HomeMy WebLinkAboutThe Cove - Underground Storage - Treatment Plant Layout - Sections & Profile 004N
r—
M
2112 11
VENT PIPE'
a
EXPLOSION PROOF
CHEMICAL FEED PUMP
1" METHANOL
�—FEED LINE
ni
G" PVC TO SIPHON CHAMBER
PLANT LAYOUT
GENERAL NOTES:
THIS UIDERGRGUND TANK INSTALLATION SHALL COMPLY WITH ALL APPLICABLE'
:;
REGULATIOiIS, ALL REQUIREMENTS OF FEDERAL, STATE AIID LOCAL CODES
i) 1•IETHANOL STORAGE TANK SHALL BE DOUBLE WALL FIBERGLASS WITH THE FGLLG�,;I:rG
i ICLUDIiIG, BUT NOT LIMITED TO, OSHA.
FEATURES :
�)
;
4THE CONTRACTOR SHALL COi`1PLY WITH ALL 'APPLICABLE CODES AND REGULATIOPIS,
A) IIITERSTI TIAL 1:01IITOkIIdG WITH AUDIBLE ALARA FOR LEAK DETECTION
INCLUDING OSHA STAIID�.RDS, REGARDING EXCAVATIOII. SHEET PILE SHORING SHALL
(CONTINUOUS).
BE INSTALLED IN ALL CASES WHERE. DISTANCES BETWEEN BUILDINGS* STREET
LIMES, CAPIOPIES, SIGNS, ISDS SYSTEMS OR OTHER SUCH ITF.IIS, IS LF.�° S TH7II
B) AUTOXATIC SHUT—OFF FILL TUBES FOR OVER FILL PkOTECTI0i1. EACH TILL
10'. SHEET PILE SHORING SHALL ALSO BE REQUIRED WHERE SOIL 'rATERIALS AND
SHALL ALSO BE EQUIPPED WITH 25 GALLON SECONDARY CONTAINMENT :iAI1IIGLE.
COi:DIT'IOiIS ARE SUCH i HAT SGLL STt,BILIZATION DURING EXCAVATION AND TANK
INST.L�ATION IS DETERMINED BY THE OWIIER'S ENGINEER TO BE CRITICAL WITH
C) iAiIUFACTUF(ER' S LABEL NOTING MANUFACTURER, EANUFAC T URE YEAR,
RESPECT 0 CGirSTITGTITIG A DANGER 'j'0 EXISTING STRUCTURES OR PERSONS.
DI TENSIONS/CAPACITY.
D) WEAR PLATES SHALL BE LOCATED UNDER EACH TANK OPENING, PLATES TO BE i0
TANK IPISTALLATIOId )ZEQUIkEMEIITS_
GAUGE, 12" X 12" STEEL.
i) THE DISCOVERY Or Ai1Y SPILL OR DISCHAP.GE DURIIIG EXCAVATION I•IUST BE
BE AIR TESTED 014 THE JOB SITE WITH A 5 PSI PRESSURE TEST
REPORTED TO THE PROPER STATE AILD FEDERAL AGENCY AND THF LOCAL FIRE
E), TA1Ii", SHALL
Oi; THE INNER', AND OUTER WALL. TANK. SHALL BE CERTIFIED ARID WARRtINTED
: AkSHAL' S OFFICE.
by THE 1_"'JUFACTURER.
UPOir ?: ACE;IEIJT OF THE TANK, THE LOCAL FIRE MARSHAL SHALL BE NOTIFIED I'iI
F') UJTFR '.BALL `'HALL BE ALL FIBERGLASS ':idD COVER THE E1ITIi E '?=.i.}:.
✓
SUF F ICIEiIT TIE (1IiII1iU'.i 2 = HOURS) TO VERIFY THE "IN—GROUIID" AIR TEST
PRESSURE. (PF<EiER. PIPIIIG
:,ESULTS BY WITNESSING THE BLOB OFF OF THE TEST
2) ALL PRODUCT PIPI1iG� SHALL BE SECGrdDARiLY COiITAIIIED FTbERGLaSS PIP==�
:' :ST DOhc: AT' E TI`IE) .
P_PIiIG, LIiIEI;. AID OUTER SH LL BF. Pui?SSUiRE TESTED WI :1 S
= ' ___ FR.AL VUST BL C.= APPROVED TYPE IN ACCORDAiICE TdITH
NOT SPECIFICALLY
iAiIUE':CTL'kER' SPECIFICATION. Airy SUBSTITUTE: _MATERIAL
hAl ' H' V_. B 1 : LGA'i V.',LVE I., C) .ii._ .'f�ii};
Sm I'd WRITTEN VERIFICATION FRO! TA1rK COIPAi'd1' _l� ,Y
� PPROVED .1U SH T 'CLUDI IG Al'
_ . _.,
i` PIP A
°PECI'.LIZED FACTORY TRRIIII11C. (USE OF SAI1D) .
P:<0:1 :='Gk Iii. 'iDIC P1 ES L-.=' T.' ;'� t;" H, •Ji
) THE 111STALLATION SHALL BE REPORTED WITHIN 30 DAYS OF THE INSTi1LLATIOi1 IN
! :" 11;;5 i{1.1,?: i? .
!1RITIiIG TO THE STATE AUTHORITY OII PROPER FORTIS WITH A COPY SEAT TO THE,,
LOCAL FIRE aiARSHAL'S OFFICE AS REQUIRED BY STATE REGULATIONS.
iJTI'Ci(<._.LY . ..K rOUl i�v 1 j G�i��i t(L`_i 1:{ �I: _1IIU N
r H .1- 11, DL.'.` "F �_�,:-!�?�� ._ ll '1'_! c:11 .,Erik-. PAII."�.
_itr�, vl, !'/1� LJi _(;I.`t.. i i [CVP 0Sr-� !_. •
'TOPOGRA?j;_1CAi, IiI ORj•:ATI0i� DE=IC;r�
OTHER DRAhINGS FURNISHED BY THE OWNER.
INV IN
EL. 25.15
CO1fi'kACTOR SHALL CONTACT DIG—SAFE PRIOR TO Ali Y CONSTRUCTION
I'HE.
EXCAVATION.
EQUALIZATION TANK
INV —0.05 VARIES
I
SECTION "A -A11
SECTION "B - B"
BACKFILL AND
COMPACT COARSE
BEDDING
't
f�
fT.
PIPE RAIL
FLOW METER,
GRATING
ENTIRE TOP OF FILTER WALK AY
6" PVC II II PIPE
�— IL-2" SCUM RETURN RAIL t
s
TERTIARY FILTER 2" III MECHANICAL
( CLARIFIER '
FIN. FL. 20. S _ _ _ _ III_ _ '4p
FIN. GRADE 20.0 .¢"
J -------_ -- ----- —
� I
SMH 4" Ir-3"SLIUDGE RETURN
1 METHANOL
INV I .32
FEED LINE EL. 15.0
TTO SEPTIC TANK N91 LLLJ
L_ JJ 2' x 2' x 2`
SUMP PUMP PIT
SECTION " C—C"
k-UIN I H`' I vrN CLARIFIER TERTIARY FILTER
BOX
HYDRAULIC PROFILE
N. T. S.
LEACHING
TRENCHES
ASoBUILT FIELD MEASUREMENTS: 1o28o8
■