Loading...
HomeMy WebLinkAboutEngineered Plan - 19991/8* TO 1/2- WASHED STONE LEGEND: 4' CAST IRON PIPE Q7f VENT EXISTING SPOT ELEVATION 00,0 (OR EQUAL) MINIMUM L NOT REQUIRED EXISTING CONTOUR----00---- PITCH 1/4' PER FT. _z 1 CU. FC OF FINAL SPOT ELEVATION 00.0 CONCRETE FINAL CONTOUR 00 SOIL TEST LOCATION FLOW UNE at p, ANCHOR UTILITY POLE -0- ELEV. >_ f A 10' liplTOWN WATER —WSW MIN. 2'0' u ° . O O G' .OG(`. ®"\ GV. € CATCH BASIN j.LEYLL O 10„ELEV. GAS UNE CELEV. GAS �V, 6 SUMP ELEV. CLEAN OUT BAFFLE I CESSPOOL C.P.0 DISTRIBUTION ELEV. _ LIQUID OUTLET DEPTH TEE BOX 7 HIGH CAPASGroNE1NN GATORS WITH I� (TO BE PLACED ON FIRM BASE) 4 FEET 14 INCHES TO BE WATER TESTED } r BENCHMARK SOIL TEST TOP OF FOUNDATION 20 FT. MINIMUM FROM CELLAR DATE OF SOIL TEST lGl 1 `7 ELEV. = jC 10 FT. MINIMUM 10 Ff. MINIMUM FROM SLAB OR CRAWL SPACE CLEAN SAND SOIL TEST DONE BY SWEETSER ENGINEERING (ASSUMED) COTE CONCRETE WITNESSED BY ��`��9 COVERS 4 SCHEDULE 40 PVC PIPE MIN. PITCH 1/8' PER FT. LOAM AND SEED 2' LAYER OF OBSERVATION HOLE ;. I ELEV 3 PERCOLATION RATE �� MIN./INCH AT: INCHES 1/8* TO 1/2- WASHED STONE LEGEND: 4' CAST IRON PIPE Q7f VENT EXISTING SPOT ELEVATION 00,0 (OR EQUAL) MINIMUM L NOT REQUIRED EXISTING CONTOUR----00---- PITCH 1/4' PER FT. _z 1 CU. FC OF FINAL SPOT ELEVATION 00.0 CONCRETE FINAL CONTOUR 00 SOIL TEST LOCATION FLOW UNE at p, ANCHOR UTILITY POLE -0- ELEV. >_ f A 10' liplTOWN WATER —WSW MIN. 2'0' u ° . O O G' .OG(`. ®"\ GV. € CATCH BASIN j.LEYLL O 10„ELEV. GAS UNE CELEV. GAS �V, 6 SUMP ELEV. CLEAN OUT BAFFLE I CESSPOOL C.P.0 DISTRIBUTION ELEV. _ LIQUID OUTLET DEPTH TEE BOX 7 HIGH CAPASGroNE1NN GATORS WITH I� (TO BE PLACED ON FIRM BASE) 4 FEET 14 INCHES TO BE WATER TESTED } r