HomeMy WebLinkAboutBLD-17-005511FLOOR PLAN-
NOTES:
1.) CONTRACTOR IS TO VERIFY ALL EXISTING CONDITIONS z
& DIMENSIONS IN THE FIELD `
2.) CONTRACTOR TO VERIFY ALL INTERIOR & EXTERIOR MATERIALS,
DETAILS, & FINISHES IN THE FIELD WITH OWNER
3.) ROUGH OPENING HEAD HEIGHT OF WINDOWS AT
FIRST FLOOR TO MATCH EXISTING HOUSE
4.) ALL CONSTRUCTION TO CONFORM TO 780 CMR MASSACHUSETTS
STATE BUILDING CODE, 8TH EDITION AMENDEMENT & IRC2009
5.) 110 MPH EXPOSURE B WIND ZONE
6.) ALL SHEETS OF PLYWOOD WALL SHEATHING TO BE INSTALLED VERTICALLY,
OR HORIZONTALLY W/ BLOCKING AT EDGES, 3"EDGE/12" FIELD NAILING
7.) ALL LVL LUMBER/BEAMS TO BE 1.9e L/360 LOAD
8.) SEE CERTIFIED PLOT PLAN FOR ALL
PROPOSED & EXISTING DETAILS
9.) FOLLOW ALL MANUFACTURER'S SPECIFICATIONS FOR INSTALLATION OF
ALL SIMPSON COMPONENTS
' 10.) ALL CONCRETE USED FOR FOUNDATION WALLS, FOOTINGS & SLABS
TO BE 3000 PSI
11.) VERIFY ALL PLUMBING & ELECTRICAL DETAILS W/ OWNERS ON THE SITE
DURING FRAMING CONSTRUCTION
12.) TIMBER FRAMING TO BE SPRUCE/PINE/FIR NO. 2 GRADE
13.) ALL HEADERS LESS THAN 4'0" TO BE 2- 2 x 6's UNLESS OTHERWISE NOTED
14.) FOLLOW ALL REQUIREMENTS OF THE IECC2015 RESIDENTIAL ENERGY
EFFICIENCY REQUIREMENTS & VERIFY ALL DETAILS WITH THE INSULATION
INSTALLER/CONTRACTOR.
CLIMATE ZONE 5 (USE EITHER PRESCRIPTIVE VALUES OR RESCHECK CALCULATION
Fo
FENESTRATION
U -FACTOR
rn
EXIST.
i�
FLOOR
R -VALUE
BASEMENT WALL
R -VALUE
i
1
CRAWL SPACE WALL
R -VALUE
115119
0.32
0.55
EXIST.
cp
A
M
A2
WALL FRAMING
LIVING
TOP PLATES AT INTERSECTIONS (FACE NAILED)
EXIST.
5-16d
AT JOINTS
STUD TO STUD (FACE NAILED)
DINING
2-16d
A2
GARAGE
16d
16d
16" o.c. ALONG EDGES
FLOOR FRAMING:
si
JOIST TO SILL, TOP PLATE OR GIRDER (TOE NAILED)
EXIST. 8'0" SLIDING DOOR
P.T. 2 x
10's
16" D.C.
2-8d
=#
— — — — — — —
4'0" x 6'8"
----------------------
FLAT CEILING TO MATCH
A
4-16d
EACH BLOCK
A
3-16d
BIFOLD
EXISTING HOUSE
JOIST ON LEDGER TO BEAM (TOE NAILED)
3-8d
3-1Od
A2
STAC
3-16d
4-16d
PER JOIST
BAND JOIST TO SILL OR TOP PLATE (TOE NAILEDO
2- 16 d
3- 16d
W/D
ROOF SHEATHING
50" x 60"
WOOD STRUCTURAL PANELS (PLYWOOD)
RAFTERS OR TRUSSES SPACED UP TO 16" o.c.
WINDOW
10d
6" EDGE/6" FIELD
0
3'-4"
10d
4" EDGE/4" FIELD
GABLE END WALL RAKE OR RAKE TRUSS W/O OVERHANG
8d
10d
ZN
GABLE END WALL RAKE OR RAKE TRUSS
6d
10d
6" EDGE/6" FIELD
W/ STRUCTURAL OUTLOOKERS
1,0„ x 6$„
r
NEW
1,0„ x 6$„
4" EDGE/4" FIELD
T. A 10 BEA
FIXED PANEL
3,4,
SUN ROOM
FIXED PANEL
—
7" EDGE/10" FIELD
a�
in
6'0"x 68"
(CATHEDRAL CEILING)
60" x 68"
SLDING
8d
10d
SLDING
1/2" & 25/32" FIBERBOARD PANELS
8d
—
DOOR
1/2" GYPSUM WALLBOARD
5d COOLERS
DOOR
7" EDGE/10" FIELD
FLOOR SHEATHING
co
B
WOOD STRUCTURAL PANELS (PLYWOOD)
B
2 x
10 B AM
1" OR LESS THICKNESS
A2
10d
6" EDGE/12" FIELD
A2
10d
J
o
1,0., , 6,8��
FIXED PANEL
9" 9"
1,0„ x 6.8.,
FIXED PANEL
CV
cp
2'0" x 57"
4'4" x 57"
70" x 57"
CASEMENT
CASEMENT
CASEMENT
bo
4'4" x 22"
B
HALF ROUND
B
ABOVE
A2
TT'
T-10 1/2" 3'-10 1/2"
T-7"
14,4„
14'-11"t
FLOOR PLAN-
NOTES:
1.) CONTRACTOR IS TO VERIFY ALL EXISTING CONDITIONS z
& DIMENSIONS IN THE FIELD `
2.) CONTRACTOR TO VERIFY ALL INTERIOR & EXTERIOR MATERIALS,
DETAILS, & FINISHES IN THE FIELD WITH OWNER
3.) ROUGH OPENING HEAD HEIGHT OF WINDOWS AT
FIRST FLOOR TO MATCH EXISTING HOUSE
4.) ALL CONSTRUCTION TO CONFORM TO 780 CMR MASSACHUSETTS
STATE BUILDING CODE, 8TH EDITION AMENDEMENT & IRC2009
5.) 110 MPH EXPOSURE B WIND ZONE
6.) ALL SHEETS OF PLYWOOD WALL SHEATHING TO BE INSTALLED VERTICALLY,
OR HORIZONTALLY W/ BLOCKING AT EDGES, 3"EDGE/12" FIELD NAILING
7.) ALL LVL LUMBER/BEAMS TO BE 1.9e L/360 LOAD
8.) SEE CERTIFIED PLOT PLAN FOR ALL
PROPOSED & EXISTING DETAILS
9.) FOLLOW ALL MANUFACTURER'S SPECIFICATIONS FOR INSTALLATION OF
ALL SIMPSON COMPONENTS
' 10.) ALL CONCRETE USED FOR FOUNDATION WALLS, FOOTINGS & SLABS
TO BE 3000 PSI
11.) VERIFY ALL PLUMBING & ELECTRICAL DETAILS W/ OWNERS ON THE SITE
DURING FRAMING CONSTRUCTION
12.) TIMBER FRAMING TO BE SPRUCE/PINE/FIR NO. 2 GRADE
13.) ALL HEADERS LESS THAN 4'0" TO BE 2- 2 x 6's UNLESS OTHERWISE NOTED
14.) FOLLOW ALL REQUIREMENTS OF THE IECC2015 RESIDENTIAL ENERGY
EFFICIENCY REQUIREMENTS & VERIFY ALL DETAILS WITH THE INSULATION
INSTALLER/CONTRACTOR.
0
N
SEE ELEVATION PLANS
DEVELOPED BY CAPIZZI
HOME IMPROVEMENT FOR
EXTERIOR DETAILS, SHTS. A1,2,3,4
A CERTIFIED AS BUILT IS REQUIRED
BEFORE FINAL INSPECTION
FILE COPY
P.T. 2 x 10 LEDGER BOARD SCREWED TO
SOUD 1BLOCKING W/ JOIS S H NGERS ERLOK SCREWS
6' o.c EXIST.
EXIST. BASEMENT
GARAGE
A
CLIMATE ZONE 5 (USE EITHER PRESCRIPTIVE VALUES OR RESCHECK CALCULATION
Fo
FENESTRATION
U -FACTOR
rn
CEILING
R -VALUE
i�
FLOOR
R -VALUE
BASEMENT WALL
R -VALUE
i
1
CRAWL SPACE WALL
R -VALUE
115119
0.32
0.55
T
cp
A
M
A2
0
N
SEE ELEVATION PLANS
DEVELOPED BY CAPIZZI
HOME IMPROVEMENT FOR
EXTERIOR DETAILS, SHTS. A1,2,3,4
A CERTIFIED AS BUILT IS REQUIRED
BEFORE FINAL INSPECTION
FILE COPY
P.T. 2 x 10 LEDGER BOARD SCREWED TO
SOUD 1BLOCKING W/ JOIS S H NGERS ERLOK SCREWS
6' o.c EXIST.
EXIST. BASEMENT
GARAGE
A
CLIMATE ZONE 5 (USE EITHER PRESCRIPTIVE VALUES OR RESCHECK CALCULATION
TABLE 402.1.2 (MINIMUM PRESCRIPTIVE INSULATION & FENESTRATION REQUIREMENTS)
FENESTRATION
U -FACTOR
SKYLIGHT
U -FACTOR
CEILING
R -VALUE
WOOD FRAMED WALL
R -VALUE
FLOOR
R -VALUE
BASEMENT WALL
R -VALUE
BASEMENT SLAB
R -VALUE
110(4FT.DEEP)
CRAWL SPACE WALL
R -VALUE
115119
0.32
0.55
49
20 or 13 + 5
A
15/19
A2
WALL FRAMING
-0
TOP PLATES AT INTERSECTIONS (FACE NAILED)
4-16d
5-16d
AT JOINTS
STUD TO STUD (FACE NAILED)
2- 16 d
2-16d
A2
HEADER TO HEADER (FACE NAILED)
16d
16d
16" o.c. ALONG EDGES
FLOOR FRAMING:
si
JOIST TO SILL, TOP PLATE OR GIRDER (TOE NAILED)
4-8d
P.T. 2 x
10's
16" D.C.
2-8d
2-10d
EACH END
BLOCKING TO SILL OR TOP PLATE (TOE NAILED)
3-16d
4-16d
EACH BLOCK
LEDGER STRIP TO BEAM OR GIRDER (FACE NAILED)
3-16d
4-16d
EACH JOIST
JOIST ON LEDGER TO BEAM (TOE NAILED)
3-8d
3-1Od
W/ MID -SPAN BLOCKING
BAND JOIST TO JOIST (END NAILED)
3-16d
4-16d
PER JOIST
BAND JOIST TO SILL OR TOP PLATE (TOE NAILEDO
2- 16 d
3- 16d
PER FOOT
ROOF SHEATHING
WOOD STRUCTURAL PANELS (PLYWOOD)
RAFTERS OR TRUSSES SPACED UP TO 16" o.c.
8d
10d
6" EDGE/6" FIELD
RAFTERS OR TRUSSES SPACED OVER 16" o.c.
8d
10d
4" EDGE/4" FIELD
GABLE END WALL RAKE OR RAKE TRUSS W/O OVERHANG
8d
10d
6" EDGE/6" FIELD
GABLE END WALL RAKE OR RAKE TRUSS
6d
10d
6" EDGE/6" FIELD
W/ STRUCTURAL OUTLOOKERS
r
8d
10d
4" EDGE/4" FIELD
T. A 10 BEA
3,4,
GYPSUM WALLBOARD
5d COOLERS
—
7" EDGE/10" FIELD
WALL SHEATHING:
WOOD STRUCTURAL PANELS (PLYWOOD)—
CV
8d
10d
3" EDGE/12" FIELD
1/2" & 25/32" FIBERBOARD PANELS
8d
—
3" EDGE/6' FIELD
1/2" GYPSUM WALLBOARD
5d COOLERS
7" EDGE/10" FIELD
FLOOR SHEATHING
WOOD STRUCTURAL PANELS (PLYWOOD)
3- P.T.
2 x
10 B AM
1" OR LESS THICKNESS
8d
10d
6" EDGE/12" FIELD
GREATER THAN V THICKNESS
10d
J
io
cp
zo
bo
B
B
A2
A2
�
1
NEW 10" DIA. CONCRETE SONOTUBES
W/ 24" DIA. BIGFOOT FOOTINGS UNDER-
NEATH TO 4'0" BELOW GRADE. USE
SIMPSON ABU66 POST BASE
CENTERLINE OF BEAM TO BE
AT CENTERLINE OF PIER
TOWN OF YARMOUTH
REVIEWED FOR BUILDING AND ZONING CODE COMPLI-
ANCE, ERRORS OR OMMISSIONS DO NOT RELIEVE THE
APPLICANT FROM THE RESPONSIBILITY CR'AS BUILT'
COMPLIANCE.
DATES
T
BUfLDING FFI IAL
IECC2015 RESIDENTIAL ENERGY EFFICIENCY DETAILS
CLIMATE ZONE 5 (USE EITHER PRESCRIPTIVE VALUES OR RESCHECK CALCULATION
TABLE 402.1.2 (MINIMUM PRESCRIPTIVE INSULATION & FENESTRATION REQUIREMENTS)
FENESTRATION
U -FACTOR
SKYLIGHT
U -FACTOR
CEILING
R -VALUE
WOOD FRAMED WALL
R -VALUE
FLOOR
R -VALUE
BASEMENT WALL
R -VALUE
BASEMENT SLAB
R -VALUE
110(4FT.DEEP)
CRAWL SPACE WALL
R -VALUE
115119
0.32
0.55
49
20 or 13 + 5
30
15/19
EACH END
WALL FRAMING
NOTES:
1. R -VALUES ARE MINIMUMS & U -FACTORS ARE MAXIMUMS.
2.15/19 MEANS R=15 CONTINUOUS INSULATED SHEATHING ON THE INTERIOR OR EXTERIOR
OF THE HOME OR R=19 INSULATION CAVITY AT THE INTERIOR OF THE BASEMENT WALL
3. REFER TO IECC 2015 CHAPTER 4 FOR ALL INSULATION & ENERGY REQUIREMENTS
4.13 + 5 MEANS R5 CONTINUOUS INSULATED SHEATHING ON THE WALL EXTERIOR
& R13 CAVITY INSULATION
3- P.T. 2 x 10 BEAM
T-5 1/2" t
FOOTING/F
T-5 1/2" FASTEN JOISTS TO BEAMS
W/ SIMPSON H2.5 A TIES
AT ALL BEAMS
RAMING PLAN_
NAILING SCHEDULE
110 MPH EXPOSURE B WIND ZONE
JOINT DESCRIPTION
NO. OF COMMON NAILS
NO. OF BOX NAILS
NAIL SPACING
ROOF FRAMING:
0CVOILO -A
THESE DRAWINGS PRIOR TO START OF
BLOCKING TO RAFTER (TOE NAILED)
2- 8d
2- 10d
EACH END
RIM BOARD TO RAFTER (END NAILED)
2- 16 d
3- 16d
EACH END
WALL FRAMING
-0
TOP PLATES AT INTERSECTIONS (FACE NAILED)
4-16d
5-16d
AT JOINTS
STUD TO STUD (FACE NAILED)
2- 16 d
2-16d
24" o.c.
HEADER TO HEADER (FACE NAILED)
16d
16d
16" o.c. ALONG EDGES
FLOOR FRAMING:
si
JOIST TO SILL, TOP PLATE OR GIRDER (TOE NAILED)
4-8d
4-1Od
PER JOIST
BLOCKING TO JOISTS (TOE NAILED)
2-8d
2-10d
EACH END
BLOCKING TO SILL OR TOP PLATE (TOE NAILED)
3-16d
4-16d
EACH BLOCK
LEDGER STRIP TO BEAM OR GIRDER (FACE NAILED)
3-16d
4-16d
EACH JOIST
JOIST ON LEDGER TO BEAM (TOE NAILED)
3-8d
3-1Od
PER JOIST
BAND JOIST TO JOIST (END NAILED)
3-16d
4-16d
PER JOIST
BAND JOIST TO SILL OR TOP PLATE (TOE NAILEDO
2- 16 d
3- 16d
PER FOOT
ROOF SHEATHING
WOOD STRUCTURAL PANELS (PLYWOOD)
RAFTERS OR TRUSSES SPACED UP TO 16" o.c.
8d
10d
6" EDGE/6" FIELD
RAFTERS OR TRUSSES SPACED OVER 16" o.c.
8d
10d
4" EDGE/4" FIELD
GABLE END WALL RAKE OR RAKE TRUSS W/O OVERHANG
8d
10d
6" EDGE/6" FIELD
GABLE END WALL RAKE OR RAKE TRUSS
6d
10d
6" EDGE/6" FIELD
W/ STRUCTURAL OUTLOOKERS
GABLE END WALL RAKE OR RAKE TRUSS W/ LOOKOUT BLOCKS
8d
10d
4" EDGE/4" FIELD
CEILING SHEATHING:
GYPSUM WALLBOARD
5d COOLERS
—
7" EDGE/10" FIELD
WALL SHEATHING:
WOOD STRUCTURAL PANELS (PLYWOOD)—
STUDS SPACED UP TO 24" O.C.
8d
10d
3" EDGE/12" FIELD
1/2" & 25/32" FIBERBOARD PANELS
8d
—
3" EDGE/6' FIELD
1/2" GYPSUM WALLBOARD
5d COOLERS
7" EDGE/10" FIELD
FLOOR SHEATHING
WOOD STRUCTURAL PANELS (PLYWOOD)
1" OR LESS THICKNESS
8d
10d
6" EDGE/12" FIELD
GREATER THAN V THICKNESS
10d
16d
6" EDGE/6" FIELD
COTUIT BAY DESIGN LLC NEW ADDITION/REMODELING FOR:
43 BREWSTER ROAD
5
649 MIDURA RESIDENCE
PH. (508)
Fnx�so� 274-1166 A�k
(508) 539-9402 15 BURNIGN TREE LANE SOUTH YARMOUTH, MA,w,,,,
OF #44
Sym
'
MICHELE yGs
THEIF
ERRORSIGNER OR OMISSIONS ARE FSHALL BEIOUND ON FIED Y
SCALE:
DRAWING NO.
0CVOILO -A
THESE DRAWINGS PRIOR TO START OF
uC.TVRAL v7
CONSTRUCTION. THE BUILDING CONTRACTOR
11 I 11
1/4 " 1
O SV
U 34774
WILL BE RESPONSIBLE FOR THE CONTENT
-0
t40 Q
A 9FGIS
IN THESE DRAWINGS IF CONSTRUCTION
COMMENCES WITHOUT NOTIFYING THE
DATE
9O �G
DESIGNER OF ANY ERRORS OR OMISSIONS.
THESE DRAWINGS ARE SOLELY FOR THE USE
OF THE OWNER NOTED. ANY OTHER USE OF
si
THESE DRAWINGS REQUIRES THE WRITTEN
CONSENT OF THE DESIGNER UNDER THE
4/19/2017
i F^' C
ARCHITECTURAL COPYRIGHT PROTECTION
ACT OF 1990.
2x10 RAF
1 1
WIND WAS
BARRIER
1 x 3 STRA
1/2" GYPSI
TYP. 2 x 4
2- 2 6 HDR. 2- 2 6 HDR.
1K,1J 2K,1J 2-2x8AM V2K,1J 1K,1J
SOLID 2 x 8 BLOCKING IN THE OUTSIDE
TWO RAFTER & CEILING JOIST BAYS 14'-11"t
@ 48" o.c., ALLOW SPACE FOR AIR
FLOW ON THE UNDERSIDE OF ROOF
SHEATHING
ROOF FRAMING PLAN
NOTES:
1.) ALL ROOF RAFTERS TO BE 2 x 10's
UNLESS OTHERWISE NOTED
2.) USE SIMPSON H2.5A HURRICANE CLIPS
AT ALL RAFTERS ENDS
3.) VERIFY GUTTER TYPE/LAYOUT
W/ OWNERS IT -
TYPICAL ASPHALT
ROOF SHINGLES
5/8" CDX PLYWOOD SHEATHING
15# FELT PAPER
SIMPSON H 2.5A HURRICANE CLIPS
3'0" WIDE ICE/WATER SHIELD
ALUMINUM DRIP EDGE
NEW FASCIA, FRIEZE, & SOFFIT BOARDS
TO MATCH EXISTING
DETAI L AT WALL
SCALE: 1/2" = l'-0"
COTUIT BAY DESIGN, LLC
43 BREWSTER ROAD
MASHPEE NA. 02649
PH. (508) 274-1166
FAX 508 539-9402
FLOOR JOISTS
4 x 4 POST FROM RIDGE DOWN
TO HEADER W/ 2K,1J POSTS UNDER
EACH END DOWN TO FLOOR BEAM {
SUBFLOOR
P.T. 2 x 10's @ 16" o.c
--t—EXIST. SLAB
INSTALL PEEELL&& STICK
RUBBER MEMBRANE
BETWEEN LEDGER &
SHEATHING
P.T. 2 x 10 LEDGER BOARD SCREWED TO
SOLID BLOCKING W/ (2) LEDGERLOK SCREWS
16" o.c. W/ JOISTS HANGERS
DECK DETAIL
2 x 4's @ 16" o.c.
MATCH 12
EXISTING
P OF PLATE (j i
FIRST FLOOR
SUBFLOOR
0
v
2-1 3/4"x9 1/4" LVL RIDGEBEAM
SIMPSON BC POST BASE
— 4 x 4 POST FROM RIDGE DOWN
TO HEADER W/ 4 x 6 POSTS UNDER
EACH END DOWN TO FLOOR BEAM
+ SIMPSON ACE4
�I I POST CAP
fl '
BALLOON FRAME GABLE
I END WALL
ISUNROOI
q.T. 2 x 10's @ 16" o.c.
SECTION @ SUNROOM
NEWAIDDIT101"No/woKEMODELING FOR:
MIDURA RESIDENCE
15 BURNIGN TREE LANE SOUTH YARMOUTH, MA
pF MAS$aCH DESIGNERTHE
ERRORSOR OMIISSIONS ARE FFOUND
OUND O
P NESE GSR THESE DRAWINGS PRIOR TO START OF SCALE: D RAVO NG NO.:M\G ,LQ �� CONSTRUCTION. THE BUILDING CONTRACTOR / 11 1 (�H
GUS WILL BE RESPONSIBLE FOR THE CONTENT 1/4 4 = 1 "�/
STt4OCQ-I1QQ w COIN MMENCDRAWINGS
THOUTNOTIFYI<NGTHEJ
DESIGNER OF ANY ERRORS OR OMISSIONS.
A9 aFGISZ�P C�� THESE DRAWINGS ARE SOLELY FOR THE USE DATE:
OF THE OWNEP. NOTED. ANY OTHER USE OF
SIONP THESE DRAWINGS REQUIRES THE WRITTEN
ONSENT OF THE DESIGNER UNDER THE 4/19/2017
RCHITECTURAL COPYRIGHT PROTECTION
r -7 t? 7/ ,, , f % ACT OF 1890
TYP. ROOF CONST.
CONT. RIDGEVENT
- 2 x 10 ROOF RAFTERS @ 16" o.c.
- 5/8" CDX PLYWOOD ROOF SHEATHING
- ASPHALT ROOF SHINGLES
-15LB. FELT PAPER
NEW ROOF TO BE
OVER EXIST.
2 x 4's @ 16" o.c. -- .— +- \
/
- SPRAY FOAM INSULATION
1" SLOPED CEILINGS (R=3$)
BUILT
- 11" BATT INSULATION
ROOF STRUCTURE
j(,f�r2J G
e 1
MATCH 12
EXISTI NG
@ FLAT CEILINGS (R=49)
ASIMPSON HURRICANE CLIPS
I (?+t f G
LLRAFTER ENDS
CUT EXIST. ROOF RAFTERS
Iit
+r'r ►nfT.
2%)
- ICE/ WATER SHIELD AT BOTTOM
FOR ACCESS INTO NEW
loor
TOP OF PLATE
MOHR P.T. 2 x 10's @ 16" o.c.
3'0" OF ROOF
- PROP -A VENT BETWEEN RAFTERS
ATTICE ABOVE SUNROOM
__ ___ _
2- 1 3/4" 7 1/4" LVL HDR.
- WIND WASH BARRIERS
-ALUMINUM IP EDGE+
`
YP. BOARD
1/2"Gx
z
ON 3 STRAPPING
ON1x3.
M �D/R�
TYP. Y 1 ALL CONST.
cn
N E`tIV
1. 2 x 4 STUDS @ 16" o.c.
t
w
p Q2.1/2"
SUN
PLYWOOD SHEATHING
_
r
o ROOM
3. (R=20) SPRAY FOAM INSULATION
m
2K,1J
I 4.1/2" GYPSUM BOARD
AC.
i
A
3/4" PLYWOOD SUBFLOOR
SHINGLE DING
6. TYPAR
A2
�
A2
GLUED & NAILED
VAPOR BIARRIER
FIRST FLOOR
in
x
X
4 x OST FROM RIDGE
SUBFLOOR
FASTEN JOISTS & WALL TO
BEAM W/ SIMPSON LSTA24
DO N TO BEAM BELOW,
�--- P.T. 2 x 10's @ 16" o.c.
I STRAPS AT 48" o.c.
NEW 2- 1 3/4"
- -
9 1/4' LVL BEAM
- - - -
2K,1J
3- GANGED STUDS UNDER
3 P.T. 2 x 10's1pffip -- --- --
- P.T. 2 x 10's
(�// y¢.,b� v-/
3,-4„
1K,1J
EACH END OF BEAM
R30 RIGID INSULATION 3
I /4" F.T. PLYWOOD
-- (( i4 r / `
A l fl X � �`�(,8
K'1
Q
o
SEAL ALL JOINTS
I
W
0 2J
LU
2J w
o
l
¢
LU
o
w
GO
Jw
�'
J
�w
10" DIA. CONCRETE SONOTUBES
o
vQ
ON 24" DIA. BIGFOOT FOOTINGS
.-w
C)
w
TO 4'0" BELOW GRADE. USE
X0o j
I X�
SIMPSON ZMAX ABU 66 POST BASE
_ x
- x
B "
N
`
B
A
SECTION @ SUNROOM
Mry
A2 2J
2J�"
A2
A2
IK,lJ
I
1K,1J
2x10 RAF
1 1
WIND WAS
BARRIER
1 x 3 STRA
1/2" GYPSI
TYP. 2 x 4
2- 2 6 HDR. 2- 2 6 HDR.
1K,1J 2K,1J 2-2x8AM V2K,1J 1K,1J
SOLID 2 x 8 BLOCKING IN THE OUTSIDE
TWO RAFTER & CEILING JOIST BAYS 14'-11"t
@ 48" o.c., ALLOW SPACE FOR AIR
FLOW ON THE UNDERSIDE OF ROOF
SHEATHING
ROOF FRAMING PLAN
NOTES:
1.) ALL ROOF RAFTERS TO BE 2 x 10's
UNLESS OTHERWISE NOTED
2.) USE SIMPSON H2.5A HURRICANE CLIPS
AT ALL RAFTERS ENDS
3.) VERIFY GUTTER TYPE/LAYOUT
W/ OWNERS IT -
TYPICAL ASPHALT
ROOF SHINGLES
5/8" CDX PLYWOOD SHEATHING
15# FELT PAPER
SIMPSON H 2.5A HURRICANE CLIPS
3'0" WIDE ICE/WATER SHIELD
ALUMINUM DRIP EDGE
NEW FASCIA, FRIEZE, & SOFFIT BOARDS
TO MATCH EXISTING
DETAI L AT WALL
SCALE: 1/2" = l'-0"
COTUIT BAY DESIGN, LLC
43 BREWSTER ROAD
MASHPEE NA. 02649
PH. (508) 274-1166
FAX 508 539-9402
FLOOR JOISTS
4 x 4 POST FROM RIDGE DOWN
TO HEADER W/ 2K,1J POSTS UNDER
EACH END DOWN TO FLOOR BEAM {
SUBFLOOR
P.T. 2 x 10's @ 16" o.c
--t—EXIST. SLAB
INSTALL PEEELL&& STICK
RUBBER MEMBRANE
BETWEEN LEDGER &
SHEATHING
P.T. 2 x 10 LEDGER BOARD SCREWED TO
SOLID BLOCKING W/ (2) LEDGERLOK SCREWS
16" o.c. W/ JOISTS HANGERS
DECK DETAIL
2 x 4's @ 16" o.c.
MATCH 12
EXISTING
P OF PLATE (j i
FIRST FLOOR
SUBFLOOR
0
v
2-1 3/4"x9 1/4" LVL RIDGEBEAM
SIMPSON BC POST BASE
— 4 x 4 POST FROM RIDGE DOWN
TO HEADER W/ 4 x 6 POSTS UNDER
EACH END DOWN TO FLOOR BEAM
+ SIMPSON ACE4
�I I POST CAP
fl '
BALLOON FRAME GABLE
I END WALL
ISUNROOI
q.T. 2 x 10's @ 16" o.c.
SECTION @ SUNROOM
NEWAIDDIT101"No/woKEMODELING FOR:
MIDURA RESIDENCE
15 BURNIGN TREE LANE SOUTH YARMOUTH, MA
pF MAS$aCH DESIGNERTHE
ERRORSOR OMIISSIONS ARE FFOUND
OUND O
P NESE GSR THESE DRAWINGS PRIOR TO START OF SCALE: D RAVO NG NO.:M\G ,LQ �� CONSTRUCTION. THE BUILDING CONTRACTOR / 11 1 (�H
GUS WILL BE RESPONSIBLE FOR THE CONTENT 1/4 4 = 1 "�/
STt4OCQ-I1QQ w COIN MMENCDRAWINGS
THOUTNOTIFYI<NGTHEJ
DESIGNER OF ANY ERRORS OR OMISSIONS.
A9 aFGISZ�P C�� THESE DRAWINGS ARE SOLELY FOR THE USE DATE:
OF THE OWNEP. NOTED. ANY OTHER USE OF
SIONP THESE DRAWINGS REQUIRES THE WRITTEN
ONSENT OF THE DESIGNER UNDER THE 4/19/2017
RCHITECTURAL COPYRIGHT PROTECTION
r -7 t? 7/ ,, , f % ACT OF 1890