Loading...
HomeMy WebLinkAboutBono Sunoco- Stage 2 Vapor Recoveryr 1 r 1 6 1/4' 1 - TO VENT I _ RISER NOTES: - I EVR MANIF01 _D , , I. SEE DWG. 3-410 SHT. 2 FOR BILL OF MATERIALS. J.B. STAGE I VAPOR 2. 1/8'/FT. MIN. SLOPE MUST BE MAINTAINED;FOR W Ir RECOVERY SYSTEM PROPER SYSTEM OPERATION. ALL PIPING TO BE 1 • INSTALLED FREE OF SAGS,PEAKS OR ANY. OTHER CONDITIONS WHERE PRODUCT COULD COLLECT./0000 ; 3. TESTING - SEE DWG. 3-410, SHT. I, SECT. 5.8 FOR DETAILS I 3.1 50* AIR TEST - PIPING SHALL BE AIR TESTED ; TO 50 PSI (POUNDS PER SQUARE INCH) WHICH Q W z - WHICH MUST BE MAINTAINED WITHOUT PRESSURE DROP UNTIL — ; BACKFILLING, CONCRETE MAT, ISLAND AND DRIVE WORK -- - � � OF DISP. ARE COMPLETE. THISo D , PRIOR TO o GJOINTS,rEST 0-1 BACKFILLING, ALLOPIPE CONNECTIONS AND FITTINGS 0 I 1 SHALL BE CHECKED BY COATING THEM WITH A RICH va $ 1/16' 8 3/8' 8 3/8' 4 7/8" 9 3/4' 13 3/4' 13 3/4' , �'� 3 - 1 1/2' _ _----------------------- 7/8'P PRODUCT RISERS l r --1 e, 2 3/4' 44�1—I_�L_-------- I --� ,(� - - OF DISP. { -- r----{+�---'--t+}--- t+j---- + -- - OF DISP. —_ _ 6 1 1/2'0 PRODUCT I J.B. I r `v r RISERS — _ — _ _ _ _ _� BASE FRAME Ln BASE FRAME O FRONT FRONT 1'0 HEALY JET PUMP RISER -1' 9 HEALY JET PUMP RISER .-ti q/kl 43� PLAN 1385" MGB BASE FRAME 1 1/2'6 PRODUCT RISER 1' OV/R RISER—,,-, T-w.j w VlJ (n WcC7 z n.!-7 6 1/4' PLAN '395' HI—HOSE MGB BASE FRA"1E `S 2 - 1 1/2' OPRODUCT RISERS BASE r RAME ss 6 1/4' BASE FRAME 35 J.B. W Ir o I —� - — - {--CL OF DISP_ Q W z I — - - — - - — - - - - -- - � � OF DISP. 0-1 I 0 I 1 I va r. FR NT 1' OV/R RISr R 20 3/4' PLAN ELECTRONIC RETROFIT (SINGLE OR DUO — 1) BASE FRAME 1 1/2' P PRODUCT RISER OF DISP. BASE FRAME ss 7---� I 1' VIV/R RISER p J I i I i O N I f I --- IJ.--- FRONT 20 3/4' 24 3/4' PLAN DRESSER/WAYNE ELECTRONIC (SINGLE OR DUO — I ) BASE FRAME THIS DRAWING IS AND SHALL REMAIN THE PROPERTY OF SUN REFINING AND MARKETING COMPANY. USE, REPRODUCTION OR ALTERATION OF THIS DRAWING WITHOUT THE EXPRESSED WRITTEN PERMISSION OF SUN REFINING AND MARKETING COMPANY IS PROHIBITED. 24 3/4' PLAN ELECTRONIC RETROFIT (BLENDER OR DUO — 2) BASE FRAME FOR FUTURE CONNECTION TO O1'PIPE CAP DISPENSER VAPOR RECOVERY SEE 'CAMBRIDGE ENGINEERING' DWGS. 8501-395MJ, TOP OF 1' 8501-518MJ, 8501-511MJ OR 8502-124. V/R RISER Ln TOP OF ISLAND 2' X 1' FRP I hn'D. RECIjCr7R BUSHING ea I' GALV. STL. RISER 2' FRP SLEEVE COUPLING e7 2' FRP VAPOR LINE (SLOPE DOWN 1/8'/FT. TO JET PUMP c ECO. TK.) T2 1 1/2' X 30' FLEX___L CONNECTOR 2' X 1 1/2' FRP 73 THR'D. REDUCER BUSHING VAPOR RISER AND BRANCH LINE ELEVATION (MGB'S AND ALL ELECT. RETRO. DISPENSERS) I SOLUTION OF SOAP AND WATER FOR PHYSICAL + n OBSERVATION OF LEAKS AS EVIDENCE BY SOAP BUBBLES. CAUTION MUST BE TAKEN THAT ALL TANKS BE COMPLETELY - � ISOLATED FROM THE PIPING DURING THIS TEST AS THE f TANKS THEMSELVES ARE NOT CAPABLE OF WITHSTANDING ( THIS AMOUNT OF PRESSURE. ANY DAMAGE TO TANKS AS A RESULT OF OVER -PRESSURING SHALL BE CORRECTED AT THE EXPENSE OF THE CONTRACTOR. ALL TERMINAL POINTS SHALL BE CAPPED AND/OR PLUGGED DURING TEST AND BE AVOIDED WHILE UNDER PRESSURE. 111 111 111 NO LINES SHOULD BE BACKFILLED UNTIL TESTED AND CERTIFIED TIGHT I 0 o c REO. ` ULTRA U/L ` ECONO U/L% ' CD � � `. 2' FRP PIPE CAPPED n EDGE OF TANK MAT w z CD W - 3/4' CONDUIT FROM BLDG. - PLUGGED n oEDGE OF TANK MAT 2' VAPOR RETURN HEADER UNDERGROUND FRP PIPING MUST BE PROVIDED �--- W/ A METAL PROTECTOR PLATE OF AQEQUATE STRENGTH AND SIZE POSITIONED NO MORE THAN r — — SIX INCHES ABOVE THE PIPING TO PREVENT DAMAGE - - — — TO THE PIPING DURING FUTURE EXCAVATIONS. 1' +� V/R RISER IN ADDITION, A WARNING TAPE BURIED NO MORE THAN SIX INCHES BELOW GRADE SHALL BE POSITIONED OVER THE FIBERGLASS PIPING WARNING THAT FIBERGLASS PIPING IS BELOW. RETRO -BLENDER (SEE BASE RETRO -SINGLE I FRAME DETAIL) (SEE BASE FRAME DETAIL) f' 1 1/2' O PRODUCT RISER 1'95V/R RISER I 0 i I L- 1 1/2' 0 PRODUCT RISER i I + O J 2' VAPOR RETURN LINE w PRODUCT LINES (SLOPE 1/8'/FT., MIN.) o TO DISPENSERS - Z O ' U W CC O s -395 MULTI -GRADE BLENDER (SEE BASE FRAME DETAIL) TYPICAL VAPOR RECOVERY PIPING , FOR BALANCE SYSTEM REFERENCE DRAWINGS STANDARD FIBERGLASS PIPING DETAILS 3-410 REV.5 SHEETS 1 & 2 FIBERGLASS TANKS & DETAILS 3-411 REV.4 EXTERIOR CONCRETE DETAILS 4-501 REV.3 , REV.REVISIONS MADE CHK'D. APPV'D. NO. DATE BY BY SUN REFINING & MAREETING COYLPANY a Facil;iiee & DisfribuEion Departmoni Philedelplzia, PA STAGE JI -VAPOR RECOVERY HEALY CENTRAL SYSTEM 'PIPING ONLY' DRAWN RM MANACEPS APPROVAL DRAWING NUMBER REV. NO. CHECKED L R AA3-424DATE J- 3/ 4; _ SCALE N.T.S. 1 I M