Loading...
HomeMy WebLinkAboutAce Oil Company - L1 Proposed Site & Sewage Disposal PlanGENERAL NOTES: ILL ALL 1. THIS PARCEL IS SHOWN AS LOT #J-1 OF ASSESSORS MAP 63, SHEET 30, COMPRISING 21,197 S.F., ZCIJED FOR "GENERAL JD N "CV AND IS NOT TnrlTrn INA SPECIAL FLOOD HAZARD ZONE. -ILL 2. PROPOSED USE IS FOR AUTOMOTIVE SERVICE LIMITED TO OIL ILL CHANGE AND LUBRICATION. 3. EXISTING STRUCTURES ON SITE SHALL BE REMOVED, INCLUDING EXISTING ELECTRIC & WATER ENCOUNTERED BELOW GRADE; THE CONTRACTOR SHALL NOTIFY "DIG -SAFE" FOP, FIELD VERIFICATION ` \`.\ OF THE LOCATION OF ALL RECORDED UTILITIES 72 HOURS PRIOR IV TO ANY EXCAVATION. 4. BUFFER STRIPS ARE TO BE 10 FEET WIDE ON SIDES ABUTTING P / \\ 1 OTHER PROPERTIES AND 20 FEET WIDE 01' SIDES ABUTTING CAMP ''. N, \A STREET AND MAIN ST.-W.Y. THE BUFFER STRIPS SHALL BE MULCHED WITH PLANTINGS OF 2" CALIBER TREES AT 20' O.C. AND tc GROUND COVER CONSISTING ONLY OF PLANT SPECIES CLASSIFIED BY THE BOARD OF HEALTH AS SUITABLE FOR THE LOCAL \ �� °� i / `,` \ �, ENVIRONMENT. BUFFER STRIP ADJACENT -0 RESIDENTIAL LOT ON NORTHERLY SIDE SHALL PROVIDE SC?,EE!TIITG BY FENCE AT TOP OF RETAINING WALL AND BY VEGETATIO11 AT ENDS OF WALL AS NEEDED. NO GRASS SHALL BE PLANTED WITHIN ANY LANDSCAPED SPACE AT ANY TIME. (SEE NITRATE LOAD CALCIN. ON SHEET "L-211) /.z 10- 5. BUILDING HEIGHT: 22 FT. BUILDING AREA: FIRST FLOOR = 2,100 S.F. BASEMENT = 2,100 S.F. PAVED AREA AT FRONT OF BUILDING = 1,450 S.F. REAR ?,SIP' it I = 7 , -'A 15 It TOTAL PAVE E!. D AF = E,S65 S.F. IT 6. ALL STORM FUN -OFF SHALL BE CC. -71-�.^ t.::, ON THE SITE WITH )0 CATCH B.ASINS OF RETENTION/LE',�HING ::ESIGN, AS PER SCHEDULE ON SHEET "L-2". DESIGN CRITEFIA BE BASED UPON 20 -YR. YR. STORM INTENSITY- _OVER A _2�-i7--rIERIO OR DRAINS ARE TO BE INS I T LPD WITHIN THE BUILDING; 7. 110 ANY SPILLAGE SHALL BE CONTAINED W17"TITTHE BUILDING AND co REMOVED ONLY BY A LICZU.S.ED HAZARD(aTUS, HAULER \ \ N 8. MINTIMUM ,RFI11-v REQUIRED BY BY -LAV 15 SPACES, 10' X 20'. (HANDICAPPED PARKING NOT REQUIRED) Alle 'G CURB CUT OPE.-N'S TO PROVIDE A 9. REDUCTION IN EXISTIT. - �y SINGLE 24' EXITWAY TO MAIN ST. - 1;.717. (ROUTE 28) SHALL BE SUBJECT TO APPROVAL BY MASS. D.P.V. 10.'LL SITE WORK SHALL BE INSPECTED THE OWNER'S ENGINEER TO VERIFY COMPLIANCE TO THE APPROED PLANS. 13- I 71q!lp A S OR STORM I'� '_NY SPILL -GE SHA L ONLY REMOVED 0 By A 8 MIj,4Ij4Ujj "R�.Ijj" 1, E E 6 AP -6A To ME AP.;-• UZI M /at " -4r-V r A� 0. • 13.9 alb_ 1,0!,3vcZer // ---� - - - .1 CIO N 7-7-07 '7_7 \10 0 e? joed- 4ali X-/ 0v,� xt� No -n /0 \Vv) ttr- 103, 0 0 \ jk cr)i 4_ L0 �-. e, Al" "IeVA;614 o / I x mo cl = J , -1_,. _� �, I•. .��-�.. _ --- Re -/o c� ted , 0/1- K3 -7 0' !� 0 1�_ `7 P -le lo 6e- 1�e- 10coted ts) -_2 ' I V) _1x; ?,/;2y 491d5. el) - &A. �,% }2 lc�� - �+ C 4� �l�C' N ,� C!v� - C /�/% ./c.�/%/L'G�� 11 11 � 0: Y) BUI PROP.- '27.00, f:L. 2j00 SF AREA 70' ? 0 �z. 30 ® 5 7 er 0 Id'z 70' z '3 NA11- IN PAVING - Li Kj 210.00 1-�ole 3722—h0\ is t ce),�,t V. 7.1 Cv 6 '7 9 'rlb;le, 1 1&,I, OIV/? (-;rle- 601_�b '1�34'Alew SOI L LOG _37Z/ 41,Alew 6,rdfz- T. P # T. P. # WEST YARMOUTH ...���s��o, ,/,Z,. $�.I� STin r,'tj Loa m , 144�— MAIN'E Subsoil/ PEec• /A e,? I'W, 5A k4 WATM FOP. _ZZI 7 1 32 - V 7, 0 S ITE PLAN *Percolation test location: T.P.#/ Bottom of test hole S C A LE: 1" = 20 FT. Percolation rate and determination - --- _,"vafeOns: x 53.9 of sub -soil clnoi,tions were done on 7:�66, V 87, as witnessed by 54 Tese 101't 1,vfafjer4 f, tjo.: Edye of WetlandsTalk T Arf/Z. I4A Y'9:5 Z -;In /,` of e 0 11,ev- Zone: spene, ,qes o v re e A, -ea A'/a9 Ne.: AIA /,V sr CD z Q/ OF S%TF PLAN LEWIS i3AY LOCUS to 1 = 2000'1 PLAN OF PROPOSED SITE & SEWAGE DISPOSAL SYSTEM QUICK OIL CHANGE BLDG. - 90 MAIN STREET WEST YARMOUTH, MA. CHARON ASSOCIATES, INC. CONSULTING ENGINEERS ,323 NECK ROAD, ROCHESTER, MA 02770 SCALE: AS McTeo DWG.. NO. DATE: DF -r-. ?-6, 1987 L-1