HomeMy WebLinkAboutBass River Golf Course - Plot Plan1. Plan need not be stamped if all
the following information is put
on the Plot plan.
2. Tank location relative to bolding,
can be done after installation but befo:
the tank is covered over.
3. Well location, water dept wants
well to south east of tank location.
4. Notes on plan to indicate the fol;
Type of Tank
Date installed
Warranty
Test schedule above ground,, in groun,
and piping _test
Cathodic maintenance schedule
Name of installer
5. Add location of water service and
septic system to plot plan
This list has been approved by
Chief Akin, Rick DeMelloBruce
Murphy and Paul Wilson on C10/28/85