HomeMy WebLinkAboutBono Sunoco- Stage 2 Vapor Recovery002OBSERVATION OF LEAKS AS EVIDENCE BY SOAP BUBBLES.
CAUTION MUST BE TAKEN THAT ALL TANKS BE COMPLETELY
1 ISOLATED FROM THE PIPING DURING THIS TEST AS THE
f ` I
TANKS THEMSELVES ARE NOT CAPABLE OF WITHSTANDING
THIS AMOUNT OF PRESSURE.. ANY DAMAGE TO TANKS AS A
RESULT OF OVER -PRESSURING SHALL BE CORRECTED AT THE
I I I I EXPENSE OF THE CONTRACTOR. ALL TERMINAL
POINTS SHALL BE CAPPED AND/OR PLUGGED DURING
TEST AND BE AVOIDED WHILE UNDER PRESSURE.
NO LINES SHOULD BE BACKFILLED UNTIL TESTED
AND CERTIFIED TIGHT.
I � I
REG. `ULTRA U/L * ` ECONO U/L
%%mon.* �...... mow.....
2' FRP PIPE CAPPE -
LL w �. J e EDGE OF TANK MAT
8 1/16" 8 3/8' 8 3/8' 4 7/8" 9 3/4' 13 3/4' 13 3/4' z
o a- 3/4' CONDUIT FROM BLDG. - PLUGGED 0
a
EDGE OF TANK MAT
3 - 1 1/2' $ 2'VAPOR RETURN HEADER o
—,— — — — - — — — — — — — — — — — —'J — — — — 7/8'v i PRODUCT RISERS UNDERGROUND FRP PIPING MUST BE PROVIDED
L,
----1 2 3/4 _ _ _ I_ �1 _ W/ A METAL PROTECTOR PLATE OF ADEQUATE
M - — - - - OF DISP. - POSITIONED NO MORE THAN
j� � � ,J� STRENGTH AND SIZE
io �, (+}- -- {`, - - — {+}- - -'— - (+}- - - — {+}- - - — + - - - fL OF DISP. '" mi SIX INCHES ABOVE THE PIPING TO PREVENT DAMAGE
6 - 1 1/2'0 PRODUCT J.B.
TO THE PIPING DURING FUTURE EXCAVATIONS..
r I N IN ADDITION, A WARNING TAPE BURIED NO MORE
— RISERS .. I 1'>�V/R RISER
— — — BASE FRAME (34�A i i THAN SIX INCHES BELOW GRADE SHALL BE
-- ---- ----T------- - -"- -- _ _ �.J
LO BASE FRAME 34 —
POSITIONED OVER THE FIBERGLASS PIPING WARNING
FRONT FRONT ,
THAT FIBERGLASS PIPING IS BELOW.
y 1' HEALY JET PUMP RISER
.
Ll' 9' HEALY JET JMF RISER RETRO -BLENDER '
•--5 3l8'
43' (SEE BASE RETRO -SINGLE
59 3/!3' 47' FRAME DETAIL)
(SEE BASE
FRAME DETAIL)
PLAN PLAN
'385' MGB BASE FRAME 1395' HI -HOSE MGB BASE FRA" iE 1 1/2•95PRODUCT '
RISER
1 1/2116 PRODUCT RISER 2 - 1 1/2' OPROOUCT RISERS
6 1/4'
10V/R RISER BASE r-RAME 3s
w J.B• w
CD
wz ------ --- !-- - -- OF D!SP. ww 1-
0_., v oco
I �
FRONT
r� 1' IDV/R RISER
20 3/4'
24 3/4'
PLAN
6 1/4'
- ELECTRONIC
RETROFIT
ELECTRONIC
RETROFIT
(SINGLE OR DUO
- 1) BASE FRAME
(BLENDER OR DUO
- 2) BASE FRAME
TO VENT
RISER _
k
I NOTES:
EVR MANIFOI -0 !,
i
I. SEE DWG. 3-410 SHT. 2 FOR BILL OF MATERIALS.
STAGE I VAPOR
RECOVERY SYSTEM 2. 1/8'/FT. MIN. SLOPE MUST BE MAINTAINED ,FOR
PROPER SYSTEM OPERATION. ALL PIPING 10 BE
*.� INSTALLED FREE OF SAGS, PEAKS OR ANY. OTHER
`� � CONDITIONS WHERE PRODUCT COULD COLLECT.
3. TESTING - SEE DWG. 3-410, SHT. I, SECT. 5.8 FOR DETAILS
rN
3.1 50* AIR TEST - PIPING SHALL BE AIR TESTED
TO 50 PSI (POUNDS PER SQUARE INCH) WHICH
WHICH MUST BE MAINTAINED WITHOUT PRESSURE DROP UNTIL
BACKFILLING, CONCRETE MAT, ISLAND AND DRIVE WORK
ARE COMPLETE. DURING THIS TEST, PRIOR TO
BACKFILLING, ALL PIPE JOINTS CONNECTIONS AND FITTINGS
NSHALL
BE CHECKEd 8Y COATING THEM WITH A RICH
SOLUTION OF SOAP AND WATER FOR PHYSICAL
OBSERVATION OF LEAKS AS EVIDENCE BY SOAP BUBBLES.
CAUTION MUST BE TAKEN THAT ALL TANKS BE COMPLETELY
1 ISOLATED FROM THE PIPING DURING THIS TEST AS THE
f ` I
TANKS THEMSELVES ARE NOT CAPABLE OF WITHSTANDING
THIS AMOUNT OF PRESSURE.. ANY DAMAGE TO TANKS AS A
RESULT OF OVER -PRESSURING SHALL BE CORRECTED AT THE
I I I I EXPENSE OF THE CONTRACTOR. ALL TERMINAL
POINTS SHALL BE CAPPED AND/OR PLUGGED DURING
TEST AND BE AVOIDED WHILE UNDER PRESSURE.
NO LINES SHOULD BE BACKFILLED UNTIL TESTED
AND CERTIFIED TIGHT.
I � I
REG. `ULTRA U/L * ` ECONO U/L
%%mon.* �...... mow.....
2' FRP PIPE CAPPE -
LL w �. J e EDGE OF TANK MAT
8 1/16" 8 3/8' 8 3/8' 4 7/8" 9 3/4' 13 3/4' 13 3/4' z
o a- 3/4' CONDUIT FROM BLDG. - PLUGGED 0
a
EDGE OF TANK MAT
3 - 1 1/2' $ 2'VAPOR RETURN HEADER o
—,— — — — - — — — — — — — — — — — —'J — — — — 7/8'v i PRODUCT RISERS UNDERGROUND FRP PIPING MUST BE PROVIDED
L,
----1 2 3/4 _ _ _ I_ �1 _ W/ A METAL PROTECTOR PLATE OF ADEQUATE
M - — - - - OF DISP. - POSITIONED NO MORE THAN
j� � � ,J� STRENGTH AND SIZE
io �, (+}- -- {`, - - — {+}- - -'— - (+}- - - — {+}- - - — + - - - fL OF DISP. '" mi SIX INCHES ABOVE THE PIPING TO PREVENT DAMAGE
6 - 1 1/2'0 PRODUCT J.B.
TO THE PIPING DURING FUTURE EXCAVATIONS..
r I N IN ADDITION, A WARNING TAPE BURIED NO MORE
— RISERS .. I 1'>�V/R RISER
— — — BASE FRAME (34�A i i THAN SIX INCHES BELOW GRADE SHALL BE
-- ---- ----T------- - -"- -- _ _ �.J
LO BASE FRAME 34 —
POSITIONED OVER THE FIBERGLASS PIPING WARNING
FRONT FRONT ,
THAT FIBERGLASS PIPING IS BELOW.
y 1' HEALY JET PUMP RISER
.
Ll' 9' HEALY JET JMF RISER RETRO -BLENDER '
•--5 3l8'
43' (SEE BASE RETRO -SINGLE
59 3/!3' 47' FRAME DETAIL)
(SEE BASE
FRAME DETAIL)
PLAN PLAN
'385' MGB BASE FRAME 1395' HI -HOSE MGB BASE FRA" iE 1 1/2•95PRODUCT '
RISER
1 1/2116 PRODUCT RISER 2 - 1 1/2' OPROOUCT RISERS
6 1/4'
10V/R RISER BASE r-RAME 3s
w J.B• w
CD
wz ------ --- !-- - -- OF D!SP. ww 1-
0_., v oco
I �
FRONT
r� 1' IDV/R RISER
20 3/4'
24 3/4'
PLAN
6 1/4'
1 1/2' P PRODUCT RISER
CL OF DISP. BASE FRAME ss
F1
71
w I � � 1' i(V/R P,ISER
wZ ------
oN I E��
FRONT
20 3/4' I
24 3/4'
PLAN
DRESSER/WAYNE ELECTRONIC
(SINGLE OR DUO - I) BASE FRAME
THIS DRAWING IS AND SHALL REMAIN THE PROPERTY OF S' -!N REFINING
AND MARKETING COMPANY. USE, REPRODUCTION OR ALTERATION OF
THIS DRAWING WITHOUT THE EXPRESSED WRITTEN PERMISSION OF SUN
REFINING AND MARKETING, COMPANY IS PROHIBITED.
;AME 3s
G OF DISP.
i
FOR FUTURE CONNECTION TO
12 PIPE CAP DISPENSER VAPOR RECOVERY
SEE 'CAMBRIDGE ENGINEERING'
DWGS. 8501-395MJ,
TOP OF 1' 8501-518MJ, 8501-511MJ OR 8502-124
V/R RISER
u' TOP OF ISLAND
2" X 1' FRP I tin'D. REC`!rFR BUSHING es
1' GALV. STL. RISER
2' FRP SLEEVE COUPLING eT
73
2' FRP VAPOR LINE
(SLOPE DOWN 1/8'/FT. TO
JET PUMP 0 ECO. TK.)
O1 1/2` X 30' FLEX
CONNECTOR
—2' X 1 1/2' FRP
THR'D. REDUCER BUSHING z3
VAPOR RISER .AND BRANCH LINE ELEVATION
(MGB'S AND ALL ELECT. RETRO. DISPENSERS)
1"16 V/R RISER
r --
I ❑
1 1/2'0 PRODUCT RISER-
2'VAPOR RETURN LINE
(SLOPE 1/8'/FT., MIN.) _
395 MULTI -GRADE BLENDER
u- PRODUCT LINES
o TO DISPENSERS
L
O
F --
U '
W
C�
(SEE BASE FRAME DETAIL) TYPICAL VAPOR RECOVERY PIPING
FOR BALANCE SYSTEM
REFERENCE DRAWINGS
STANDARD FIBERGLASS PIPING DETAILS 3-410 REV.5
SHEETS 1 & 2
FIBERGLASS TANKS & DETAILS 3-411 REV. 4,
EXTERIOR CONCRETE DETAILS 4-501 REV.3
r t
f
1
r
N0 DATE REVtS!DNS MADE Cl -A"' APPV'D.
BY BY
SUN REFINING & MARKETING COMPANY
�'aailiEiee �: �i�£ribuiion �aparExroni
PbOa.aelplia, PA
OF A9gs��
STAGE :II VAPOR RECOVERY
TWE
` HEALY CENTRAL SYSTEM
OS'PIPING ONLY'
'
Pilo- 27286
�FGISTER�� •F`�" - DRAWN M„A �fiG_t'S APPROVAL DRAWN.' NUMBER � .REV, hi0
'
r F __/ • CHECKED . I"x' ,.�"� � ��
' DATE /14; ES ti 3-424
"- 4 �j L.. 4 0,
SCALE
- ELECTRONIC
RETROFIT
ELECTRONIC
RETROFIT
(SINGLE OR DUO
- 1) BASE FRAME
(BLENDER OR DUO
- 2) BASE FRAME
1 1/2' P PRODUCT RISER
CL OF DISP. BASE FRAME ss
F1
71
w I � � 1' i(V/R P,ISER
wZ ------
oN I E��
FRONT
20 3/4' I
24 3/4'
PLAN
DRESSER/WAYNE ELECTRONIC
(SINGLE OR DUO - I) BASE FRAME
THIS DRAWING IS AND SHALL REMAIN THE PROPERTY OF S' -!N REFINING
AND MARKETING COMPANY. USE, REPRODUCTION OR ALTERATION OF
THIS DRAWING WITHOUT THE EXPRESSED WRITTEN PERMISSION OF SUN
REFINING AND MARKETING, COMPANY IS PROHIBITED.
;AME 3s
G OF DISP.
i
FOR FUTURE CONNECTION TO
12 PIPE CAP DISPENSER VAPOR RECOVERY
SEE 'CAMBRIDGE ENGINEERING'
DWGS. 8501-395MJ,
TOP OF 1' 8501-518MJ, 8501-511MJ OR 8502-124
V/R RISER
u' TOP OF ISLAND
2" X 1' FRP I tin'D. REC`!rFR BUSHING es
1' GALV. STL. RISER
2' FRP SLEEVE COUPLING eT
73
2' FRP VAPOR LINE
(SLOPE DOWN 1/8'/FT. TO
JET PUMP 0 ECO. TK.)
O1 1/2` X 30' FLEX
CONNECTOR
—2' X 1 1/2' FRP
THR'D. REDUCER BUSHING z3
VAPOR RISER .AND BRANCH LINE ELEVATION
(MGB'S AND ALL ELECT. RETRO. DISPENSERS)
1"16 V/R RISER
r --
I ❑
1 1/2'0 PRODUCT RISER-
2'VAPOR RETURN LINE
(SLOPE 1/8'/FT., MIN.) _
395 MULTI -GRADE BLENDER
u- PRODUCT LINES
o TO DISPENSERS
L
O
F --
U '
W
C�
(SEE BASE FRAME DETAIL) TYPICAL VAPOR RECOVERY PIPING
FOR BALANCE SYSTEM
REFERENCE DRAWINGS
STANDARD FIBERGLASS PIPING DETAILS 3-410 REV.5
SHEETS 1 & 2
FIBERGLASS TANKS & DETAILS 3-411 REV. 4,
EXTERIOR CONCRETE DETAILS 4-501 REV.3
r t
f
1
r
N0 DATE REVtS!DNS MADE Cl -A"' APPV'D.
BY BY
SUN REFINING & MARKETING COMPANY
�'aailiEiee �: �i�£ribuiion �aparExroni
PbOa.aelplia, PA
OF A9gs��
STAGE :II VAPOR RECOVERY
TWE
` HEALY CENTRAL SYSTEM
OS'PIPING ONLY'
'
Pilo- 27286
�FGISTER�� •F`�" - DRAWN M„A �fiG_t'S APPROVAL DRAWN.' NUMBER � .REV, hi0
'
r F __/ • CHECKED . I"x' ,.�"� � ��
' DATE /14; ES ti 3-424
"- 4 �j L.. 4 0,
SCALE