Loading...
HomeMy WebLinkAboutEngineered Plan - 2004y_ TOP OF FOUNDATION 20 FT. MINIMUM FROM CELLAR ' 99.•� �s8•Go 10 FT. MINIA"UM 10 FT. MINIP.'UM FROM SLAB OR CRAWL SPACE CLEV. a ---- CLEAN SAND x CONCRETE COVERS � - f' 9 b SP ECTON PORT - l R > _ 99.1 -- - 4" SCHEDULE 40 PVC PIPE LOAM AND SEED MIN PITCH 1 /8" PER FT.. /8 ATO1R/2 ' / u r"MAX. A 912.00 MAX. WASHED STONE �i�N; LEGE • w i 18.50 4 CAST IRON PIPE EXISTING SPOT ELEVATION x0.0 " ` c.,^ 96.3 x0.50 (OR EQUAL) MINIMUM �A•75 1E$ih1• NOT REQUrRED x t SLAB ELEV. ------ PITCH 1 /4 PER FT. z EXISTING !CONTOUR ----00---- _ -- ' I FINAL 'SPOT ELEVATION OC.Oj m --c FINAL CONTOUR �TP / ')W LINE a 3.G0 �' 1 SOIL TEST :LOCATION. UTILITY POLE <� w ELEV. WIN. o 0 TOWN WATER=W--_-W - / ` 1 ELEV. _ `E';-. Q} BATCH BASIN �Q� /1a0- L.�'tL _ 01� \ 1 > 94.6 7 r- f I GAS LINE G ' : ELE ✓. _ _� GAS _ 6" SUMP % ELEV. >,f7 ELEV. Cs7.f�< 'ELEV. - ! p - - - CESSPOOL GP r BAFFLE [i�T�li" ELEV CLEANOUT --e!. C.O. LOT 26 95.1 LIQUID OUTLET #a B / DoT 4EF TO BE PLACED ON FIRM BASE -_ 15 1 HIGH CAPACITY/,"IF/LTnAT0RS 6 TH STONE z `41,7 .3. S.F. / FEET 14 INCHF ( ) TO BE WATER TESTED g 5 FEET FEET 14 INCHES 1500 Ll a IF MORE THAN ONE OUTLET /1/ AN 11' X 4B' X 10 " 1 ENGN fOPA�fA ON '`7 6° / �( 7 FEET. 19 INCHES (TO BE PLACED ON FIRM BASE) AY. M1ELL tJ ,4 INCHES SEPTIC TANK �t��L �a � ��is�" f i § � ZONE 8 FF. T 3/4' TO 1 1 /2" CLEAN INDEX / DOUBLE WASHED STONE SYS � ,+ :JST FREE OF FI, ! / NES & SILT ON/ `' i. :".y p� ,� gg,�.,er��Q/�� USCS PROBABLE WATER TABLE ELEV. _- ��.�R D:S0 ld L SYSTEM PROME OBSERVED WATER TABLE ( / / ) ELEV: _ NOT TO SCALE BOTTOM OF it HOLE ELEV. _ / DESIGN CALCULATIONS SOIL TESTNUMBER OF BEDROOMS 4 DATE OF SOIL TEST APRIL 12004 GARBAGE ,DISPOSAL -UNIT �NO ,c r , SOIL TEST DONE BY SWEETSF_R ENGINcEERING TOTAL ESTIMATED FLOW WITNESSED BY D. FLAHERTY ( 110 GAL./DR./DAY X fir. LFI,) _ _ GAL./DAY ry \ -• " REQUIRED SEPTIC TANK CAPACITY __� Q_ -GAL. + �� ELEV.=__90.40 ACTUAL' SIZE OF. SEI'TTC TANK 1:00 GAL. ' PERCOLATION RATE �<�2MIN./INCH AT 84 INCHES SOIL CLASSIFICATION 1 • ., - / / 89.6 ---__- ' F00 GALAr0K r / ;, - 7"�7` A U L IX OECK 4, / x 95.0/ 1 o < b / 435¢��. �0FGS�pO / BEpaN / =X 9oQY / LL\ \ SOIL DEPTH HORIZ TEXTURE COLOR MOTT. OTHER 0-6 A LOAMY SAND 10YR2/1 10YR2/1 ROOTS 6-14 8 LOAMY SAND 10YR64/3 ROOTS 14-45 Cl LOAMY SAND 10YR5/8 OYR4/3 5% COBBLES 45-120 C2 FINE SAND 2.5Y6/4 10YR5/8 5% COBBLES 40-65 C2 FINE SAND 2.5Y6/4 DESIGN PERCOLATION RA 7 MIN./IN. EFFLUENT LOADING RATE_Qj GAL./DAY/S.F. LEACHING AREA_ SQ. FT. (11 X4�8)+(51IX2X10/12) LEACHING' CAPACITY (AREA X RATE) A GAL./DAY 625.32 X 0.74 RESERVE LEACHING CAPACITY ',_ GAL./DAY NOTES: 1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM :TO D:E,P. TITLE 5 AND THE TOWN'S RULES AND REGULATIONS FOR: THE SUBSURFACE DISPOSAL OF SEWAGE. 2. ALL COVERS TO SANITARY UNITS SHALL BE BROUGHT TO WITHIN 6 OF F11";SHED GRADE. 3, ALL COMPONENTS OF THE SANITARY SYSTEMA SHALL BE CAPABLE OF WITHSTANDING H-10 LOADING UNLESS THEY ARE UNDER OR VVI THIN _ .�._J"T_:L'.F-L1D�w_r,7-A nn g+1S?1L•.ir�.. �i�cn C� t; nn r-nnnsr r ET l c e=• ._i-Cti�_ __.. __._ _d �_ -' p T / T$ - ... _ .., :AREAS. ' cb� �� �� / i / / NO ,'WATER ENCOUNTERED AT __J2Q"_ ELEV. _ --M-40 4. ANY MASONRY UNITS USED TO BRING CO`%,ERS TO GRADE SHALL EE MORTARED IN PLACE. / / j_s . _91.905. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH o7•s � i am HOLE 2 ELEV.- l`% DEEDED OR ZONING REGULATIONS. OWNER / APPLICANTISTO 9� PERCOLATION RATE - <?__ MIN./INCH IN C4 HORIZON / �/ OBTAIN SUCH DETERMINATION FROM APPROPRIATE AUTHORITY. DIO J SOIL / \ - / / / w / TEST 2 94.8 \ \ z r rn of i to / DEPTH HORIZ TEXTURE COLOR MOIi. OTHER 0-8 A LOAMY SAND 10YR2/1 ROOTS 8-24 8 LOAMY SAND OYR4/3 ROOTS 24-40 Cl LOAMY SAND 10YR5/8 5% COBBLES 40-65 C2 FINE SAND 2.5Y6/4 65-84 C3 SANDY LOAM , 2.5Y5/3 84-132 C4 COARSE SAND 2.5Y6/4 6. UTILITIES SHOGUN ARE APPROXIMATE ONLY. EXCAVATION CONTRACTOR IS TO CALL "DIG -SAFE AT 1--888-344-7233 AT LEAST 72 HOURS PRIOR TO COMMENCING WORK ON SITE. 7. CONTRACTOR IS TO VERIFY GRADES AND ;ELEVATIONS AS WELL .AS SITE CONDITIONS PRIOR TO COMMENCING WORK ON SITE. ANY VARIATION IS TO BE BROUGHT TO THE ATTENTION OF THE DESIGN ENGINEER IMMEDIATELY. 8. PARCEL IS IN FLOOD ZONE C____. 9. LOT IS SH0WN ON ASSESSORS MAP ---134 --- AS PARCEL __'47_1 10. ALL UNSUITABLE MATERIAL SHALL BE REMOVED FROM UNDER AND FOR A MINIMUM OF 5' AROUND SOIL ABSORPTION SYSTEM AND BE REPLACED WITH SAND AS SPECIFIED IN 310 CMR 15.255:(3). 11. A NEGATIVE GRADE OF 3/4" PER FOOT AWAY FROM THE FOUNDATION rr SHALL BE MAINTAINED FOR -A MINIMUM OF 15'. - I 12. A VARIANCE OF 6.8' IS REQUIRED FOR THE TOP OF FOUNDATION TO BE LESS THAN 2' • ABOVE THE HIGH POINT IN ROAD. NO WATER ENCOUNTERED AT 132__ ELEV. - ii ` x95.5 /'� // x9 3 / i P. 1 .:6 ., " � / / x 103.4 ' • 4 / - _ ., " ^ it - ``�'�'. 102.8 If 1 ti i 4 i 5 --� . i^ 109 , / r: :: x - �,: � - / 102:2 •� I *��...'., rk�w r .�� cATi�Y B SGY r I - r6w ,'01.40' ! / v >! �. ASSU44£A / ,! y- :�✓ R u P A D OF HEALTH SES Si"711C lu"'ElSIGN, FOR X11 V °l I �� 'IM UST LOC. t - "v :�� Safi=.w r� �si 7T7,7,2�1+� 235 GREAT WESTERN ROAD 508- P. 0. BOX 713 398--3922 SOUTH DENNIS, MASS., 02660 DATE SCALE ". ' Y 2- 4 1 4 �u� 2, goo REVISED JOB iiO.-5747-00 :. '