HomeMy WebLinkAboutGold Star Nursery - Phase II Site AssessmentU.�
O
^� h
D�
LU O
a/ 17.72'
PROFE55IONAL OFFICE BUILDING
SUMMER
IG1.91'
329.87
PLAN
Scale 1 "=60'
/
/ VACANT
77-7 „., STREET
So
3 ENTERPRISE ROAD
[INDUSTRIAL]
9 ENTERPRISE ROAD
[INDUSTRIAL]
(6)15 ENTERPRISE ROAD
[INDUSTRIAL.]
N
CD
0)
19 ENTERPRISE ROAD
1INDUSTRIgL]
23 ENTERPRISE ROAD
!INDUSTRIAL)
Yarmouth
MA
LOCUS
u. Interchange 7m
ROUTE C
aMID_CAPE t1iGNWAY
KEY MAP
LEGEND
TP Test Pit
H13 Hand Boring
— w— . Water Service Line
— I — Top of Terrace
Abandoned Auto Parts
(REMOVED)
Exi5tmg Budding
DETAIL
Scale 1"=20'
— AREA OF SOIL
REMOVAL 03/31/05
LIMITED REMOVAL
ACTION
5'X G' X 3'(D)
[4 CY-]
Project: Mr. Arthur Gaklis
2553 Vista Del Prado Boulevard, Wellington, FL 33414
Title:PHASE II ENVIRONMENTAL SITE ASSESSMENT
LIMITED REMOVAL ACTION COMPLETION
N/F Gold Star Nursery, 264 Willow Street, Yarmouth, MA
BENNETT & 01REILLY, INC.
ENGINEERING, ENVIRONMENTAL, & SURVEYING SERVICES
1573 MAIN STREET, P.O. BOX 1667
BREWSTER, MA 02361
PHONE: (508) 896-6630 FAX: (508) 8964687
DATE SCALE BY CHECK I JOB NUMBER
DRAWING:C:\... \2005\Gaki542G9\dwg\42G9ESA.dwg 04/19/05 1" = 60' 1 KMR/e DCB B005-4269