Loading...
HomeMy WebLinkAboutEngineered Plans - 2017vv e �oyo� 9.7 50.6 50.4 � 49.9 ` F p0 �o 6619?°°' � LOT 76 49.99 9 ��r; 4 50.4 Area=15,076 SFf 50.0 �� 51.7 50.4 `U/>:.� �� 51.R o 4 51.2 h� 52.4 50 0%� o ^• k No / 51.8 co Cly / _ i PORCH G G tN wEXtSTtpYJE y2•s I w - �- w - G , 000 E�: 50.1 - ► G - BEpF FND -}- _ G - \ 3 To? pF 9 LEGEND -50 50.0 BENCHMARK: EI. 52.8 (Assumed Datum) Top of Foundation 51.6 Bulkhead\ 51.8 50.4 J �U \ aIJ: 00\ •O I IN -GROUND 20 / �0. „ o_ I \ PooL i co �d Q 2017 MORAN ENammwa ASsacuns, LLC 52.9 52.5 Ln N he 52.3 52.6 52.5 SCALE: 7 "=20' 0' 20' 40' 60' EX/ST/NG SEPTIC TANK TO REMAIN Existing Building Edge of Pavement Existing Contour Existing Septic System Existing Spot Elevation Proposed Septic System PROPOSED LEACHING FIELD 30.5' LONG BY /l. 0' WIDE CUL TEC CONTACTOR 100HD 52.3 Yarmouth Health Department 52.2A At I Z' V/ - PP VED i me Date "OF 4t, S r MICHAEL 9cyG S. m LA.DU E ,-No. 37560_ N 14F LO C v roil -LOCUS BASS RIVER Crept -�� rYester Mooring �'one N'9i LOCATION MAP Deed: Bk. 19781, Pg. 295 Plan: Bk. 154, Pg. 98, Lot 9 LEACHING AREA DETAIL /" - 20' • �n 0 r7 • • 1.0~ 11.0' THREE ROWS OF FOUR CUL TEC CONTA TOR 100HD SET ROWS 1.0' APART 7 Lief's Lane Yarmouth, MA William and Jane O'Donnell, Trustees ASSESSORS' ID: SCALE: 80-C2-9 1"=20' DATE: 05/10/2017 SHEET 1 of 3 Moran Engineering Associates, LLC 941 Main 5t., Harwich, MA PO Box 183, 5. Harwich, MA 02661 508-432-2878 Gas Meter / Elec Meter// E cV_ 0�0�0 0 50.9 \ \ / GARPG P o_ 52.8 deck o \ te. Gono \ o.� • 52.7 \ .- i52.7 AX 50.4 J �U \ aIJ: 00\ •O I IN -GROUND 20 / �0. „ o_ I \ PooL i co �d Q 2017 MORAN ENammwa ASsacuns, LLC 52.9 52.5 Ln N he 52.3 52.6 52.5 SCALE: 7 "=20' 0' 20' 40' 60' EX/ST/NG SEPTIC TANK TO REMAIN Existing Building Edge of Pavement Existing Contour Existing Septic System Existing Spot Elevation Proposed Septic System PROPOSED LEACHING FIELD 30.5' LONG BY /l. 0' WIDE CUL TEC CONTACTOR 100HD 52.3 Yarmouth Health Department 52.2A At I Z' V/ - PP VED i me Date "OF 4t, S r MICHAEL 9cyG S. m LA.DU E ,-No. 37560_ N 14F LO C v roil -LOCUS BASS RIVER Crept -�� rYester Mooring �'one N'9i LOCATION MAP Deed: Bk. 19781, Pg. 295 Plan: Bk. 154, Pg. 98, Lot 9 LEACHING AREA DETAIL /" - 20' • �n 0 r7 • • 1.0~ 11.0' THREE ROWS OF FOUR CUL TEC CONTA TOR 100HD SET ROWS 1.0' APART 7 Lief's Lane Yarmouth, MA William and Jane O'Donnell, Trustees ASSESSORS' ID: SCALE: 80-C2-9 1"=20' DATE: 05/10/2017 SHEET 1 of 3 Moran Engineering Associates, LLC 941 Main 5t., Harwich, MA PO Box 183, 5. Harwich, MA 02661 508-432-2878 6" OF STONE UNDER TANK I 19't -I i 11't r SEPTIC TANK NOTES "D" BOX NOTES 1. Extend inlet tee 10" min. below flow line; extend 1. When system is dosed or slope of inlet pipe outlet tee 14" below flow line. exceeds 0.08'Ift. install inlet tee cut-off one inch above outlet invert. DESIGN DATA DESIGN FLOW. 3 - BEDROOMS AT 110 GPD = 330 GPD SEPTIC TANK 330 GALLONS AT200%= 660 GALLON USE: EXISTING 1000 -GALLON SEPTIC TANK 6't _ I _ 30.5' LENGTH INSTALLED 2. Provide 20" manholes over center of tank, inlet and outlet with readily removable impermeable covers. 2. Install outlet pipes level 2 feet minimum. 3. Install access port over inlet and outlet 3. Provide a minimum sump of 6" below outlet invert. with precast concrete or equivalent watertight 4. Install access port over "D" Box with precast concrete or riser within 6" min. of final grade. equivalent watertight riser within 6" min. of final grade. LEACHING AREA: 30.5'X 11.0' X 0.5' (STONE -LESS FIELD) LEACH FACILITY DESIGN: 12-CULTEC CONTACTOR 100HD (3 -ROWS OF 4 -UNITS) = 91.5 LF. 91.5 LF.X5.0SF/LF=457.5 SF, 457.5 SF X 0.74 GPD/SF = 338.5 GPD. 338 GPD PROVIDED > 330 GPD REQUIRED USE: 3 -ROWS OF 4-CULTEC CONTACTOR 10014D. SET CHAMBERS ONE FOOT APART. COVER ENTIRE FIELD WITH CULTEC 410 FILTER FABRIC. BACKFILL TO THE TOP OF COMPONENTS WITH CLEAN TITLE 5 FILL. PROVIDE THREE INSPECTION PORTS PER PLAN. INSPECTIONS PORTS ARE REQUIRED TO HAVE IRRIGATION CONTROL BOX COVERS TO GRADE. 0 2017 MORAN ENGINEERING ASSOCIATES, LLC CONSTRUCTION NOTES 1. CONTACT OFFICE (508 432 2878) A MINIMUM OF 48 - HOURS PRIOR TO START OF PROJECT. 2. EXISTING SEPTIC TANK IS TO BE PUMPED AND INSPECTED FOR RE -USE PRIOR TO CONSTRUCTION. EXISTING SEPTIC TANK INVERT ELEVATIONS ARETO BE FIELD VERIFIED BY THE SEPTIC SYSTEM INSTALLER 3, REPLACE SEPTIC TANK INLET AND OUTLET TEE'S IF CORRODED OR WORN 4. A SOIL INSPECTION IS REQUIRED PRIOR TO PLACEMENT OF PROPOSED LEACHING FIELD. REMOVE ANY IMPERVIOUS OR CONTAMINATED SOILS TO EL. 51.7 t. 5. PUMP & FILL EXISTING LEACHING PIT -INSPECTION REQUIRED. 6, COVER THE PROPOSED LEACHING AREA WITH A CLEAN TITLE 5 FILL TO THE CROWN OF THE CULTEC CONTACTOR 100HD 7. A FINAL INSPECTION IS REQUIRED PRIOR TO COVERING SYSTEM GENERAL NOTES NATIVE CULTEC CROSS SECTION FILTER FABRIC TITLE 5 DEEP OBERVATION HOLE #1 4' PVC PIPE AT INVERT 6.10' EL. 42.65 NO WATER ENCOUNTERED NOTES FOR CULTEC 1.) Must be a Cert.Cultec Installer. 2.) Cultec No. 410 Filter Fabric or equal approved by Cultec required. DEEP HOLE LOGS DATE: 05/04/2017 TIME: 1:00 PM ELEV. 52.90 FROM SURFACE EXISTING SEPTIC TANK "D" BOX COLOR (MUNSELL) LEACH FACILITY STRUCTURE CONSISTENCY, OTHER 52.15 9" HTM Fill IRRIGATION CULTEC RECHARGER IOOHD N/A N/A EL. 52.70 15" Apb CONTROL Box 4' OR 6' PVC PULL CAP, END CAP, END PLUG OR CLEANOUT. 10YR4/3 NO Granular 49.73 38" 6' SCH, 40 PVC OR SDR -35 PVC PIPE RISER EL. 52.80 TOP OF COVERS TO BE WITHIN 6" OF GRADE ACCESS PORT EL. 52.8# MIN 2% SLOPE C FOUNDATION 2.5Y5/6 NO ACCESS PORTS WITHIN 3' - 6' •• 4'5CH.40P.V.C. 3' MIN OF FINISH GRADE MIN. MIN. 9" COVER MAX 36" COVER INSPECTION PORTS - 3 FILTER FABRIC EL. 50.30 a•SCH. aoP.v.c. EL. 49.80 EXISTING 5=0.02 MIN. 3• 5=0.01 MIN. y , -�6" EL. 49.90 J 1,000 a.'o' EL. 49.70 EL. 49.50 EL. 49.30 12.15" EL. 49.25 INVERT EXISTING GALLON INSTALL EXISTING •: ' .' CONFIRM BAFFLE CONFIRM I 7.50' EACH UNIT (INSTALLED) .. .• EL. 48.75 I- 6" OF STONE UNDER TANK I 19't -I i 11't r SEPTIC TANK NOTES "D" BOX NOTES 1. Extend inlet tee 10" min. below flow line; extend 1. When system is dosed or slope of inlet pipe outlet tee 14" below flow line. exceeds 0.08'Ift. install inlet tee cut-off one inch above outlet invert. DESIGN DATA DESIGN FLOW. 3 - BEDROOMS AT 110 GPD = 330 GPD SEPTIC TANK 330 GALLONS AT200%= 660 GALLON USE: EXISTING 1000 -GALLON SEPTIC TANK 6't _ I _ 30.5' LENGTH INSTALLED 2. Provide 20" manholes over center of tank, inlet and outlet with readily removable impermeable covers. 2. Install outlet pipes level 2 feet minimum. 3. Install access port over inlet and outlet 3. Provide a minimum sump of 6" below outlet invert. with precast concrete or equivalent watertight 4. Install access port over "D" Box with precast concrete or riser within 6" min. of final grade. equivalent watertight riser within 6" min. of final grade. LEACHING AREA: 30.5'X 11.0' X 0.5' (STONE -LESS FIELD) LEACH FACILITY DESIGN: 12-CULTEC CONTACTOR 100HD (3 -ROWS OF 4 -UNITS) = 91.5 LF. 91.5 LF.X5.0SF/LF=457.5 SF, 457.5 SF X 0.74 GPD/SF = 338.5 GPD. 338 GPD PROVIDED > 330 GPD REQUIRED USE: 3 -ROWS OF 4-CULTEC CONTACTOR 10014D. SET CHAMBERS ONE FOOT APART. COVER ENTIRE FIELD WITH CULTEC 410 FILTER FABRIC. BACKFILL TO THE TOP OF COMPONENTS WITH CLEAN TITLE 5 FILL. PROVIDE THREE INSPECTION PORTS PER PLAN. INSPECTIONS PORTS ARE REQUIRED TO HAVE IRRIGATION CONTROL BOX COVERS TO GRADE. 0 2017 MORAN ENGINEERING ASSOCIATES, LLC CONSTRUCTION NOTES 1. CONTACT OFFICE (508 432 2878) A MINIMUM OF 48 - HOURS PRIOR TO START OF PROJECT. 2. EXISTING SEPTIC TANK IS TO BE PUMPED AND INSPECTED FOR RE -USE PRIOR TO CONSTRUCTION. EXISTING SEPTIC TANK INVERT ELEVATIONS ARETO BE FIELD VERIFIED BY THE SEPTIC SYSTEM INSTALLER 3, REPLACE SEPTIC TANK INLET AND OUTLET TEE'S IF CORRODED OR WORN 4. A SOIL INSPECTION IS REQUIRED PRIOR TO PLACEMENT OF PROPOSED LEACHING FIELD. REMOVE ANY IMPERVIOUS OR CONTAMINATED SOILS TO EL. 51.7 t. 5. PUMP & FILL EXISTING LEACHING PIT -INSPECTION REQUIRED. 6, COVER THE PROPOSED LEACHING AREA WITH A CLEAN TITLE 5 FILL TO THE CROWN OF THE CULTEC CONTACTOR 100HD 7. A FINAL INSPECTION IS REQUIRED PRIOR TO COVERING SYSTEM GENERAL NOTES NATIVE CULTEC CROSS SECTION FILTER FABRIC TITLE 5 DEEP OBERVATION HOLE #1 4' PVC PIPE AT INVERT 6.10' EL. 42.65 NO WATER ENCOUNTERED NOTES FOR CULTEC 1.) Must be a Cert.Cultec Installer. 2.) Cultec No. 410 Filter Fabric or equal approved by Cultec required. DEEP HOLE LOGS DATE: 05/04/2017 TIME: 1:00 PM ELEV. 52.90 FROM SURFACE HOR. TEXTURE COLOR (MUNSELL) SOIL MOTTLING STRUCTURE CONSISTENCY, OTHER 52.15 9" HTM Fill N/A N/A N/A 51.65 15" Apb Loamy Sand 10YR4/3 NO Granular 49.73 38" Bwb I Loamy Medium Sand 10YR4/6 NO Massiver, Very Friable 42.65 1 123" C Medium Sand 2.5Y5/6 NO Loose, single grain BOT. of PERC: 30' RATE: < 2 MIN/INCH WITNESS: AMY VON HONE, R.S., YARMOUTH HEALTH DEPARTMENT TEST BY: RICK JUDD. SE 1165 i)' ALL`SYSTEMlCOMPONENTS SHALL BE INSTALLED IN ACCORDANCE W/T1TLE 5 OF THE SANITARY CODE & ANYAPPLICABLE REGULATIONS. 2 ) PRIOR TO BACK FILLING THE INSTALLATION, THE DESIGNER & HEALTH AGENT SHALL BE NOTIFIED FOR INSPECTION. 3.) ANY -ALTERATIONS OF THIS DESIGN MUST BE APPROVED BY THE DESIGNER & BOARD OF HEALTH, IN WRITING. 4.) SYSTEM IS NOT DESIGNED FOR A GARBAGE GRINDER. 5.) THE INSTALLER IS TO VERIFY'TH LOCATIONS) OF UTILITIES, CESSPOOL(S) AND SEWER INVERTS PRIOR TO CONSTRUCTION. 6.) ALL UNSUITABLE MATERIAL WITHIN 5 FT. IN ALL DIRECTIONS FROM THE SOIL ABSORPTION SYSTEM SHALL BE REMOVED & REPLACED W/CLEAN, COARSE SAND. 7.) ALL FILL MATERIAL UTILIZED FOR THE SOIL ABSORPTION SYSTEM SHALL BE CLEAN, COARSE SAND FREE FROM DELETERIOUS MATERIAL AND SHALL HAVE A PERCOLATION RATE OF LESS THAT 2 M1N.AN. BEFORE & AFTER PLACEMENT. 8.) EXISTING CESSPOOL(S) TO BE PUMPED AND BACK FILLED PER TITLE 5 ABANDONMENT PROCEDURES. 9.) DURING INSTALLATION, THE CONTRACTOR IS RESPONSIBLE TO PROVIDE A SAFE EXCAVATION AREA. 10.) GROUND COVER OVER SEPTIC SYSTEM COMPONENTS SHALL NOT EXCEED 36". 11.) ALL GRAVITY SEWER PIPE SHALL BE 4" DIA. SCH 40 PVC UNLESS OTHERWISE NOTED. THE MINIMUM SLOPE OF 4" DIA. SCH 40 PVC SHALL NOT BE LESS THEM0.01 FT/FT. 12) WHEREVER SEPTIC LINES CROSS WATER SERVICE LINES OR WHEN WATER SERVICE LINES COME WITHIN 10' OF THE PROPOSED S.A.S.- PIPES SHALL BE CLASS 150 PRESSURE PIPE & SHOULD BE PRESSURE TESTED TO ASSURE WATERTIGHTNESS, COORDINATE WITH LOCAL WATER DEPARTMENT. 13. j'PLACE MAGNETIC MARKING TAPE OVER ALL COMPONENTS. 7 Lief's Lane '--------_I Yarmouth, MA William and Jane O'Donnell, Trustees ASSESSORS' ID: SCALE: 80-C2-9 1"= 20' DATE: 05/10/2017 SHEET 2 of 3 Moran Engineering Associates, LLC 941 Main St., Harwich, MA PO Box 183, S. Harwich, MA 02661 508-432-2878