Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Cape Oil Delivery- Site Layout003
5CCOncl. Tan14 Cornpg4 lash, Por- - 9•�'� / LIST ofQUlIoAIr=NT TO r5E SUPPL/EI;) 15Y 01~rlUE1� 3. / 11, 75 1 Fu4wre 1• 2 -8,000 Gal. Double- Wall 5T)P- 3 Steel Tanks u i 1 TrQ5 h 5 r&r 4 SRpf"0 Conn (By Owner) - 7, 2-C�, UUO Got, t)ouhle -Wall STIR -3 54eel Tonks l 14tAc r I 1 Veecler �oo4 probe gilt I"x %�' Gro4cn CD'e of qq 3. t - 510 Gol, 5r'n le -u/oll 54eel Tank W Two Cradles A14gcherJ L F Kern + Frl1 Ser�rofec�' 13ear/rl'c 134rs e! _ -� 4. I -Vicener Roo4 Tonk '1�tc�na � n S s4e omh 4�� � rr;��r-glos nr j�e Fr�/1 � I �--�-- ---- � C'rr �: -� rn G l e ie lYtode l 1�l T� 5 - 2 5 0 L I .� 1: rs Co c 4 9 y J W r -/G 5 ecoo Cor 4. a x f. A h ` (Or E qua l -�-15 cio , , �� xu 5. At! Exferror Island And Are4' 11 h• Urea s As Re urr ' 00 �, 0� s 9 q cd r h G 7, rac-�o s, n a 1, �� _ � , f �' _ -: : Responsthle For Nook -Un And Elec4rrcal 5ervrce Feeelers, o (' �'� t �' S e Cc, t ��' ► I �r , Air e V u • Q Tow r And ac um Llni4 S ser»s, v • Prem w L. �9 Gas 1=r 11 7. 1Vlocir>crercq-f tons QF Exrsfrnq l�cspen ser5 76 Meed S�Q e 1/opor Recover „M1 Xv rr, Re urnen-is Added Hose Gonnec-�rons AndlUe Co-AxialNoses, y 510 Gat Y 0�, 5 a, -- NoT� 111Lp� �• _ . _ / V1 RIO T �e \ �, _ W0. Tran k - a � �� -. -: _ All 54eeC � 4 Slruc-�urq,? NJem�oers �' e Wit- O X- F � To Have One 1 Prcme Tw© ��� All Other E ur menf And Maerrals re T Be - Frnr � • 1 4 4 � A o f urntshec1(And lns, alted c, n, �, l sh Goads a� -Good Qucr,r, u J ,,I I , , 5y CONTI2,ACT01; � I� ► / 1 ,olprng Enamel nQrn 1 � _ 4 Reg. U 1. (5a,5 _Remove Exrs. ,Gone. Replace n L` Er 11 W/ New gein� Conc, Slab Af r ' - Some Eleva4 on As 1�lesel NJ lkero Islong, h ?slant! Arco Lr'ghfIL 0 Uhservafion well S ch 40 54ce1 ` C M t-- GENERAL NOTES r 2rr4 To t") Vern4 1?rser ,y o u XQIo en Qj ou4door• Quar- 'z � C5 q 1. The indicated water main service is from drawings furnished 2 Ct;1Jer lass Ven• p X 1 S T )IVC 9 h T b owne e shed • � 9 7 4FF10E l3UlC.1?11`:lC� looa'r ,�� Qver Ren�o-�e v� ►n~` byowner. The location is to be verified by the contractor with the local water department, and adequate Man Area (A� Fov e) I �' Q � � q care taken --•�" -i- J '�'� to protect it during construction operations. Contractor shall contact "Dig -Safe Center" prior to any excavation operations, to safe guard all other underground utilities which may exist. j 2. All work shall be performed in accordance with Tank and • - Piping Manufacturer's Installation instructions - 3 V \,. and a Conn, �_ 4` �' applicable codes. QOQ t✓�a� �C ` W �. 1 3. As a general rule, no piping shall cross over tanks. _� e�� �, `�< 4. Vent Risers shall be a minimum of 16'high or 18" above a Ty r 0. v r'f. Cone, roof lines. _ 1 C o V IEj S. All product piping shall be steel and double-wall as indicated. � 1 �-0vePI�en, ` Secondary piping shall be fiberglass to satisfy the non- X corrodible material requirement. Vapor and vent piping is to be -single -walled -fiberglass, unless otherwise indicated. �� Bch 40 54eel ., Veeder !3 0 ' % 6. Product,- vapor and vent piping is to slope toward tank at ~� 2" Tr,n h Ven•1 Riser's per, foot. -=- � X s1, Te eohone To Remarn !' ( (N1rr7 ICo Nrgh� / (Tqp, OF 8� 7. A 2�, x 30" i flexible underground piping connector (Teleflex �, Arr Tower- �°` , ¢ sparge Cann, � � 9,0 — >- 15I4nCi 35r j f � #60-10476 with'anode, or equal) shall be installed under VQcuum 1.•!n►• dispensers in accordance with manufacturer's instructions. , ► 2 ! . O I ! 2 �� ¢FIG Ven 4 s �! Seco )c 7Qnt,� C m ar ► -� emergency pump shut-off switch shall be provided, as f7 � An emer enc lnS[�. �'4r required. / ' N t 9.' All underground tanks shall be set level, with the same Edge 4F 13r:- nc, � 1�1 1, /j/ / Do 5econdor' .1 top of tank elevation. y Tonle, Comhar�men lhspec4ron Por, , 0 , // CC 10. No"bleed hold shall exist on the float vent, for the vapor Co4hoclic Pro�ec4iorn MOni•t Or• S7p410n return line. S11.)E WAL.k 11. Fill and vent boxes are to be set 1" above grade with a ` '•Q smooth surface transition to t Eclac OJ (3rd', Cone, prevent water flow into boxes. C,R Morn144r ( 1® 6hser V(3410n Welt 12 . The instal s t a 1 I i n contractor n t r a c t o r � � g shall be duly certified as a tank �+ Ohserva->tron mel( i nsta I ter, per plass. 527 Cl',1R 9.10`, and further certify. that Q-'IFrI� �2rrtJep�h� the Underground Storage Tank :Sys tem is installed i n accordance 4 V'a or with .Part 280 of Title 40 of the Code of Federal Regulations for Underground Storage; Systems. The method of Release �C.(;, v) v .��► Dr�� .,0' VEecl r Rood Probe Detection'is interstitial monitoring with inventory controls. ► j 2"d , i -her iu55_ 54u'er,00r- 1 i 1e �sl htem, `Gasolr'nE • ELECTRICAL NOTES: Ul+ �uQl Srrq r, o c�' Ges. 1. (Contractor- furnish 3/4" 0 Rigid Conduit run from Office Bldg. to each tank's 1 r 1r) annular Space hydro -carbon sensor, with similar conduit provisions for each tank.' s ma em;' inclusive of all electrical work. Contractor shall provide automat' management system; 1 lir 1=11JeN u all conduit .and electrical work pertaining to the location of hydro -carbon sensors at each I REQ l'rEl?7 W f / �lG�l tank's Total:Containment Manhold Structures. He shall also provide rigid conduits and �}) UL UL F, C3 JEGOne,or 1Dr�IDlnC� s electrical work pertaining to all indicated product hose dispensers, yard lighting, the e % \ Tes4 Cor -;n indicated vacuum & air tower units, and other herein described equipment. _ 1- ,• 2. Two (2) 1" 0 Rigid Conduit runs shall be provided to the new dispenser island for _possible _ 2,r c��e'G.Q�S ( Y future canopy and automatic maketing system utilization. Tn addition; provide a 1 QJ 1 Rigid Conduit Loo run from the observation wells to the building. W ! — 15 land ArCc? L1C31-?4 (Ouaf g p g• (� �► h� 14. I �lt h 5� ee 1 �' 3. The Contractor shall be _responsible for the hook-up and installation of each tank's Setonc,• ,roto I 9 9 _ - g j \ cathodic prorecyon system; with proper setting of the PPI Test Monitor Stations and related grade manhole units. Upon completion of this work, the s ked and certified as operationally satisfactory by a qualified Cathod c '610,04V!Ea �1 technician. Fiherc�lpsS Vers+ Y ,�JUN 2 5 19 3". Fi'herglas s 54a9c zL Mani 1~,otd i HEI�LTHDEPT. �� o ___ ___ - _ !a' j 2 t % � fir► n-�-' REVISIONS -CAPE OIL DELIVERY, INC. ` 256 OLD MAIN STREET Y SOUTH YARMOUTH, MASS. NO. DESCRIPTION DATE I Retn.Fr4 Diesel br'sp, 2120J89 31Z4�Q9 S I T'E LAYOUT 2 EMO D>AArNS PY y REV. POSITIVE LIWTiNG BARRIEIg5 313018qOF ZN ��'' y � G� (MAN '4 #10744 ti SGISTEV' ��G�I� NAL � t G,v►I• �. �v.�e�,�. ENGINEERING EAST INC. PEMBROKE MASS. 4 FINAL, DESIG►J UPDATE 212 190 5FINAL DESIGN UPDATE 3 10190 CD F1NAt'DESIGN UPDATE 312Q90 DRAWN : A. F. D. SCALE I " = 4' JOB NO. 90-011 7 NEW TANK LOG. &IIS190 $ P�P1NCa RS\4151gth\S (9#h1!90Sb CHECKED: R.W.R DATE: FEB. 1990 DWG. NO. 2 of 5 ___ ___ - _ !a' j 2 t % � fir► n-�-'