES PRIOR TO CONSTRUCTION. 10. GROUND COVER OVER ALL SEPTIC SYSTEM COMPONENTS NOT TO EXCEED 3' WITHOUT VARIANCE. 11. FIELD SURVEY PROVIDED BY TERRY A. WARNER, P.L.S., HARWICH, MA. 12. THIS PLAN REQUIRES THE REVIEW AND APPROVAL OF ONE OR MORE TOWN DEPARTMENTS AND IS SUBJECT TO CHANGE UNTIL SUCH TIME. 13. EXISTING CESS POOLS AND LEACH PIT ARE TO BE PUMPED AND FILLED WITH SAND OR REMOVED. 14. D -BOX TO BE WATER TESTED TO ENSURE LEVELNESS AND EQUAL FLOW. RECEIVED Yarmouth Health Deprtme nt Arp f 'D Date r R4 CiL`Fp_ J. APR 18 2017 HEALTH DEPT. SITE PLAN LOCATION: 17 EILEEN ST., YARMOUTHPORT, MA PREPARED FOR: EDWARD ATHAYDE DATE: 4-7-17 SCALE: BASS RIVER ENGINEERING U, P.E. P.O. BOX 1163, EAST DENNIS, MA 02641 508-364-91048