Loading...
HomeMy WebLinkAboutEngineered Plan - 2010TOP OF FOUNDATION EL=51.2 a. J 48.0+ Existing Existing 24" diameter concrete covers raised to within 6" of finish grade (oras noted) Inspection Port and cap w1th magnetic marking tape to wthTEL 3" of grade EL =49.4± EL =48.5± =46.2-46.9(1nax) \ 49.2± t °� Existing 47.7.± 45.9± x \±716-t 46.40 46.23 45.50 �! ' Existing N Proposed Gas Baffle and 44.60 Zabel Filter ......:...:,......:.,....:•.... . :, ..•::...:,. , ......� E-- Longest Run ETY FI/E (25) ADS ARC36 /N B E 5s (36/6B�2) LEAC� Cf1AMBERSD72'+ DB -6 CONFICLYRA TION W1 7 -HFI VE (5) ROWS EXISTING l 000 GALLON (1-1-20 Rated) OF Fll/E (5) 0-1AM0ER5 SEPTIC TANK # l D -BOX LEA q1)/-1CHAMBEIRS EL=37.4± Bottom of Test Hole FLOW PROEI LE 1 NOT TO SCALE I TOP OF FOUNDATION 241 dameter concrete covers EL= 5 1 .2 raised to within 6" of finish grade (or as noted) a IExisting EL=48.9±- CONSTRUCTION NOTE5 l.) ALL WORK SHALL CONFORM TO THE STATE ENVIRONMENTAL CODE TITLE 5 (3 10 CMR 15.000): STANDARD REQUIREMENTS FOR THE5/7ING, CONSTRUCTION, 1N5PECTION, UPGRADE AND E16PAN510N OF ON -517E SEWAGE TREATMENT AND D15P05AL SYSTEMS AND FOR THE TRANSPORT AND D15PO5AL OF 5E/'TAGE AND THE LOCAL BOARD OF HEALTH REGULATIONS. 2.) ANY5EPTIC SYSTEM COMPONENT 11V57-ALLED IN A LOCATION WHERE THERE l5 POTENTIAL FOR VEHICLES OR HEAVYEQUIPMENT TO PASS OVER IT SHALL BE DESIGNED TO WITHSTAND ANN -20 LOADING. 1F UNDER AN IMPERVIOUS SURFACE SYSTEM SHALL BE VENTED TO THE ATMOSPHERE. 3.) TO MINIMIZE UNEVEN 5E77L11V6, ALL SYSTEM COMPONENTS SHALL BE 11V5TALLE9 ON A 57ABLE MECHANICALL Y- COMPACTED BA5E ON SIX INCHES OF CRUSHED STONE 4.) COVERS OVER THE INLET AND OUTLET TEES OF THE SEPTIC TANK, THE D15TRIBUTION BOX, AND THE SOIL ABSORPTION SYSTEM SHALL BE RAISED TO WITHIN 6" OF FINAL GRADE LEACHING FIELDS, TRENCHES, AND OTHER 501L ABSORPTION SYSTEMS WITHOUT ACCE55 MANHOLES SHALL HAVE AT LEAST ONE 0) INSPECTION PORT COIV515TING OF PERFORATED 4" PVC PIPE PLACED VERTICALLY TO THE BOTTOM OF THE 50/L ABSORPTION SYSTEM WITH A CAP, TIED WITH MAGNETIC MARKING TAPE ACCE55/BLE TO WITHIN 3" OF FINAL GRADE 5.) PIPING SHALL CONSIST OF 4"SCHEDULE 40 PVC OR EQU/VALENT. PIPE SHALL BE LAID ON A MINIMUM CONTINUOUS GRADE OF NOT LE55 THAN 295 FROM THE BUILDING TO THE SEPTIC TANK, AND NOT LE55 THAN I % OTHERWISE 6.) Dl5TRlBUTION LINES FOR THE 50/L ABSORPTION SYSTEM SHALL BE 4" DIAMt?ER 5CHE9ULE 40 PVC (OR EQUIVALENT) LAID AT 0.005 FT/FT. UNLESS OTHERWISE NOTED. LINES SHALL BE CAPPED AT END OR AS NOTED. 7.) LINES FROM THE DISTRIBUTION BOX TO BE LEVEL FOR THE F195T TWO (2) FEET BEFORE PITCHING TO THE SOIL ABSORPTION 5Y5TEM. 015TRIOUTION BOX SHALL BE WATER TESTED TO ASSURE EVEN DISTRIBUTION. 6.) GROUT TO BE USED AT ALL POINTS WHERE PIPE5 ENTER OR LEAVE ALL CONCRETE STRUCTURES IN ORDER TO PROVIDE A WATERTIGHT SEAL. 9.) HEAvYEQUIPMENTSHALL NOT BEALLOWED TO OPERATEOVER THELIMITS OFTHE SEWAGE 015P05AL FIELD DURING THE COURSE OF CONSTRUCTION OF THE SYSTEM. /0.) IN ACCORDANCE WITH 3 /0 CMR 15.221, ALL SYSTEM COMPONENTS SHALL BE MARKED WITH MAGNETIC MARKING TAPE / I.) THERE ARE NO KNOWN WELLS WITHIN 100' OF THE PROPOSED 5OIL AB5ORPTlON SYSTEM. 12.) FROM THE DATE OF THE INSTALLATION OF THE 501L ABSORPTION SYSTEM UNTIL RECEIPT OF THE CERTIFICATE OF COMPLIANCE THE PERIMETER SHALL BE STAKED AND FLAGGED TO PREVENT U5E OF THE AREA THAT MAY CAU5E DAMAGE TO THE SYSTEM. 13.) THE DE5/GNER WILL NOT BE RE5PON518LE FOR THE SYSTEM A5 DESIGNED UNLESS CONSTRUCTED AS SHOWN ON PLAN. ANY CHANGES SHALL BE APPROVED IN WRITING BY THE DESIGNER. 14.) THE BOARD OF HEALTH REQUIRES INSPECTION OFALL CONSTRUCTION BYAN AGENT OF THE BOARD OF HEALTH AND THE DESIGNER. THE DESIGNER SHALL CERTIFY IN WRITING THAT THE SEWAGE 015FO5AL SYSTEM WA5 IN57ALLEO IN ACCORDANCE WITH THE TERMS OF THE PERMIT AND THE APPROVED PLANS. 46 HOURS ADVANCE NOTICE I5 REQUESTED. 15.) CONTRACTOR SHALL BE RE5PON5/BLE FOR DETERMINING THE LOCATION OFALL UNDERGROUND AND OVERHEAD UTILITIES PRIOR TO COMMENCEMENT OFANY WORK. TH15 INCLUDES, BUT l5 NOT LIMITED TO, REQUESTS TO DI65AFE ANYPRIVATE UTILITY COMPANIES, AND THE LOCAL WATER DEPARTMENT. 16.) CONTRACTOR SHALL VERIFY THAT ALL WA57EL1NE5ARE CONNECTED BY WATER TESTING WITHIN THE DWELLING PRIOR TO INSTALLATION OFAl(Y5EP7/C COMPONENT5. 17,) CONTRACTOR SHALL VERIFYEXl5TIN6 INVERT ELEVATIONS PRIOR TO INSTALLATION OF ANY5EPTIC SYSTEM COMPONENTS. 18.) INSTRUMENT 5URVEYCONOUCTED FOR PROPOSED WORK ONLY. 517E PLAN SHALL NOT BE USED FOR STAKING, OR ANY OTHER PURPOSES. I9.) EXISTING /000 GALLON 5EPTIC5 TANK TO BE UTILIZED. PVC TEES TO BE IN57ALLED ON INLET AND OUTLET PIPES IF NECESSARY, AND A GAS BAFFLE AND ZABEL FILTER INSTALLED IN THE OUTLET TEES. 20.) EY15TING SOIL ABSORPTION SYSTEM TO BE LOCATED, PUMPED DRY, FILLED W1TH CLEAN SAND AND ABANDONED IN PLACE AREA TO BE COMPACTED TO MINIMIZE SETTLING. 1 TWENTY FIVE (25) ADS ARC3G (3G I GBD) LEACH y CHAMBERS IN BED CONFIGURATION WITH FIVE (5) ROWS OF FIVE (5) CHAMBERS D -BOX PLAN VIEW SCALE: I " = 10' SYSTEM DE5IGNICALCULATION5 Inspection Ports (See Note #4) SEWAGE DESIGN FLOW REQUIRED: BEDROOM DUPLEX @ I 1 O GPD / BEDROOM = 330 GPD REQUIRED SEWAGE DESIGN FLOW PROVIDED.• TWENTY (25) ADS UN1T5 /N BED CONFIGURATION IN FIVE (5) ROWS OF F/VE (5) UNITS, EACH. vt = !(330 0.74) / (4.8 FTz/FT) / 5.0 Lr7 = 19 AD5I UNIT5 REQUIRED (25 PROVIDED) 444 GPD PROVIDED > 330 GPD REQUIRED SEPTIC TANK CAPACITYREQUIRED: 330 GPD X 200576 = 660 GPD REQUIRED SEPTIC TANK CAPACITYPROVIDED: I TWO EXl5TING 1000 GALLON SEPTIC TANKS A GARBAGE 015P05AL lS NOT PERVl7TED WITH TI -115 DES/GN FLOW TEST MOLE LOGS I Test Hole # I (EL"=47.4±) LEGEND (I2.3) Depth Layer 5011 CIa55 I Sod Color 48.7± 0"-4" A Existing m I OYR 3/2 to D -Bo a 0 Existing _ `a � 4 7.3 + - Existing andy Loam Proposed -o--a--a- 8"-22" Gas Baffle and ..; Oandy Loam Zabel Flter TIP- 5T 22"-1 20" C I Fine -Medium Sand I OYR 4/G Perc @ 50 Existing (47.G) (47.G) RE5ERVED FOR FUTURE USE F -457-11V6 / 000 GALLON ® SEPTIC TANK #2 FIRE HYDRANT CONSTRUCTION NOTE5 l.) ALL WORK SHALL CONFORM TO THE STATE ENVIRONMENTAL CODE TITLE 5 (3 10 CMR 15.000): STANDARD REQUIREMENTS FOR THE5/7ING, CONSTRUCTION, 1N5PECTION, UPGRADE AND E16PAN510N OF ON -517E SEWAGE TREATMENT AND D15P05AL SYSTEMS AND FOR THE TRANSPORT AND D15PO5AL OF 5E/'TAGE AND THE LOCAL BOARD OF HEALTH REGULATIONS. 2.) ANY5EPTIC SYSTEM COMPONENT 11V57-ALLED IN A LOCATION WHERE THERE l5 POTENTIAL FOR VEHICLES OR HEAVYEQUIPMENT TO PASS OVER IT SHALL BE DESIGNED TO WITHSTAND ANN -20 LOADING. 1F UNDER AN IMPERVIOUS SURFACE SYSTEM SHALL BE VENTED TO THE ATMOSPHERE. 3.) TO MINIMIZE UNEVEN 5E77L11V6, ALL SYSTEM COMPONENTS SHALL BE 11V5TALLE9 ON A 57ABLE MECHANICALL Y- COMPACTED BA5E ON SIX INCHES OF CRUSHED STONE 4.) COVERS OVER THE INLET AND OUTLET TEES OF THE SEPTIC TANK, THE D15TRIBUTION BOX, AND THE SOIL ABSORPTION SYSTEM SHALL BE RAISED TO WITHIN 6" OF FINAL GRADE LEACHING FIELDS, TRENCHES, AND OTHER 501L ABSORPTION SYSTEMS WITHOUT ACCE55 MANHOLES SHALL HAVE AT LEAST ONE 0) INSPECTION PORT COIV515TING OF PERFORATED 4" PVC PIPE PLACED VERTICALLY TO THE BOTTOM OF THE 50/L ABSORPTION SYSTEM WITH A CAP, TIED WITH MAGNETIC MARKING TAPE ACCE55/BLE TO WITHIN 3" OF FINAL GRADE 5.) PIPING SHALL CONSIST OF 4"SCHEDULE 40 PVC OR EQU/VALENT. PIPE SHALL BE LAID ON A MINIMUM CONTINUOUS GRADE OF NOT LE55 THAN 295 FROM THE BUILDING TO THE SEPTIC TANK, AND NOT LE55 THAN I % OTHERWISE 6.) Dl5TRlBUTION LINES FOR THE 50/L ABSORPTION SYSTEM SHALL BE 4" DIAMt?ER 5CHE9ULE 40 PVC (OR EQUIVALENT) LAID AT 0.005 FT/FT. UNLESS OTHERWISE NOTED. LINES SHALL BE CAPPED AT END OR AS NOTED. 7.) LINES FROM THE DISTRIBUTION BOX TO BE LEVEL FOR THE F195T TWO (2) FEET BEFORE PITCHING TO THE SOIL ABSORPTION 5Y5TEM. 015TRIOUTION BOX SHALL BE WATER TESTED TO ASSURE EVEN DISTRIBUTION. 6.) GROUT TO BE USED AT ALL POINTS WHERE PIPE5 ENTER OR LEAVE ALL CONCRETE STRUCTURES IN ORDER TO PROVIDE A WATERTIGHT SEAL. 9.) HEAvYEQUIPMENTSHALL NOT BEALLOWED TO OPERATEOVER THELIMITS OFTHE SEWAGE 015P05AL FIELD DURING THE COURSE OF CONSTRUCTION OF THE SYSTEM. /0.) IN ACCORDANCE WITH 3 /0 CMR 15.221, ALL SYSTEM COMPONENTS SHALL BE MARKED WITH MAGNETIC MARKING TAPE / I.) THERE ARE NO KNOWN WELLS WITHIN 100' OF THE PROPOSED 5OIL AB5ORPTlON SYSTEM. 12.) FROM THE DATE OF THE INSTALLATION OF THE 501L ABSORPTION SYSTEM UNTIL RECEIPT OF THE CERTIFICATE OF COMPLIANCE THE PERIMETER SHALL BE STAKED AND FLAGGED TO PREVENT U5E OF THE AREA THAT MAY CAU5E DAMAGE TO THE SYSTEM. 13.) THE DE5/GNER WILL NOT BE RE5PON518LE FOR THE SYSTEM A5 DESIGNED UNLESS CONSTRUCTED AS SHOWN ON PLAN. ANY CHANGES SHALL BE APPROVED IN WRITING BY THE DESIGNER. 14.) THE BOARD OF HEALTH REQUIRES INSPECTION OFALL CONSTRUCTION BYAN AGENT OF THE BOARD OF HEALTH AND THE DESIGNER. THE DESIGNER SHALL CERTIFY IN WRITING THAT THE SEWAGE 015FO5AL SYSTEM WA5 IN57ALLEO IN ACCORDANCE WITH THE TERMS OF THE PERMIT AND THE APPROVED PLANS. 46 HOURS ADVANCE NOTICE I5 REQUESTED. 15.) CONTRACTOR SHALL BE RE5PON5/BLE FOR DETERMINING THE LOCATION OFALL UNDERGROUND AND OVERHEAD UTILITIES PRIOR TO COMMENCEMENT OFANY WORK. TH15 INCLUDES, BUT l5 NOT LIMITED TO, REQUESTS TO DI65AFE ANYPRIVATE UTILITY COMPANIES, AND THE LOCAL WATER DEPARTMENT. 16.) CONTRACTOR SHALL VERIFY THAT ALL WA57EL1NE5ARE CONNECTED BY WATER TESTING WITHIN THE DWELLING PRIOR TO INSTALLATION OFAl(Y5EP7/C COMPONENT5. 17,) CONTRACTOR SHALL VERIFYEXl5TIN6 INVERT ELEVATIONS PRIOR TO INSTALLATION OF ANY5EPTIC SYSTEM COMPONENTS. 18.) INSTRUMENT 5URVEYCONOUCTED FOR PROPOSED WORK ONLY. 517E PLAN SHALL NOT BE USED FOR STAKING, OR ANY OTHER PURPOSES. I9.) EXISTING /000 GALLON 5EPTIC5 TANK TO BE UTILIZED. PVC TEES TO BE IN57ALLED ON INLET AND OUTLET PIPES IF NECESSARY, AND A GAS BAFFLE AND ZABEL FILTER INSTALLED IN THE OUTLET TEES. 20.) EY15TING SOIL ABSORPTION SYSTEM TO BE LOCATED, PUMPED DRY, FILLED W1TH CLEAN SAND AND ABANDONED IN PLACE AREA TO BE COMPACTED TO MINIMIZE SETTLING. 1 TWENTY FIVE (25) ADS ARC3G (3G I GBD) LEACH y CHAMBERS IN BED CONFIGURATION WITH FIVE (5) ROWS OF FIVE (5) CHAMBERS D -BOX PLAN VIEW SCALE: I " = 10' SYSTEM DE5IGNICALCULATION5 Inspection Ports (See Note #4) SEWAGE DESIGN FLOW REQUIRED: BEDROOM DUPLEX @ I 1 O GPD / BEDROOM = 330 GPD REQUIRED SEWAGE DESIGN FLOW PROVIDED.• TWENTY (25) ADS UN1T5 /N BED CONFIGURATION IN FIVE (5) ROWS OF F/VE (5) UNITS, EACH. vt = !(330 0.74) / (4.8 FTz/FT) / 5.0 Lr7 = 19 AD5I UNIT5 REQUIRED (25 PROVIDED) 444 GPD PROVIDED > 330 GPD REQUIRED SEPTIC TANK CAPACITYREQUIRED: 330 GPD X 200576 = 660 GPD REQUIRED SEPTIC TANK CAPACITYPROVIDED: I TWO EXl5TING 1000 GALLON SEPTIC TANKS A GARBAGE 015P05AL lS NOT PERVl7TED WITH TI -115 DES/GN FLOW TEST MOLE LOGS I Test Hole # I (EL"=47.4±) LEGEND (I2.3) Depth Layer 5011 CIa55 I Sod Color Comments 0"-4" A Fine-Medwmandy Loam I OYR 3/2 GO' Wide Public Way 4"-8" E Fine -Medium andy Loam I OYR 2/G -o--a--a- 8"-22" B Fine -Medium Oandy Loam I OYR 5/G TIP- 5T 22"-1 20" C I Fine -Medium Sand I OYR 4/G Perc @ 50 DATE OF TESTING: 0422/ 10 SOIL EVALUATOR: LINDA J. PINTO, P.E., CSN ENGINEERING BOARD OF HEALTH AGENT: AMY VON HONE, YARMOUTH HEALTH DEPARTMENT PERCOLATION RATE: LE55 THAN 2 MIN/INCH IN "C2" LAYER i NO GROUNDWATER ENCOUNTERED I .) Deed Book 19893 Page 195 - 2.) Assessor's Map 87 Parcel 194 3.) Thl5 property Is in a Zone II Df a Public Water Supply 4.) Flood Zone: C i r LEGEND (I2.3) EXISTING SPOT GRADE x24.5 PROPOSED SPOT GRADE _244- EX15TI NG CONTOUR 24- PROPOSED CONTOUR Old Townhouse Road WATER SERVICE LINE o OVERHEAD UTILITY LINES GO' Wide Public Way I c GAS SERVICE LINE 1973 County Layout TOP OF BANK -o--a--a- i s } r N 89053'20" E 96.35' r : y South Yarmouth, MA 02664 FENCE TIP- 5T TE5T HOLE LOCATION Prepared for: (47.9) DB D15TRI15UTION BOX � UVJ 0�� Fence (47.G) (47.G) RE5ERVED FOR FUTURE USE Co..) UTILITY POLE ® CATCH BASIN LOT 4 FIRE HYDRANT / Area=23,571 S.F. CONCRETE BOUND Engineering Electric Company Easement 0 20 40 GO P.O. Box 2030 Phone: (508) 274-7347 Teaticket, MA 02536 Fax: (508) 548-5478 (47.4) SCALE 1 "=20' C:\C5N\RR-Quarterma5ter\5D5-RR-Quarterma5ter.dwg Date: 04/28/1 OScale: As Shown I By: WP Check: G5P I Project No. C5N0085 P arkn9 (47.2) I / (•.7.4) (•9G.7) BOJ d °•a° a a Paved ° a. EX15t`n9 a . . Vol I I i-49-, 0 Q Parcel 195 Towr Water I I (J�� \\� �r o� P do GG�� c Ac , ( N I , ;\}iI' Qeck i '\N WSW G 1� Approximate Location of Existing SA5 C to be Abandoned (See Note #20) BENCHMARK Corner Concrete Block EL=50.00 (Assumed Datum) N I 45° Wye -� N I I Proposed Soil Absorption System (See Detail) i I Bath Bdr #I �. Kitchen 2 15 Deck - 0. -LI) Uwng Living Deck Bdr Kitchen #2 Bath Bdr #3 Bath FLOOR PLAN NOT TO SCALE INSPECTION NOTE: PRIOR TO FINAL INSPECTION BY THE ENGINEER, 5Y5TEM NEED5 TO BE COMPLETE INCLUDING BUILDUP FOR COVERS. Parcel 193 Town Water Parcel 192 Town Water Ex(50 lex A Bedroom dat`on W < • Paved a 01101)" 2. ° tX15t1�r`ve tk b c9 pa° \ ved 4c(48.G) a pr,ve o 0'm`n Garage j5hed 800 `7 44„ W 90.00, 51TE PLAN SCALE: I " = 20' Parcel 148 Town Water YARMOUTH, �o�tie G MA Q�r y LOCUS Old Town House Rd S I � a 517E LOCUS NOT TO SCALE Parcel 149 OFSsgo LEGEND (I2.3) EXISTING SPOT GRADE x24.5 PROPOSED SPOT GRADE _244- EX15TI NG CONTOUR 24- PROPOSED CONTOUR w WATER SERVICE LINE o OVERHEAD UTILITY LINES u UNDERGROUND UTILITY LINES c GAS SERVICE LINE - - TOP OF BANK -o--a--a- LIMIT Of WORK _ F°Wye+ 618 Main Street EDGE OF CLEARING r : y South Yarmouth, MA 02664 FENCE TIP- 5T TE5T HOLE LOCATION Prepared for: SEPTIC TANK DB D15TRI15UTION BOX 5A5 SOIL ABSORPTION SYSTEM Reserve RE5ERVED FOR FUTURE USE Co..) UTILITY POLE ® CATCH BASIN HEALTH N®®� FIRE HYDRANT DRINKING WATER WELL 12 CONCRETE BOUND Parcel 149 OFSsgo Town Water 7 1tOF,IGgs �o� EDWARD LINDAJ.STONE N PINTO .289 00 �N 0 CIVIL c" No. 46504 01STE��G SS10NA NG Surve Work by. wl " p G- A & M Land Services _ F°Wye+ 618 Main Street r : y South Yarmouth, MA 02664 w�e� ra�6e•�'', Ph. (508) 787-1777 Email.• anmland®comcest.net I; Prepared for: Z�..q � x; Victor Valclov)no5 1062 Main 5t., Chatham, MA Proposed Sewage D15po5al System I * 3 Quartermaster Row, Yarmouth, MA MAY 04 2010 Prepared by: HEALTH N®®� Engineering 0 20 40 GO P.O. Box 2030 Phone: (508) 274-7347 Teaticket, MA 02536 Fax: (508) 548-5478 SCALE 1 "=20' C:\C5N\RR-Quarterma5ter\5D5-RR-Quarterma5ter.dwg Date: 04/28/1 OScale: As Shown I By: WP Check: G5P I Project No. C5N0085