HomeMy WebLinkAboutBono Sunoco- Stage 2 Vapor Recoveryr
1
r
1
6 1/4'
1
- TO VENT
I
_ RISER NOTES:
- I EVR MANIF01 _D
,
,
I. SEE DWG. 3-410 SHT. 2 FOR BILL OF MATERIALS.
J.B.
STAGE I VAPOR 2. 1/8'/FT. MIN. SLOPE MUST BE MAINTAINED;FOR
W Ir
RECOVERY SYSTEM PROPER SYSTEM OPERATION. ALL PIPING TO BE
1
• INSTALLED FREE OF SAGS,PEAKS OR ANY. OTHER
CONDITIONS WHERE PRODUCT COULD COLLECT./0000
;
3. TESTING - SEE DWG. 3-410, SHT. I, SECT. 5.8 FOR DETAILS
I
3.1 50* AIR TEST - PIPING SHALL BE AIR TESTED
;
TO 50 PSI (POUNDS PER SQUARE INCH) WHICH
Q
W z
- WHICH MUST BE MAINTAINED WITHOUT PRESSURE DROP UNTIL
—
;
BACKFILLING, CONCRETE MAT, ISLAND AND DRIVE WORK
-- - � � OF DISP.
ARE COMPLETE. THISo D , PRIOR TO
o GJOINTS,rEST
0-1
BACKFILLING, ALLOPIPE CONNECTIONS AND FITTINGS
0
I
1
SHALL BE CHECKED BY COATING THEM WITH A RICH
va
$ 1/16' 8 3/8' 8 3/8' 4 7/8" 9 3/4' 13 3/4' 13 3/4' ,
�'� 3 - 1 1/2'
_ _----------------------- 7/8'P PRODUCT RISERS
l r
--1 e,
2 3/4' 44�1—I_�L_-------- I --�
,(� - - OF DISP.
{ -- r----{+�---'--t+}--- t+j---- + -- - OF DISP. —_
_ 6 1 1/2'0 PRODUCT I J.B. I r
`v r RISERS — _ —
_ _ _ _ _� BASE FRAME
Ln BASE FRAME O FRONT
FRONT 1'0 HEALY JET PUMP RISER
-1' 9 HEALY JET PUMP RISER
.-ti q/kl 43�
PLAN
1385" MGB BASE FRAME
1 1/2'6 PRODUCT RISER
1' OV/R RISER—,,-,
T-w.j
w
VlJ
(n WcC7
z
n.!-7
6 1/4'
PLAN
'395' HI—HOSE MGB BASE FRA"1E
`S
2 - 1 1/2' OPRODUCT RISERS
BASE r RAME ss
6 1/4'
BASE FRAME 35
J.B.
W Ir
o
I
—�
- — - {--CL OF DISP_
Q
W z
I
—
-
- — - - — - - -
-
-- - � � OF DISP.
0-1
I
0
I
1
I
va
r.
FR NT
1' OV/R RISr R
20 3/4'
PLAN
ELECTRONIC RETROFIT
(SINGLE OR DUO — 1) BASE FRAME
1 1/2' P PRODUCT RISER
OF DISP. BASE FRAME ss
7---� I 1' VIV/R RISER
p J I i I
i O N I f
I --- IJ.---
FRONT
20 3/4'
24 3/4'
PLAN
DRESSER/WAYNE ELECTRONIC
(SINGLE OR DUO — I ) BASE FRAME
THIS DRAWING IS AND SHALL REMAIN THE PROPERTY OF SUN REFINING
AND MARKETING COMPANY. USE, REPRODUCTION OR ALTERATION OF
THIS DRAWING WITHOUT THE EXPRESSED WRITTEN PERMISSION OF SUN
REFINING AND MARKETING COMPANY IS PROHIBITED.
24 3/4'
PLAN
ELECTRONIC RETROFIT
(BLENDER OR DUO — 2) BASE FRAME
FOR FUTURE CONNECTION TO
O1'PIPE CAP DISPENSER VAPOR RECOVERY
SEE 'CAMBRIDGE ENGINEERING'
DWGS. 8501-395MJ,
TOP OF 1' 8501-518MJ, 8501-511MJ OR 8502-124.
V/R RISER
Ln TOP OF ISLAND
2' X 1' FRP I hn'D. RECIjCr7R BUSHING ea
I' GALV. STL. RISER
2' FRP SLEEVE COUPLING e7
2' FRP VAPOR LINE
(SLOPE DOWN 1/8'/FT. TO
JET PUMP c ECO. TK.)
T2 1 1/2' X 30' FLEX___L
CONNECTOR
2' X 1 1/2' FRP 73
THR'D. REDUCER BUSHING
VAPOR RISER AND BRANCH LINE ELEVATION
(MGB'S AND ALL ELECT. RETRO. DISPENSERS)
I SOLUTION OF SOAP AND WATER FOR PHYSICAL +
n OBSERVATION OF LEAKS AS EVIDENCE BY SOAP BUBBLES.
CAUTION MUST BE TAKEN THAT ALL TANKS BE COMPLETELY
- � ISOLATED FROM THE PIPING DURING THIS TEST AS THE
f TANKS THEMSELVES ARE NOT CAPABLE OF WITHSTANDING
( THIS AMOUNT OF PRESSURE. ANY DAMAGE TO TANKS AS A
RESULT OF OVER -PRESSURING SHALL BE CORRECTED AT THE
EXPENSE OF THE CONTRACTOR. ALL TERMINAL
POINTS SHALL BE CAPPED AND/OR PLUGGED DURING
TEST AND BE AVOIDED WHILE UNDER PRESSURE.
111 111 111 NO LINES SHOULD BE BACKFILLED UNTIL TESTED
AND CERTIFIED TIGHT
I
0 o c
REO. ` ULTRA U/L ` ECONO U/L% '
CD
� �
`. 2' FRP PIPE CAPPED n EDGE OF TANK MAT
w
z
CD W - 3/4' CONDUIT FROM BLDG. - PLUGGED n
oEDGE OF TANK MAT
2' VAPOR RETURN HEADER
UNDERGROUND FRP PIPING MUST BE PROVIDED
�--- W/ A METAL PROTECTOR PLATE OF AQEQUATE
STRENGTH AND SIZE POSITIONED NO MORE THAN
r — — SIX INCHES ABOVE THE PIPING TO PREVENT DAMAGE
- - — — TO THE PIPING DURING FUTURE EXCAVATIONS.
1' +� V/R RISER IN ADDITION, A WARNING TAPE BURIED NO MORE
THAN SIX INCHES BELOW GRADE SHALL BE
POSITIONED OVER THE FIBERGLASS PIPING WARNING
THAT FIBERGLASS PIPING IS BELOW.
RETRO -BLENDER
(SEE BASE RETRO -SINGLE I
FRAME DETAIL) (SEE BASE
FRAME DETAIL)
f'
1 1/2' O PRODUCT
RISER
1'95V/R RISER
I 0
i
I
L-
1 1/2' 0 PRODUCT RISER
i
I
+
O
J
2' VAPOR RETURN LINE w PRODUCT LINES
(SLOPE 1/8'/FT., MIN.) o TO DISPENSERS -
Z
O '
U
W
CC
O
s
-395 MULTI -GRADE BLENDER
(SEE BASE FRAME DETAIL) TYPICAL VAPOR RECOVERY PIPING ,
FOR BALANCE SYSTEM
REFERENCE DRAWINGS
STANDARD FIBERGLASS PIPING DETAILS 3-410 REV.5
SHEETS 1 & 2
FIBERGLASS TANKS & DETAILS 3-411 REV.4
EXTERIOR CONCRETE DETAILS 4-501 REV.3
,
REV.REVISIONS MADE CHK'D. APPV'D.
NO. DATE BY BY
SUN REFINING & MAREETING COYLPANY a
Facil;iiee & DisfribuEion Departmoni
Philedelplzia, PA
STAGE JI -VAPOR RECOVERY
HEALY CENTRAL SYSTEM
'PIPING ONLY'
DRAWN RM MANACEPS APPROVAL DRAWING NUMBER REV. NO.
CHECKED L R AA3-424DATE
J-
3/ 4; _
SCALE N.T.S. 1
I M