Loading...
HomeMy WebLinkAbout1998 Engineered Plan Sections used for Septic Repair - 2016T.O.F. AT EL. 34.5' SEPTIC PROFILE ACCESS COVER TO WITHIN 6" OF FIN. GRADE (NOT TO SCALE) ACCESS COVER (WATERTIGHT) TO /32xO- M.75' OF COVER OVER PRECAST 13, /j�WITHIN 6" OF FIN. GRADE 3 , XO 7% Ci nDC Ochi 110cn Hutu 30.5' 30.14' 2 ( % SLOPE) PROPOSED 1 500 GALLON SEPTIC TANK (H- 10 ) DEPTH OF FLOW = 4' N TEE SIZES: INLET DEPTH OUTLET DEPTH = 14 FOUNDATION- 6,z OUNDATION-62 Er� Im RUN PIPE LEVEL 29.8%FOR FIRST 2' 9' GAS 29.23' BAFFLE 29.40' 6" CRUSHED STONE OR MECHANICAL COMPACTION. (15.221 [2]) (-L-% SLOPE) ELECTRIC TRANSMISSION \ EASEMENT 6i• LOT 140 .Area = 89,629 sq.ft 2.06 Acres G- I�--o2 9�\ SEPTIC TANK 7' 66- 66—___�7 2 DOUBLE WASHED PEASTONE - �aooavoEDmo 28.0' ED00 ED 0=E:D G VE-:11 X 0 0 0= � 0 ED �g 2'aaa C7 MOMCl 3/4 TO 1 1/2" DOUBLE WASHED STON D' BOX 1 1 ' LEACHING FACILITY LOT 139 DIRECT ALL RUN-OFF AWAY FROM DWELLING 4645/ '40 O6� N/F GARQ6 M, HUNTFNR OTE: LAWN AREA TO BE KE TO A MAXIMUM 2000 S.F NGINEER TO INSPECT AND E IFY WHEN INSTALLED B# 98-137 i BENCHMARK CATCH BASIN ELEV = 26.46' ASS ' .4 Q ' 25.3 'CW , HIGH PT. .l� PINNACLE LANE 31'\24.4 ® �3 / 27' / ELEC BELL CAN ' RISERS CATCH BASIN DOES NOT INTERCEPT GROUNDWATER DRAIN EASEMENT 2ss, FNDN. IS 9.2' ABOVE THE HIGH POINT IN THE ROAD TEST HOLE LOGS ENGINEER: D.A. OJALA, SE 31 x0 WITNESS: AMY VON HONE, RS DATE: JUNE 2, 1998 2,17' PERC. RATE _ < 2 MIN. PER INCH 28.83' CLASS I SOILS P# N/A @t SIDES 0 26.0' 0 2" 5.8' 6" 20.2' 30" 120" 4 0 A LS 1OYR 4/3 B LS 10YR 5/6 C M/C 2.5Y 6/6 ELEV. 30.2' O„ 2" 6" 26" 27.7' - 20.2' 120" NO WATER ENCOUNTERED SEPTIC DESI�'N: (GARBAGE DISPOSER is NOT ALLOWED _ ) BEDROOMS 01 10 GPD) = 330 GPD J A 330 GPD DESIGN FLOW EPTIC TANK: 330 GPD (_2--) 660 SE A 1500 GALLON SEPTIC TANK EACHING: SIDES: 2(30 + 9.83) 2 (.74) = 118 OTTOM: 30 x 9.82 (.74 = 218 DTAL: 454 S.F. 336 GPD .ISE (3) 500 GAL. LEACHING CHAMBERS (ACME OR DUAL) WITH 2.5' STONE AT SIDES AND 2.25' AT ENDS LEGEND 100.0 PROPOSED SPOT ELEVATION 100x0 EXISTING SPOT ELEVATION 100 PROPOSED CONTOUR — 10G— — EXISTING CONTOUR I,, PROP SHRUB (RHODODENDRON, YEW, ETC.) /4 /,w-7--`• BOARD OF HEALTH , MA PPROVED DATE a off 508-362-4541 fax 5(8 362-9880 down cape engineering, inc. CIVIL ENGINEERS LAND SURVEYORS 939 main st. yarmouth, ma 02675 � r � 4 0 A LS 1OYR 4/3 B LS 1OYR 5/6 C M/C 2.5Y 6/6 ELEV. 30.2' 0 20.2' ASSESSORS MAP 113 PARCEL J140 ZONING DISTRICT: R-40 YARD SETBACKS: FRONT = 30' SIDE = 20' REAR = 20' PLAN REF. - "PLAN OF LAND IN YARMOUTH, MASS. AS PREPARED FOR WALTER AND NANCY[ H. DAWLEY D. NOVEMBER 28, 1994 BY SWEETSER ENGINEERING, BOX 713, SO. DENNIS" (SIGNED AS ANR 1-11-95) FLOOD ZONE: C NOTE: VERIFY BUILDING SETBACKS WITH BUILDING DEPARTMENT PRIOR TO CONSTRUCTION NOTES- 1. DATUM IS _TAPPROXIMATED FROM DENNIS C)I.IAn 2. MUNICIPAL WATER IS AVAILABLE 3. MINIMUM PIPE PITCH TO BE 1 /8" PER FOOT. 4. DESIGN LOADING FOR ALL PRECAST UNITS TO BE AASHO H- 100 5. PIPE JOINTS TO BE MADE WATERTIGHT. 6. CONSTRUCTION DETAILS TO BE IN ACCORDANCE WITH MASS. ENVIRONMENTAL CODE TITLE V. 7. THIS PLAN IS FOR PROPOSED WORK ONLY AND NOT TO BE USED FOR LOT LINE STAKING. 8. PIPE FOR SEPTIC SYSTEM TO SCH. 40-4" PVC. 9. COMPONENTS NOT TO BE BACKFILLED OR CONCEALED WITHOUT INSPECTION BY BOARD OF HEALTH AND PERMISSION OBTAINED FROM BOARD OF HEALTH. 10. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION OF ALL UNDERGROUND & OVERHEAD UTILITIES PRIOR TO COMMENCEMENT OF WORK. S/ TE AND SEWAGE PLAN OF LOT 140 PINNACLE LANE IN THE TOWN OF: YARMOUTH PREPARED FOR: MARK LEBEAUX 40 0 40 80 120 SCALE: 1"= 40' ARNE H. OJAeL�A� NQ 204 H E H. DATE: APRIL 21, 1998 REV. 6/3/98