Loading...
HomeMy WebLinkAboutAce Oil Company - L2 - Sections & Details002C] MASS. STD, ZD" DIA. OP- 24"5Q�1A2E &MATE AND r?, SrT VE r;) . o " "N-Zo RATf_17 p/G Go►JG ` LEAC9106, m PIT WASNEv SjoNF O e VOL-- F b % G1 • � A' �G • D/ i - CATCH BASIN ' N T -S) DRAINAGE CALCULATION BASED ON 20 -YR. STORM INTENSITY: 1. 24 -HR. RAINFALL FOR 20 -YR. STORM = 5.5 11 2. RUNOFF DEPTH BASED UPON PAVED AREA = 4.3 3. STORM WATER VOLUME AT FRONT OF BLDG: V = 1,450 S.F. x (4.3/12)' = 520 CU.FT. 4. STORM WATER VOLUME AT REAR AND SIDE: V' = 7,415 S.F.-x (4_3/12)' = 2,660 CU.FT. CATCH BASIN SCHEDULE: C.B.# A B C D E F 1 8'-6" 8'-0" 2'-0" 12'-6" 25.7' 520 CU.FT. TOTAL 24 -HR. VOL. AT FRONT OF BLDG.= 520 CU.FT. 2 8'-6" 8'-0" 3'-0" 14'-6" 25.5' 545 " 3 8'-6" 8'-0" 3'-0" 14'-6" 23.0' 545 4 8'-6 81-oft2'-0" 12'-6" 22.2' 520 5 81-6" 8'-0" 2'-0" 12'-6"1 22.5' 520 „ 6 8'-6" 81-0112'-011. 12'-6" 24.5' 520 " TOTAL 24 -HR. VOL.AT REAR & SIDE = 2,650 CU.FT. :j _� __M1N. 1D_ fY, BU�F1✓2 S'f(z-I f - t fi G EOArz- PosTS - i I ST�1, 1) r5 FENc�. 1 1� EL.= zc, I ',4 � Bl?• PAVItiC� Y� 1,v/ 5WA L E. Tc 5l-ELV F_5 j A 01 <) EL. -t .p' , 000�aQ• �"(On1� w1iH �, r - oa�°b� P`S%n1E Gov��?i jdO o� AT EAe-k 41 E E P- j C l2 D 1 »--77-� / • NI P� F SECTION THRU_RETAINING WALL 1/^„ . RETAINING WALL SPECIFICATIONS: 1. MINIMUM CONCRETE STRENGTH IN COMPRE:SION = 31000 PSI 2. REINFORCING STEEL SHALL BE ITl ACCORDANCE WITH THE SCHEDULE BELOW, AND SHALL BE 40,000 PSI YIELD STRENGTH. ALL STEEL BARS SHALL BE SET 1.5 MINIMUM FROM SURFACE OF CONCRETE. ALL BARS SHALL BE FREE OF SCALE AT TIME OF INSTALLATION AND WIRED TOGETHER AT ALL POINTS. REIP'FORCING STEEL SCHEDULE: ..VERT. #4 @ 36" O.C., HOP.. 04 @ 12" O.C. "B" #6 @ 12" O.C., " #4 @ 12 O.C. "C" LONG. #4 c 12" O.C. TRANS. #8 C 12" O.C. „D„ „ #4 @ 12" O.C., „ #8 @ 12" O.C. "E" #8 @ 8" O.C. - STOP ALTERNATE BARS AT 2' & 5' ABOVE TOP OF FOOTING. TWO #8 BARS AT 4" O.C. IN BASE OF KEY,. 3. PVC SLEEVES FOR FENCE POSTS SHALL INCLUDE A WEEP' HOLE OF 1" MIN DI.Z:!-! . iT BASE OF SLEEVE. + �,I i rJ�itl FJo�S ��� r-- t" gpj'U/�.lNo�S 5u2F'acF Gov�SE te" - FrZ,� Br1", Bl/�iorz. BASE GD�2sE f2' 0 CL •. o--... -%AIo. 6-z-4vEL. BASE p C, O°V O 41 e o O C C° G O G DETAIL -TYPICAL PAVEMENT SECTION (N TS) -T,nr or rr»tJ, yt..Ey,= FIN. fUz• S.LEV. = 26,.50' - 1=1V) t -AD✓ f-LEv. = 2�0.2� ELEV. = 2Z f GOVER- AT 6r-AV`[20 iZATEO) GovcZ AT I f � SLOP y4 Fee, FT• r- rrtl N I `PER CT• -MttA Z"o� P'SToM4_ ►Z"M.r�l. �l C �' IA. GoVE Lill) 14 - Tc i i Y4 , ,vASNEv 24.25 ! 48 24.og' L - -- - tFJV. - 23.0 �� G ` 1►.1V. 15.So' 6�� c: Ssor1E I►JY. = � I ( i lt�Y.= (NOTE 24.ao - 23.17 2' z _ Ax 6' L AT. F, ms 8'x loan 6AL.56PjiG TANK. Vl5'` 50)<-- EA ' C Z' LAGN 11JCs GF{Al/.EF_2 �IZEl1C4 _ TOTAL LEA6At06 AMA = 144 s. F• SECTION (NTS) GENERAL NOTES - SEWAGE DISPOSAL SYSTEM: 1. THIS SYSTEM DOES NOT MAKE PROVISION FOR A GARBAGE GRINDER. 2. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH TITLE 5 AND LOCAL BOARD OF HEALTH REGULATIONS. 3. ALL COMPONENTS SHALL BE INSTALLED ON A LEVEL, STABLE BASE THAT WILL NOT SETTLE. PIPE SHALL BE LAID ON A FIRM BASE, FREE OF STONES. 4. REMOVE ALL UNSUITABLE SOILS BELOW THE LEACHING AREA AND TO A DISTANCE OF 10 FEET ON ALL SIDES, AND REPLACE WITH CLEAN, COARSE SAND. 5. BUILDING SEWER SHALL BE''SCH.40 P.V.C.;'EFFLUENT PIPE SHALL BE SCH.40 P.V.C. 6. WASHED STONE AND PEASTONE SHALL BE FREE OF IRON, FINES, & DUST IN PLACE, WITH LESS THAN 2/10% FINER THAN #200 SIEVE., 7. ALL COMPONENTS SHALL BE CAPABLE OF SUSTAINING H-20 VEHICLE LOADS, AS CERTIFIED BY THE SUPPLIER. 8. EFFLUENT PIPE SHALL BE LAID LEVEL FOR 2 -FT. FROM OUTLET. 9. "AS -BUILT" CERTIFICATION OF THE INSTALLED SYSTEM IS REQUIRED TO BE DONE BY THE ENGINEER PRIOR TO BACKFILL. SYSTEM DESIGN DATA: PERCOLATION RATE = 2 MIN./INCH 1 BOTTOM AREA = 144 S.F. BOT.LEACH'G.RATE = 1.0 GPD/S.F. : SIDE AREA = 51 S.F. SIDE LEACH'G.RATE= 2.5 GPD/S.F. : (48'X 1.08') TOTAL LEACH'G.AREA = 195 S.F. DESIGN FLOW RATE (PER TITLE 5) = [(1/3 X 2100 X 75 GPD/MSF) + (2/3 X 2100 X 50 GPD/MSF)) = 123 GPD SYSTEM CAPACITY = ( 144 S.F.X 1.0 GPD/S.F.) + ( 51 S.F.X 2.5 GPD/S.F.) = 272 GPD NITRATE LOADING CALCULATION: 1. TITLE 5 7EWAGE FLOW = 123 GPD. 2. AVERAGE NITROGEN CONCENTRATION = 25 PPM. 3. (123 GPD X 25 PPM) / 328 = 9.38 4. TOTAL LAWN AREA =NONE. (ALL LANDSCAPED AREAS TO BE MULCHED OR PLANTED WITH GROUND COVER SPECIES COMPATIBLE WITH LOCAL CONDITIONS, AS APPROVED BY BOARD OF HEALTH) 5. 0.0 6. 9.38 + 0.0 = 9.38 7. LOT AREA = 21,197 / 43,560 = 0.49 ACRE. 8. NITRATE LOADING = (9.38 X 0.275) / 0.49 ACRE = 5.26 PPM. SECTIONS AND DETAILS QUICK OIL CHANGE BLDG 90 MAIN STREET WEST. YARMOUTH, MA. .,r -- CH ARON ASSOCIATES, INC: i� CONSULTING ENGINEERS jj rQl(� 323 N SCK ROAD, ROCHESTER, MA 02770 ( DVIG. NO. SCALE: A S NOTED -DATE: JANUA25, 1988 .L-2