Loading...
HomeMy WebLinkAboutEngineer Certification LetterMORAN ENGINEERING ASSOC., LLC 941 Main Street, P.O. Box 183, South Harwich, MA 02661 Daniel P. Croteau, PE (508) 432-2878 Richard Judd, RS FAX (508) 432-3501 Michael Ladue, PLS MoranEng@gmall.com May 26, 2017 Yarmouth Health Department 1146 Route 28 South Yarmouth, Ma 02664 Septic System Installation Certification Letter Re: Moran Engineering Assoc., Project #16-039, plan date: 6/30/16 21 Lake Rd East West Yarmouth, Ma This letter serves to inform the Yarmouth Health Department that the following inspections were performed: on 4/21/17 the SAS unsuitable soils removal was inspected, on 4/26/17 the wall corner locations were set, on 5/2/17 the retaining wall footing steel placement was inspected, on 5/12/17 the wall steel placement was inspected, and on 5/24/17 I inspected the completed septic system installation and the pump & alarm operation at the referenced property. I found that the septic system was installed in compliance with 310CMR:15.000, the approved design plan dated 6/30/16, and the Yarmouth Board of Health Regulations. Sincerely, Daniel Croteau, PE Civil Engineering • Land Surveying