Loading...
HomeMy WebLinkAboutBass River Golf Course - Plot Plan1. Plan need not be stamped if all the following information is put on the Plot plan. 2. Tank location relative to bolding, can be done after installation but befo: the tank is covered over. 3. Well location, water dept wants well to south east of tank location. 4. Notes on plan to indicate the fol; Type of Tank Date installed Warranty Test schedule above ground,, in groun, and piping _test Cathodic maintenance schedule Name of installer 5. Add location of water service and septic system to plot plan This list has been approved by Chief Akin, Rick DeMelloBruce Murphy and Paul Wilson on C10/28/85