GENERAL NOTES:
i •
1. THIS PARCEL IS SHOWN AS LOT #J-1 OF ASSESSORS MAP 30,•
1ALL -� COMPRISING 21,197 S.F., AND IS AS SHOWN ON A "PLAN OF LAND
F " u•, "` - IN YARMOUTH (WEST) , MASS. FOR J . R . SOUSA & SONS, INC.",
w _
DATED SEPT. 1
8, 1981 AND PREPARED BY BAXTER & NYE, INC.,
\ REGISTERED LAND SURVEYORS.
_
.� _ 2. THIS PARCEL LIES WITHIN THE "GENERAL BUSINESS" ZONE;
„_ fi _'_�,- �---�- -� -,POf� TT'•- �__� �\ ~ IT IS NOT LOCATED IN A SPECIAL FLOOD HAZARD ZONE AS SHOWN
S
�. ON F.E.M.A. COMMUNITY PANEL NO.250015-0005C, REVISED
JUNE 17, 1986.
3. PROPOSED USE IS FOR AUTOMOTIVE SERVICE LIMITED TO OIL
CHANGE AND LUBRICATION; NO REPAIRS TO BE DONE.
Y \ -
4. EXISTING STRUCTURES ON SITE SHALL BE REMOVED; REMOVE AND CAP OFF E.
XISTING ELECTRIC & WATER ENCOUNTERED BELOW GRADE;
\ THE CONTRACTOR SHALL NOTIFY "DIG -SAFE" FOR FIELD
VERIFICATION OF THE LOCATION OF ALL RECORDED UTILITIES 72
HOURS PRIOR TO ANY EXCAVATION. ALL EXISTING PAVING SHALL
BE REMOVED FROM THE BUFFER STRIPS (SEE NOTE #5).
5. UTMOST CARE SHALL BE TAKEN TO INSURE THAT (2) MASS.
HIGHWAY BOUNDS ARE NOT DISTURBED. THE BOUNDS ARE LOCATED
. 11.99' AND 79.26' FROM S.W. PROPERTY CORNER AND BURIED
APPROX. 12" BELOW THE EXISTING PAVING.
/ 6. BUFFER STRIPS ARE TO BE 10 FEET WIDE ON SIDES ABUTTING
OTHER PROPERTIES AND 20 FEET WIDE ON SIDES ABUTTING CAMP
STREET AND MAIN ST.-W.Y. THE BUFFER STRIPS SHALL BE
MULCTIF.D, WITH PLANTINGS OF 2" CALIBER TREES AT 20O.C.
to
AND GROUND COVER CONSISTING ONLY OF PLANT SPECIES
CLASSIFIED BY THE BOARD OF HEALTH AS SUITABLE FOR THE
LOCAL ENVIRONMENT. BUFFER STRIP ADJACENT TO RESIDENTIAL
u♦ ;' LOT ON NORTHERLY SIDE SHALL PROVIDE SCREENING BY PLANTING
N �y OF 5' TALL CANADIAN HEMLOCK AT 4' ON CENTER, STAGGERED IN
TWO ROWS. NO GRASS SHALL BE PLANTED AT ANY TIME. (SEE
\ 1 \ NITRATE LOAD CALC'N. ON SHEET "L-2")
7. BUILDING HEIGHT: 22 FT.
BUILDING AREA: FIRST FLOOR = 2,100 S.F.
• BASEMENT = 2,100 S.F.
` c, TOTAL PAVED AREA: 8,460 S.F.
' 1? ,� ---. TOTAL IMPERVIOUS AREA (PAVING + ROOF): 10,560 S.F.
\ \ \ �• •• •� � �' - - 8. ALL STORM RUN-OFF SHALL BE CONTAINED ON THE SITE WITH
•�_ ',`� CATCH BASINS OF RETENTION/LEACHING DESIGN, AS PER SCHEDULE
ON SHEET "L-2", AND A 24" WIDE SWALE ALONG NORTHERLY &
••�� I`'' �� ���� /OvaC/ EASTERLY PROPERTY LINES AS SHOWN; DESIGN CRITERIA IS BASED
'Q) R A 29 -HR. PERIOD.
UPON 20 -YR. STORM INTENSITY OVE
9. NO FLOOR DRAINS -ARE TO BE ITdSTALLED WITHIN THE BUILDING;
�� - •,•" o I Q P I ,�_ ANY SPILLAGE SHALL BE CONTAINED WITHIN THE BUILDING AND
•.' '.'cam 1 ) �� REMOVED ONLY BY A LICENSED HAZARDOUS WASTE HAULER.
°• 5cj,87 �,.•• ''•,� V �- - 10.MINIMUM PARKING REQUIRED BY BY-LAW = 15 SPACES:
• '•G�. , "` -r.---�'"`�" 13 SPACES @ 10' X 20'+ 2 HANDICAPPED SPACES AS SHOWN.
''
.✓,••-
^�..-.:.... • ..... • int io/t - 2 )
_ 11 REDUCTION IN EXISTING CURB CUT OPENINGS TO PROVIDE A
GXtS'(1tJG LrAGN106 i b is '�`J Gr � lee ''� 1 •'•�� � N ACCORDANCE WITH MASS. D.P.W.
_ �i SINGLE 24' ENTRANCE/EXITWAY TO MAIN ST W Y (ROUTE 8
� '• '.�' � ''+'�, SHALL BE COTJSTRUCTED'"I DA
AR.P_ATO I✓£ sEE 51_GTtoNS -rVAP10 /,' -23424-A'
- � PERMIT N0. 7
AP�ArJDo►- D �- \ 's`i �D N N/F O, G. SC11LE/C</ER • rzET. WALLS 00 Ci ger,, - - - _ " - 12
�� �; c,- •• •. SNT. L -Z' \ f5�a/ .AN ACCESSWAY SHALL BE PROVIDED FOR EMERGENCY VEHICLES WITH
A DENSE GRADED STONE BASE BENEATH THE MULCH OF THE BUFFER
1 r 1 SATGANAotq�//1£�fLGYC.�48'o.c. (srncz,Gco) a /•t __ STRIP HAVI14G STEEL POSTS AT LEAST 18 APART AND A CHAIN
IV �-t f Z4"1V�UF SWALE SHAt�GA %D f3E IN5rALLEO /� _
( ) di WITH SNAPHOOKS (NO LOCKS).
IJEW 12X 12 LEAGta��Y �,1 c.8.(fn4.3 % To Bt: INSTf�Lt-SD ' C,PS,(�rnd,��
•- : 1 ALL SITE WORK SHALL BE INSPECTED BY THE OWNER'S ENGINEER
G Nt�t�f'�I`►2 T�f1.1GN 4� i , _ _ sr�e LF-�Pf
13
.ALL
�. ^n.o ' 5 j�'`" �OwN yE7GN (TY/�cA�) is V it# AND CERTIFIED TO BE IN COMPLIANCE WITH THE APPROVED PLANS.
135.93' �� c
.� R� 25 ,
t \ .. �- _ /ate AV e'
yl v
` ` n • .•`..E J C.+h. r K _-Y 4 p ..•_—' 1 O O O oaO oI 4.
n
i �'l,ti� .-- 24 b%„G - .� 4 �l-' � 4W' _. Y `G� � -z OL np/°$•B \
\ p• C `�
w FOUNDATION RTIFICATION:
'' �lrn �• E � - �' .. 25 •�"x O - ` - /? ET Wr4 LL:�f 9 o is i , v. • - • —3-�- ��, � —1 __-
_ B
0 N �S4x b4'14- X p, y \� ,,\ ` I hereby certify that the foundation elevation and setbacks
-SfE aETA/L cN .4,V&L-Z"- _ �� /R \ • ti f 1 from property lines were constructed in substantial
`� °1. -2 \ c Z4'r�, conformance with the approved plan and are in conformance
�a • �. _ �, ..
o0 -- =-�_ 20, - ie 5k,^ with local zoning by-laws, to the best of my knocrledge and
'o'+ ' n��^/- �••�, I belief. Setbacks shown are the result of taped measurements
PROPOSED
in the field and not the result of an instrument survey.
BUILDI
� �� _ - N G �� i �wst ��dy. \�- �� •,: , ;. I
-3
Ale" _ 2.8. �f nQ AREA - 2100 S.F. I t'' � 2�T�rFd
F IN. FLR. - 26.2 FT. t5� J �z ���•• ��
-
N L
. i t •�,_ 9' .�. x;. -- rP, 8,'c�� i3 ,, � O . ° ' I t w �
,� i , x � q-9.• -#��� �� z � � � — —; � � • , ' j •
1 -- ----r —, -- — T I 25. �� — --- .~, O • • • OF_(7-E6Y 6EP_T1rY TNA? ALL, 51TE WoM►L INSTALLED AS o MAC 0 10, 11989, HAS
�, ` •', • . • SLE►.i 1n15TALI-Ep IN LOMPLtA1.1G1� K/1iL1 APPP_cyEo ftA►J5; FIrJAL 6�Aor1JG, SATE
E ��.B. Z 8.a'. - �.v�!< 4 • ' • • ...... LAND�ZAPG WOF- SHALL BE PEPz OP -AAF -D UQ:)M _-0ITA6L6 WEAT0:P_ d&3t)I'flo►J*'
�E3 AS 'per-OvJ►JE2'S A6Cr9AA4FNT W1TIA Tovo►J_ cr YAJZJAr0Tk -
PV Y.
� y. .j{^ ,�aF rP�/!/• - — �` _. ,;:• '''' _� �,t'.f,�� -_.s� 4 PtIG �Sy��_ _20.8��{er,
xn4
n-'G4,�(•0��•�'7 1 ry19/ 2'Ca1.T,-ces
if 2o' c. C. -
. J
M 't•6'qe e ItJ s /J lr i J
rl r -2G-BJ [r t
/JctG • t
h ��� � � � � �, �(c % \� �/CJ/,d tJrd;� S�Gu - - � �'6 Mt►,i.Ctt'P.) ' 1 / i'c%• 37._•2 i�", ` �•:k�\h .s,
Z,,yr/< fvyCT e�Z) i G.V.
f z• �' 2S `
-cR`- ?•3 M•k►•B. SOIL LOG
• :. -------.moi-•g-----
21• ,. \ , , i / No76� sl h' ia��c<.-6 /✓ene�r.S _"-' „� _
yo% 372 `-' SS' -tom ��'b 7 T. P . #
-- - - fl l\f �+ `� *Z�'7~ 01. / T. P. # Z
' �Gr'xst) Tefal 8/ +01 - - -- __=�a t7/ /9 (4 '�. , add'-titt f9¢ t toarnSUI�•o�1 iZ
BEf�iC.1Fl�AF�K.-n1R1L 1N FOLE 3 7Z1 � r "W: 1 . __
E1.EVATiOhJ = 28.oc�' g,33 ST 09 BLE (57.79 z'i Or�.�.Lolm
�N.G.V,v +� A. �_ $; pUgL1C VARIABLE WIDTH) --- r JWSO11
PEe c.
RT E 2 j k A,ed1�uw �4r,4
MA, -5. D. P JA/. �e
BASS L/NE Z h•,' 2 �' ^ M1 _ � ,
o '
�S3L. Said
C.
_,.
t WATCr_
Aw
7•
32 r„A
AV AT ,e N ..
- t . Z' 13Z
7 8Z
w
*Percolation test location: PLAN T.P.#rAol
,,�. ,a��.,t :`t�Mr� �;'•-�,��; `��
Bottom of test hole •48 �AtE= ZMPL
P; <.
.Percolation rate and determination
SCALE: 1' = 20 FT.
. I
o/tY5>urS. — — Exrsfiit� G 52 ---' p '. s'(rof sub -soil conditions were done
5�
on �Z-.G. Z. ,1987, as witnessed byy. -
�iope�%d Carctavrs: Test Pit Loc kora r No.. _(z�_
�•-_ _- ,."� Se tic Tank. o �' F .. /tai/. Nr' vE
Edge Wef/aad s
Spece; r5 fit
Resow e,Area </a y Mo.: a, Graf{ c /o w; (Noma!) ,►�oTt: Aa5JU5iED Nt(�Fl WAtE�
I,✓ater ///te, f-- Vv—=i P,' y � f E---•�--� r - -- . - � ccas�orry /�
i
�9 w h
Jia ?/ 0 0
0 Q ,�
r
rr.JJllll- - /'
” u, Pd
jt
AIA 4V S
CD Q
0
PLAN � �:�._<� N•
3 (�
j
J
LEG✓/S 134 Y'
LOCUS
1" = 2000':
RIECE9V[ED
MAR 14 1969
HEALTH DEPT.
PLAN OF t'r�5—UiL SITE &
SEWAGE DISPOSAL SYSTEM
QUICK OIL CHANGE BLDG.
84 MAIN STREET
WEST YARMOUTH, MA.
CHARON ASSOCIATES, INC.
CONSULTING ENGINEERS
,323 NECK ROAD, ROCHESTER, MA 02770
SCALE: AS NcTeci PEv.6: flov.IS,I9ec DWG. NO.
FODa, AS -WILT)
DATE: AP2)L. 2,.3, 198& REV j MAY 10,'6-9,
REQ. (; A\ Ay, zs, 1988 :(s17C As.GvrLT)
KEY. Z: )uLY 11, 1968
REV.3' At.w. 3, 1988
REV. A-: AUG. 17, 1988 .
r --EV. -5: SEPT, ►�,, 0-5e`