HomeMy WebLinkAboutSav-On - Site Layout Plana c PROJECT cy LOCATION ROAD CRTE. p LOCUS MAP: NOT TO SCALE LEGEND SYMBOL DESCRIPTION S NEW SEWER SERVICE W- NEW WATER SERVICE --G- NEW GAS SERVICE ❑ CB EXIST. CATCH BASIN OSMH EXIST. SEWER MANHOLE 0 NEW CATCH BASIN 0 NEW MANHOLE HYDRANT EXIST. BLDG. -r-� HAYBALES )0�UP EXIST. UTILITY POLE ZEN HANDICAP RAMP F137 -PROPOSED CONTOUR LINE 1450 PROPOSED SPOT GRADE +TW GROUND WATER TEST SHRUB -elk. Existing Landscape O LP Existing Pavement EXISTING CANOPY SUPPORT COLUMN EXISTING OVERHEAD CANOPY—, k RESTORE CONCRETE ♦ CONTAINMENT PAD ` FROM PIPING AS NEEDED 0 \� / VAPOR RECOVERY .� LINE♦ / INSTALL (1) NEW MPD kAT EXISTING ISLAND UST VENT ,� ��\\ - (GAS & DIESEL) (GAS) 1 \ 9' i t \\\\ UST VENT/ \\\\ DIESEL VENT (DIESEL) x ^� LINE / DIESEL FUEL / a /, . ^ . �. n \\\ LINE I / \ GAS VENT LINE \ ate► .` : \. .. o : q � \ \\ i k F17 /\\\ / 0 c existing gravel 0. \ Existing SUPER GAS Pavement LINE CB ❑ 1/5 GENERAL NOTES TO CONTRACTOR 1. IT SHALL BE THE CONTRACTOR'S SOLE RESPONSIBILITY TO OBTAIN ANY AND ALL PERMITS REQUIRED BY THE STATE OF MASSACHUSETTS AND THE TOWN OF HYANNIS PRIOR TO COMMENCING ANY WORK. 2. THE CONTRACTOR SHALL NOTIFY DIG SAFE TO DETERMINE EXACT LOCATION OF ALL UTILITY PRIOR TO ANY EXCAVATION. 3. THE CONTRACTOR SHALL BE REPONSIBLE TO REVIEW THE CONSTRUCTION DRAWING AND TO NOTIFY THE ENGINEER WITH ANY DISCREPANCY BETWEEN THE DESIGN AND THE MANUFACTURES' REQUIREMENTS AND ALL LOCAL, STATE AND FEDERAL CODES. 4. PROPOSED UNDERGROUND STORAGE TANKS AND PUMPS SHOWN ARE SCHEMATIC ONLY. TANKS INSTALLATION, LAYOUT AND PIPE SIZING SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF THE MANUFACTURERS, THE STATE FIRE MARSHALL AND MASSACHUSETTS BOARD OF FIRE PREVENTION REGULATIONS, 527 CMR 9.00, THE FIRE SAFETY CODE AND THE LOCAL FIRE DEPARTMENT. THIS DRAWING IS NOT INTENDED TO SHOW EVERY JOINT, FITTING AND CONSTRUCTION DETAIL. 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE SECURITY AND JOB SAFETY ON THE SITE. THE CONSTRUCTION SHALL BE PERFORMED IN ACCORDANCE WITH "OSHA" AND THE LOCAL MUNICIPALITY CONSTRUCTION STANDARDS. 6. THE CONTRACTOR SHALL BE CERTIFIED BY THE MANUFATURERS TO INSTALL THE PROPOSED SYSTEM COMPONENTS IN ACCORDANCE WITH THE MANUFACTURES' REQUIREMENTS. F F+� �9 �4 �a sc 4p EXISTING CONCRETE CONTAINMENT PAD I REG. GAS LINE ❑ LP Existing Driveway S09 08' 30"E UP 221.94' -0- INSTALL HAYBALES PREVIOUS LOCATION AROUND EXIST. Existing Landscape j OF REMOVED UST'S CATCH BASIN APPROXIMATE LOCATION APPROXIMATE LOCATION OF PROPOSED 8,000 GALLON OF PROPOSED 159000 GALLON SPLIT DOUBLE WALL TANK DOUBLE WALL TANK 96" DIAM. X 25' 96" DIAM, X 45' (4k SUPER & 4k DIESEL) (REGULAR UNLEADED) P R O J E C T T I T L E P R E P A R E D B Y: PROPOSED UDERGROUND STORAGE TANKS HAL CHOUBAH, P.E. CONSULTING ENGINEER 381 CAMP STREET 2 PURPLE WING LN. HYANNIS, MA NO. DARTMOUTH, MASS 02747 110 LP EXISTING BOLLARD INSTALL (1) NEW MPD AT EXISTING ISLAND (GAS &DIESEL) Existing Pavement INSTALL (1) NEW MPD` AT EXISTING ISLAND (GAS ONLY) Existing Driveway17-1 4 'k LP ❑, LP Exist. Sign O Existing Landscape ♦ � T T�Oyy N 0 w" 0,P' YgRM♦ STge� 7yF P R E P A R E D F 0 R: HATEM ENTERPRISES 94 EAST FALMOUTH HIGHWAY FALMOUTH, MA 02540 7. PROPOSED UNDERGROUND STORAGE TANKS AND PIPING SHALL BE TESTED PER THE REQUIREMENTS OF THE MANUFACTURERS, THE STATE FIRE MARSHALL AND MASSACHUSETTS BOARD OF FIRE PREVENTION REGULATIONS, 527 CMR 9.00 PRIOR TO OPERATION. COPIES OF THE RESULTS SHALL BE SUMBITTED TO THE LOCAL FIRE DEPARTMENT AND OWNER. 8. THE CONTRACTOR SHALL CONSTRUCT A 4000 PSI, AIR ENTRAINED, REINFORCED CONCRETE PAD IN THE AREA SURROUNDING THE FUEL DISPENSING ISLAND AND OVER THE UNDERGROUND STORAGE TANKS. THE CONCRETE PAD SHALL BE SIX INCH THICH OVER 6 INCH COMPACTED GRAVEL. 9. THE CONTRACTOR SHALL BE RESPONSIBLE TO DISPOSE OF ANY UNSUITABLE OR SURPLUS MATERIALS PROPERLY OFF SITE IN ACCORDANCE WITH LOCAL AND STATE ENVIRONMENTAL CODES. 10. THE CONTRACTOR SHALL INSTALL A MONITORING SYSTEM TO DETECT ANY LEAK IN THE PRESSURIZED PIPING SYSTEM AND SHALL TEST TO NO LESS THAN 60 PSI THE PRODUCT LINES AND PRESSURE TEST THE FUEL DISPENSERS/SUMPS AND THE UNDERGROUND STORAGE TANKS, SUMPS, OUTER AND INNER WALLS PRIOR TO RESTART OF OPERATION. 11. THE CONTRACTOR SHALL NOT TERMINATE THE "VENT PIPS' FROM THE UNDERGROUND STORAGE TANKS AT THE FILLING LOCATION OF THE TANK OR FIVE FEET FROM THE OPENING OF DOORS AND WINDOWS. THE VENT PIPE SHALL BE FITTED WITH AN APPROVED WEATHER HOOD SCREEN. 12. THERE WILL BE ONE 15,000 AND ONE 8,000 GALLON DOUBLE WALL TANKS. ONE WILL CONTAIN 15,000 GALLONS OF REGULAR UNLEADED AND ONE SPLIT TANK WILL CONTAIN 4,000 GALLONS OF SUPER UNLEADED GASOLINE AND 4,000 GALLONS OF DIESEL FUEL. 13. ALL TANKS SHALL BE EQUIPPED WITH CONTAINEMENT MANHOLES AND OVERFILL PROTECTION. ALL PIPING SHALL BE DOUBLE WALL FEXIBLE TOTAL CONTAINMENT. 14. THE ISLAND BOLLARD SHALL BE A MINIMUM 4" DIAMETER, SCHEDULE 40 STEEL PIPE U—SHAPED FILLED WITH CONCRETE. THE PIPE SHALL BE SET IN 3000 PSI CONCRETE FOOTING, 24" IN DIAMETER AND 3'-6" DEEP. 15. THE CONTRACTOR SHALL CONFINE HIS OPERATIONS AND ACTIVITIES WITHIN THE PROPERTY RIGHT OF WAY. NO PROPOSED WORK IS ANTICIPATED ON PUBLIC STREETS. 16. THE CONTRACTOR SHALL MAINTAIN ALL EXCAVATION IN DRY CONDITIONS. 17. ALL EXISTING UTILITIES, WATER, GAS, DRAINS, & ELECTRIC SHALL BE PROPERLY PROTECTED AND MAINTAINED DURING THE CONSTRUCTION PERIOD. 18. THE CONTRACTOR SHALL SHORE, BRACE, SHEET PILE OR OTHERWISE SUPPORT THE EXISTING BUILDING, UTILITIES AND STREETS NEXT TO THE PROPOSED UNDERGROUND STORAGE TANKS DURING EXCAVATION. 19. THE CONTRACTOR SHALL STRAP THE UNDERGROUND STORAGE TANKS TO THE CONCRETE SLAB PER THE MANUFACTURE'S SPECIFICATIONS. CONCRETE SLAB SHALL BE SIZED BY THE TANK MANUFACTURE'S TO RESIST UPLIFT WATER PRESSURE AND TO PREVENT TANK FROM MOVEMENTS. 20. THE APPLICANT SHALL REVIEW THIS PLAN WITH THE LOCAL OFFICIALS TO CONFIRM ITS COMPLIANCE WITH LOCAL CODES AND ZONNING BY-LAWS AND TO OBTAIN ANY PERMITS OR VARIANCES FOR THE PROPOSED WORK SHOWN ON THE PLAN. 21. THE CONTRACTOR SHALL RELOCATE UTILITIES IN CONFLICT WITH THE TANKS LAYOUT IN ACCORDANCE WITH APPLICABLE CODES AND REQUIREMENTS OF UTILITY COMPANIES. 22. LOCAT30N & DEPTH OF EXISTING UTILITIES SHOWN ARE BASED ON THE BEST AVAILABLE INFORMATION. LOCATIONS ARE NOT WARRANTED TO BE EXACT, NOR IT IS WARRANTED THAT ALL EXISTING UTILITIES ARE SHOWN. ♦ LEGEND DOUBLE WALL SUPPLY PIPING VENT PIPE ----_----- VAPOR RECOVERY PIPE ________________________ T N0. I DATE I BY R E V I S 1 0 N S S H E E T D E S C R I P T 1 0 N DESIGNED BY_Hc ___ DRAWN BY_ HC_____ SITE LAYOUT PLAN CHECKED BY_ HC___ DATE_ APRIL 2004 SCALE___= 10' - SHEET_ _OF__? uAM , V: C Cn i: f'a b( N0. I DATE I BY R E V I S 1 0 N S S H E E T D E S C R I P T 1 0 N DESIGNED BY_Hc ___ DRAWN BY_ HC_____ SITE LAYOUT PLAN CHECKED BY_ HC___ DATE_ APRIL 2004 SCALE___= 10' - SHEET_ _OF__?