Loading...
HomeMy WebLinkAboutDrawing X-3085 Rev2 - 1973Wnye h o u,5e* /,r Cz )77 e- f, Cove Y- U CZ 11 t 0 MeChCV?1'C-5 Found),Y 0 6.0 q- V h t to r, 2 (7 s C� 1, -7 YY /-', r / C cz n J r a,,- 4"C-1. In /e t 4' Out Z -?v --0 -Tr)v EiL:30`10" `"& ? a I1 e r, c h m, c z rX El. =33" (N. W 5/de of Rim) 't -n 5L'C. T 10 N T��Iii U 0r b 7 N B U L Ll BOX Scale. P%`0- X 5 P C - Finished rgde (- 33'-35 1 Sanitary Notes: 1.) Percolation Test Data: Taken at elevation 30'-0" in approximate center of field. Rate = 1" in I min. Date: 10-18-73. 2.) Boring taken northeasterly of center of field indicated silty S/Ope fill @ sand from 0" to 18" and clean medium to coarse sand' from 18" to 9611 -50 3.) Sanitary Leaching Design Data: e -o f x s t8- G ro und i a.) Leaching Bed requiresl sq. ft. per gallon as'per State Sanitary Code - Article X]... z b.) Office Building with 270 people @ 15 G.P.D. = 4050 Gal. c.) 4050 Gallons x 1.00 S.F./Gal. = 4050 S.F.: d.) Actual area 81 x 48, 3888 S.F. fill General Contractor Notes: 6 r to G rL? dg, C IV e W Thick 0 1/1'" WC -1 5 h Cd 5 -6 0 n,.Q L e cz c 3 u rt,7, c c Le vc, / @ f V tE� U-1 ro t (4 fx:5f,,- 6-1- t' Cc,, EX-Stg- J' ----CI71p out 17 C=6' Dosirl,;� �'ho,--bey-1 e r/ L -a e Lu cor'crft f 5 if, - L,7uid Leve I -30'- /0 4 L J 4 L Ir, V. L_ _ KeLu C h L; P- Y, PJ e L(, C. T 1--1 - Alew 7 Guz'let L)/3 t X 0- V, + — fl. 33 L Ir 5 e e- )Vz.&�A. Uu X- 66 t —Edge of Al,? Lu Ze,2chin,- 3e -d Cove,( �o Gycd. !D MOM t 4, 4F1,32-3 + -4EI32-6 11, t-1. 33'- 4:1 El. 3S- 41 —El. 3'- 4 f L 0 .3 I z 1 1 t t cot + I 7 T 9C C� le Y2 I 2i 2 4 4 I T t I j -L 1.32 3' 3 2)"-5 El 33-2" 5/ 33-Z' —+' Vent U -);m 180*,E/boa';S Ve Yr 42-' 0 Irl El 30 6 8` 0 il-1v PIAN a 7co P C) f ct: d /-c zf 35' 7 /Raise a r ho /e /7��C Io --1 35-10f�Ir fe-uye.D I " Wit. sz I of tC- A /Q 0 Ye Y- Y-" C/C 4e et: f 2 0u /-? " ft 30-6 0 v 3 C h K V/Q v 4- 4. 0 E�E i. L) specifications. The general intent of this con -tract. is To remove, within the work area the existing tile field and replace it with plastic pipe, New Remove existing 6" C.I. from pumping chamber to dist, box and TOOO# strength (as per-A.S Method) as shown T.M.-3 Edge Bearing DRAWN C. I DATE/o/24/7j replace with new 4" c.I. pipe. on this drawing. All work to be in strict accordance with the Doubic The existing distribution box will be removed and replaced with State Sanitary Code - Article X1 and local codes. 2.) The existing dosing chamber is to be altered, as per this plan, --Y 0 / Jct / 6 A dd- / -<'.C. t;, 6 1171773 - -3 'Neui '14 wc,� h 0- d 5t0; i and will in effect serve as additional septic tank capacity. model #-ST-DB-8 manufactured by Mattapoisett Concrete Forms, Inc. SCALE z 3.) The new pumping chamber will be as per plan and equivalent to S. Yarmouth, Massachusetts, or approved equal. BOYDCO Model 203 A, Boydco, Inc., P.O. Box 4799, E. Providence, L? J Rhode Island, or approved equal, as further described in job Within the work limits, excavate clean material to elevation 7co P C) f ct: d /-c zf 35' 7 /Raise a r ho /e /7��C Io --1 35-10f�Ir fe-uye.D I " Wit. sz I of tC- A /Q 0 Ye Y- Y-" C/C 4e et: f 2 0u /-? " ft 30-6 0 v 3 C h K V/Q v 4- 4. 0 E�E i. L) Legend: ----- -- Double Perforated Pipe Non Perforated Pipe Edge of New Leaching Bed & Approx. Excavation Limits Edge of Existing Tile Field + Existing Grades 0 New Grades Is NZ V /'xfPT6Ri) GAS I �Q Z 7, C611, C A V WE YA R 0 ZO V s at'i fi YAPMOUFH sEt=VICE C E /V FE R, R 4-'-PZA C L P! LEN T Of- LA C 1VG F1 0 specifications. NEGEA SERVICE CORPORATION CAMBRIDGE, MASS, 4.) Remove existing 6" C.I. from pumping chamber to dist, box and DRAWN C. I DATE/o/24/7j replace with new 4" c.I. pipe. JAPPR. 14�71,41 5. The existing distribution box will be removed and replaced with P0,177 P 0 1�, J --Y 0 / Jct / 6 A dd- / -<'.C. t;, 6 1171773 - a new 7outlet box as per plan. Distribution box to be as model #-ST-DB-8 manufactured by Mattapoisett Concrete Forms, Inc. SCALE z DRAWING NO. Rev. 7 S. Yarmouth, Massachusetts, or approved equal. X- 3085 6.) Within the work limits, excavate clean material to elevation 291-0" + and stockpile at southerly end of the work area. 7.) From elevation 291-0"+ excavate contaminated material and old is the pipes to elevation 26'-6" +. This material must be disposed of away from the property by this contractor. 8.) Replace'elean material (from stockpile) to work area from elevatioriv 261-6" + to elevation 30'-0", level over entire surface. 9.) Supply and install new leaching bed, as per plan, to approximate elevation 31'-2". 10.) Supply and install clean fill over leaching bed to elevations as indicated on this drawing. Pill to contain no stones larger than 6 in. Slope away from edge of leaching bed with al in,' 10 slope to match existing grades. ll.') :Electrical work to provide service to pumping chamber is not a part of this contract. 12. See reference drawings for general. location of new work. Reference Drawings: NEGEA #x-1466-2 --------- Plumbing Utility Plan NEGEA #x-1467-1 --------- Septic Tank & Details Legend: ----- -- Double Perforated Pipe Non Perforated Pipe Edge of New Leaching Bed & Approx. Excavation Limits Edge of Existing Tile Field + Existing Grades 0 New Grades Is NZ V /'xfPT6Ri) GAS I �Q Z 7, C611, C A V WE YA R 0 ZO V s at'i fi YAPMOUFH sEt=VICE C E /V FE R, R 4-'-PZA C L P! LEN T Of- LA C 1VG F1 0 NEGEA SERVICE CORPORATION CAMBRIDGE, MASS, DRAWN C. I DATE/o/24/7j CHWD.4:�761(;�,, JAPPR. 14�71,41 P0,177 P 0 1�, J --Y 0 / Jct / 6 A dd- / -<'.C. t;, 6 1171773 - NO. DESCRIPTION DATE APPR. SCALE z DRAWING NO. Rev. 7 X- 3085 REVISION UNLESS OTHERWISE NOTED