Loading...
HomeMy WebLinkAboutEngineered Plan - 2017TASMANIA DR BED KEY: N 4 LOCUS CRAB co co til � 2 Z T EXISTING CONTOUR: - - - - PROPOSED CONTOUR: •------------ EXISTING SPOT ELEVATION: 25.5 PROPOSED SPOT ELEVATION: 25.5 TEST HOLE: UTILITY POLE: -o- FENCE LINE: HYDRANT: RETAINING WALL: LOCATION MAP LOT 20 (10,845 SF) ASSESSORS MAP: 136 PARCEL:10 PLAN BOOK: 228, PAGE: 3 33.5' ago LEACH AREA DETAIL N 1 1 1 1 1 1 1 1 SEPTIC SYSTEM DESIGN FLOW ESTIMATE: 3 BEDROOMS AT 110 GAL / DAY = 330 GAL / DAY SEPTIC TANK: 330 GAL / DAY x 2_ DAYS = 660 GAL USE 1500 GALLON SEPTIC TANK LEACHING AREA: USE 3 - 500 GALLON CHAMBERS (8.5'x 4.8'x 2' EFF. DEPTH) WITH 2' OF STONE AROUND SIDES AND 4' AT ENDS (8.8'x 33.5'x 2' DEEP) SIDE AREA: (8.8'+ 33.5') x 2 x 2 = 169 SF (0.74) = 125 GAL/DAY BOTTOM AREA: 8.8'x 33.5'= 295 SF (0.74) = 218 GAL/DAY CAPACITY = 343 GAL/DAY TASMANIA DRIVE a! e + Da e BENCHMARK AT RIGHT CORNER // �Q ,`�' / F ly' `✓I,I�IY BOTTOM BR ��•- v'�� BRICK STEP ELEVATION = 124.03 M 17-05 SEPTIC SYSTEM SECTION NEW PLUMBING TO BE CONFIRMED PRIOR TO CONSTRUCTION COVERS WITHI OF FINISHED G TION _EV. 1500 GAL SEPTIC TANK 6" OF STONE UNDER OR ECHANICALLY COMPACTED) TEE SIZES: INLET: 6" UP, 13" DOWN OUTLET: 6" UP, 14" DOWN BED ROOM 110, S870Op5 E ► �- 112 �� -" _- LOAMY SAND I.P. - - i_ \ - - 110 = Q BATH ROOM �� t1-116\ X114- ------� � \\ �� 112 -'\\ \ 112 \ PORCH ROOM LIVING clos ROOM \ PERC AT 60" 114 Flet "NaU p Q e�� ' _ _ � � \ \ 114 \ 132" I-xe (� NO GROUND WATER ENCOUNTERED �- 120 --- - 1 - - S'\ \ 116 118 I G� E ^� �h 120 116 Q '' ' m !4 w 122 �p� o 10' ` I o m 122 0 i ` z� 11 II \ ,g0 1116 118Ld Ooh i 114 �i� yeaAive Q W Q Pel a lit valid for ItEPA11 OF SEPTIC SYS 1 FN I -- \ _j ONLY, due; to- State an Local septic variances( is req fired for vQ Board of Ilealth,review a it approval Y. future additions/ enol ations/altcrafions Co co sewage facilities"and/or sti uctures/dwelling: EXISTING SEPTIC SYSTEM LOOP, m,• .;.4 #e rit;h Department. (SEE NOTE 13) APPPIQVL:�, r W 100.00' N 85°00'55" W a! e + Da e BENCHMARK AT RIGHT CORNER // �Q ,`�' / F ly' `✓I,I�IY BOTTOM BR ��•- v'�� BRICK STEP ELEVATION = 124.03 M 17-05 SEPTIC SYSTEM SECTION NEW PLUMBING TO BE CONFIRMED PRIOR TO CONSTRUCTION COVERS WITHI OF FINISHED G TION _EV. 1500 GAL SEPTIC TANK 6" OF STONE UNDER OR ECHANICALLY COMPACTED) TEE SIZES: INLET: 6" UP, 13" DOWN OUTLET: 6" UP, 14" DOWN 2 - 40 MIL POLY LINERS LINER 1: 28' x 4' DEEP TOP OF LINER = 119.0 BOTTOM ELEVATION = 115.0 LINER 2: 56' x 2' DEEP TOP OF LINER = 119.0 BOTTOM ELEVATION = 117.0 E� s E MAY 17 ?017 HEALTH DEPT )v -t.' MAX. COVER (1' MIN) 118.84 j 118.67 ELEV. ELEV. D -BOX (6" STONE UNDER) / 118.17 ELEV -GAS BAFFLE AT OUTLET TEE TEST HOLE LOGS ENGINEER: THOMAS MCLELLAN, RE WITNESS: PHIL RENAUD DATE: 2-14-17 PERCOLATION RATE: < 2 MIN/IN PEASTONE OR FILTER FABRIC 3/4" - 1 1/2" DOUBLE WASHED STONE INSPECTION PORT i- ELEV.= 119.0 II `I ° ° ° I'II 116.17 4 4 ELEV. 8.8'x 33.5' 3 - 500 GALLON CHAMBERS WITH 2' OF STONE AROUND SIDES AND 4' AT ENDS (8.8' x 33.5' x 2' DEEP) TH-1 122.0 ELEV 24„ BED ROOM BED ROOM LOAMY SAND BED 10YR 3/1 = Q BATH ROOM m 2nd FLOOR SCREEN DINING PORCH ROOM LIVING clos ROOM KITCHEN PERC AT 60" FBATH - 2.5Y 7/4 DECK 132" 1st FLOOR EXISTING FLOOR PLAN 2 - 40 MIL POLY LINERS LINER 1: 28' x 4' DEEP TOP OF LINER = 119.0 BOTTOM ELEVATION = 115.0 LINER 2: 56' x 2' DEEP TOP OF LINER = 119.0 BOTTOM ELEVATION = 117.0 E� s E MAY 17 ?017 HEALTH DEPT )v -t.' MAX. COVER (1' MIN) 118.84 j 118.67 ELEV. ELEV. D -BOX (6" STONE UNDER) / 118.17 ELEV -GAS BAFFLE AT OUTLET TEE TEST HOLE LOGS ENGINEER: THOMAS MCLELLAN, RE WITNESS: PHIL RENAUD DATE: 2-14-17 PERCOLATION RATE: < 2 MIN/IN PEASTONE OR FILTER FABRIC 3/4" - 1 1/2" DOUBLE WASHED STONE INSPECTION PORT i- ELEV.= 119.0 II `I ° ° ° I'II 116.17 4 4 ELEV. 8.8'x 33.5' 3 - 500 GALLON CHAMBERS WITH 2' OF STONE AROUND SIDES AND 4' AT ENDS (8.8' x 33.5' x 2' DEEP) TH-1 122.0 ELEV 24„ FILL O/A HORIZON LOAMY SAND 26" 10YR 3/1 119.8 B HORIZON LOAMY SAND 30" 10YR 5/8 119.5 C HORIZON MEDIUM SAND PERC AT 60" 2.5Y 7/4 132" 1 111.0 NO GROUND WATER ENCOUNTERED NOTES: 1. VERTICAL DATUM: ASSUMED 2. MUNICAPAL WATER IS AVAILABLE. 3. SCHEDULE 40 - 4" PVC PIPE TO BE USED THROUGHOUT SEPTIC SYSTEM. 4. ALL PRECAST UNITS SUBJECT TO TRAFFIC LOADS TO CONFORM WITH AASHTO H-20 SPECIFICATIONS. 5. PIPE PITCH = 1/4" PER FOOT (UNLESS NOTED OTHERWISE). 6. FIRST 2' OF PIPE OUT OF D -BOX TO BE SET LEVEL. 7. THE SEPTIC SYSTEM HAS NOT BEEN DESIGNED TO ACCOMODATE THE USE OF A GARBAGE DISPOSAL. 8. ALL CONSTRUCTION DETAILS ARE TO BE IN CONFORMANCE WITH THE STATE OF MASS. ENVIRONMENTAL CODE (TITLE FIVE) AND LOCAL HEALTH REGULATIONS. 9. CONTRACTOR TO VERIFY LOCATIONS OF ALL UTILITIES PRIOR TO CONSTRUCTION. 10. GROUND COVER OVER ALL SEPTIC SYSTEM COMPONENTS NOT TO EXCEED 3' WITHOUT VARIANCE. 11. FIELD SURVEY PROVIDED BY TERRY A. WARNER, P.L.S., HARWICH, MA. 12. THIS PLAN REQUIRES THE REVIEW AND APPROVAL OF ONE OR MORE TOWN DEPARTMENTS AND IS SUBJECT TO CHANGE UNTIL SUCH TIME. 13. EXISTING SEPTIC TANK AND LEACH PIT ARE TO BE PUMPED AND FILLED WITH SAND OR REMOVED. 14. D -BOX TO BE WATER TESTED TO ENSURE LEVELNESS AND EQUAL FLOW. 15. THIS DESIGN REQUIRES A VARIANCE APPROVAL FROM THE FOLLOWING TITLE 5 REGULATION: SECTION. 15.211 (1): LEACH AREA TO BE LESS THAN 20' FROM CELLAR WALL, (VARIANCE OF 4'). SITE PLAN LOCATION: 23 TASMANIA DR., YARMOUTHPORT, MA PREPARED FOR: MARK ROBINSON DATE: 2-15-17 SCALE: 1" = 20' BASS RIVER ENGINEERING TFlMAS J. McLELVAN, P.E. P.O. BOX 1163, EAST DENNIS, MA 02641 508-364-9048