Loading...
HomeMy WebLinkAboutEngineered Plan - 1996C, � x c 40' is WELISHAS N POND LOCATION MAP LOT 79 10,504 + S.F. (0.21 -17-AC.) ASSESSORS MAP: 94 PARCEL. C79 N.a CURRENT ZONING: R-40 (1964 SUBDIVISION) BUILDING SETBACKS: F: 30' S: 20' R: 20' FLOOD ZONE: C b 52�1 10 TEST HOLE LOGS ENGINEER: THOMAS McLELLAN, P.E. WITNESS RON CADILAC, R.S. DATE: 3-29-96 PERCOLATION RATE: < 2 MIN/IN TH-1 TH-2 50.5 54 ELEV 53 \ 56 LOAMY SAND 2" 2.5Y 5/2 49.5 B HORIZON 57 LOAMY SAND \ \ t0„ 10YR 5/8 48.0 10 TEST HOLE LOGS ENGINEER: THOMAS McLELLAN, P.E. WITNESS RON CADILAC, R.S. DATE: 3-29-96 PERCOLATION RATE: < 2 MIN/IN TH-1 TH-2 50.5 55 ELEV \ 0, A & E HORIZON 56 LOAMY SAND 2" 2.5Y 5/2 49.5 B HORIZON 57 LOAMY SAND \ \ t0„ 10YR 5/8 48.0 132" 157 X56 51 z0• T P Sz 1 1p. hr / 1 •�fN � 80pGSE \ 1 54 1 zo• SSG BENCHMARK TOP OF 1 14a CONCRETE BOUND ELEV= 50.34' 50 10' �. '4 Sgj. DRIyE \ \ X 53 cE Op 50. 6 0. OSf CA _ , R %-�50. 0 UTILITY POLE GUY WIRE KEY: EXISTING CONTOUR: PROPOSED CONTOUR: ......... . ...... . EXISTING SPOT ELEVATION: 25.5 PROPOSED SPOT ELEVATION: 25 TEST HOLE: •• UTILITY POLE: -0- FENCE LINE: HYDRANT: •6 - RETAINING WALL: TREE: DM # 96-027 (D18F3) DM C HORIZON MEDIUM SAND 2.5Y 7/8 53.0 55 ELEV \ \ 56 LOAMY SAND 9" 2.5Y 4/2 52B B HORIZON 57 \ \ \ ,O. 10YR 5/8 50.5 157 X56 51 z0• T P Sz 1 1p. hr / 1 •�fN � 80pGSE \ 1 54 1 zo• SSG BENCHMARK TOP OF 1 14a CONCRETE BOUND ELEV= 50.34' 50 10' �. '4 Sgj. DRIyE \ \ X 53 cE Op 50. 6 0. OSf CA _ , R %-�50. 0 UTILITY POLE GUY WIRE KEY: EXISTING CONTOUR: PROPOSED CONTOUR: ......... . ...... . EXISTING SPOT ELEVATION: 25.5 PROPOSED SPOT ELEVATION: 25 TEST HOLE: •• UTILITY POLE: -0- FENCE LINE: HYDRANT: •6 - RETAINING WALL: TREE: DM # 96-027 (D18F3) DM C HORIZON MEDIUM SAND 2.5Y 7/8 53.0 ELEV 0, A & E HORIZON LOAMY SAND 9" 2.5Y 4/2 52B B HORIZON LOAMY SAND ,O. 10YR 5/8 50.5 C HORIZON MEDIUM SAND 2.5Y 7/8 39.5 120" 1 143.0 NO GROUNDWATER ENCOUNTERED SEPTIC SYSTEM DESIGN NOTES: I., VERTICAL DATUM., ASSUMED FROM QUAD (NGVD +/-) 2. MUNICAPAL WATER IS AVAILABLE. 3. SCHEDULE 40 - 4" PVC PIPE TO BE USED THROUGHOUT SEPTIC SYSTEM. 4. ALL PRECAST UNITS TO CONFORM WITH AASHTO H-10 LOADING SPECIFICATIONS. 5. PIPE PITCH= 1/4" PER FOOT, (UNLESS NOTED OTHERWISE). 6. FIRST 2' OF PIPE OUT OF D -BOX TO BE SET LEVEL. 7. THE SEPTIC SYSTEM HAS NOT BEEN DESIGNED TO ACCOMODATE THE USE OF A GARBAGE DISPOSAL. 8. ALL CONSTRUCTION DETAILS ARE TO BE IN CONFORMANCE WITH THE STATE OF MASS. ENVIRONMENTAL CODE (TITLE FIVE) AND LOCAL HEALTH REGULATIONS. 9. CONTRACTOR TO VERIFY LOCATIONS OF ALL UTILITIES PRIOR TO CONSTRUCTION. 10. GROUND COVER OVER ALL SEPTIC SYSTEM COMPONENTS NOT TO EXCEED 3.01 . 11. D -BOX TO BE WATER TESTED TO ENSURE LEVELNESS AND EQUAL FLOW. FLOW ESTIMATE: 3 BEDROOMS AT 110 GAL/DAY/BEDROOM = 330 GAL/DAY SEPTIC TANK: 330 GAL/DAY x 2 DAYS = 660 GAL USE 1500 GALLON SEPTIC TANK LEACHING AREA: USE 2 LEACH TRENCHES (32' x 3' x 2' DEEP) SIDE AREA: (32 + 3)2 x 2 = 140 SF (.74) = 104 GAL/ DAY BOTTOM AREA: 32 x 3 = 96 SF (74) = 71 GAL/DAY TRENCH CAPACITY 7t"175�°GAL/DAY x 2 TRENCHES - _ •GAL/DAY - -_- 350; SEPTIC SYSTEM SECTION COVERS WITHIN 12" OF 52.5 FINISHED GRADE ONE INSPECTION COVER nTOP OF FOUNDATION 0 BE WITHIN 6" OF GRADE) _�__1_ 0 0 0 o ELEV. DEMAREST-McLELLAN ENGINEERING 24 SCHOOL STREET P.O. BOX 463 WEST DENNIS, MASSACHUSETTS 02670 PHONE & FAX : (508) 398-7710 4G.d / 1500 GAL ELEV. SEPTIC TANK (6" OF STONE UNDER OR MECHANICALLY COMPACTED) TEE SIZES: INLET: 6" UP, 13" DOWN OUTLET: 6" UP, 14" DOWN APPJROVED BY: 48.05 ELEV.-BOX \47.76 47.93 (6" OF ELEV. ELEV. STONE UNDER) GAS BAFFLE AT OUTLET TEE DATE: r: _✓ E ..e� __ " F THOMAS McLELLAN, P.E. JOHN Z. DEMAREST JR., P.L.S. DECK 24• PROPOSED 3 BEDROOM DWELLING FUT. GAR. 32' PROPOSED DWELLING 2" PEASTONE 3/4" -1 1/2" WASHED STONE r- 4" PERFORATED PVC PIPE r- ELEV: 48.0 y2' 45.5 32' ELEV. TWO LEACH TRENCHES (32' x 3' x 2' DEEP) ELEV. SITE AND SEWAGE PLAN L OCA TION 102 WHITE ROCK ROAD YARMOUTH, MA. PREPARED FOR.- REEF OR:REEF REALTY SCALE: 1" = 20' DATE: 4-3-96 REFERENCE: PLAN BOOK 187 PAGE 149