Loading...
HomeMy WebLinkAboutCape Cod Hospital - Proposed Parking Lot Expansion002I / \ m p -00, o eAck 9 20 00. CID 00 / W .e 20. l w 7)P C81 V i i -El - - i ?, 00, / T HI/ / 2,00, / Tm�- �9Q 001 / �J 4800, 1 Ci o \ p 0l d C82 A / 29os• _� \ �2 d •• v • \ OJ 26 00, k oo' Q� Q p r + 22.4 BEG. NE / MAT G r v CB5 \ 12 00, C86 24 20. / \ CB X00. • 24 00 , VJ d 0 _6__ o .119 CB4 V R/ • M I 2s 9q C, / [23. 8 � � • / / MH P- 00' ` 500, / n V- 20 + c87 28 / o / 88 S1 [20] THe _ / I EET / 27 / 25 J PLAN -PAVEMENT DIMENSIONS, DRAINAGE & GRADING SOIL TEST DATA DATE: APRIL 12, 1999 RIM EXCAVATOR: BORTOLOTTI CONSTRUCTION 0 co (V B.O.H. AGENT: FROM O LEN. STRUCTURE ENGINEER: D. OJALA, DOWN CAPE ENGINEERING TO m LOCATION: TH1 "N • LOCATION: F� i2 STCT. ELEV. DEPTH ELEV. DEPTH 24.20 20.0 0.0 20.2 0.0 Ap - LOAMY SAND 19.4 0.8 Ap - LOAMY SAND 19.0 1.0 LT1 CB1->CB2 65 B - LOAMY SAND 23.40 17.50 B -LOAMY SAND W AP 17.0 3.0 CB2->MH1 17.2 3.0 CB3 2230 17.50 LT4 T5 C1 - M/C SAND 16,2 4,0 AP C1 - M/C SAND C83->MH2 100 10% GRAVEL 23.20 PERC 24 GAL 6.5 MIN LT6 T7 WARAP 9.7 10.5 LT7 CB4->CB7 9.0 11.0 1 C65 21.50 BOTTOM LT4 BOTTOM NO GROUNDWATER LT4 NO GROUNDWATER 44 LL LOCATION: TH4 17.50 CB6 ELEV. DEPTH LOCATION: T 20.4 0.0 f1 U C86 21.50 17.50 FILL ELEV. DEPTH AP LT6 LOAM/METAL/WOOD .17.3 0.0 16.9 3.5 ' C85 2' LOAM C1 - M/C SAND 0 CB7 SAND 17.50 LT7 W 13.8 3.5 SHEET 2 OF 4 18.00 MH3 FILL STUMPS/CARS/WIRE 17.50 CB8 RUBBLE/STUMPS 11.4 9.0 CB8 20.50 18.00 CB7 BOTTOM 10.3 7.0 C1 - M/C SAND NO GROUNDWATER 17.50 8.8 8.5 LT3 MH1->MH2 60 BOTTOM 2270 17.50 LT3 T5 NO GROUNDWATER LOCATION: TH6 LOCATION: 18.00 MH3 ELEV. DEPTH ELEV. DEPTH 17.5 0.0 MH3 2230 16.20 FlLL 16.3 0.0LOAM/CEMENT do ASPHALT 15.6 0.7 - LOAMY SAND RUBBLE 18'->FES1 8 - LOAMY SAND METAL 14.3 2.0 C1 - M/C SAND 12.5 5.0 C1 - M/C SAND 9.3 7.0 BOTTOM 8.5 9.0 NO GROUNDWATER BOTTOM NO GROUNDWATER LOCATION: TH7 ELEV. DEPTH • 26.6 0.0 25.9 0.7 A - SANDY LOAM B- SANDY LOAM 24.1 2.5 23.4 3.2 C1 - M/C SAND 10% GRAVEL PERC 24GAL IN 7.8 MIN 16.6 10.0 BOTTOM ''nn�� NOTE: NO GROUNDWATER _...,, }O 1. ORG. LOAM (TOPSOIL) MAY BE STRIPPED, STOCKPILED AND RE -USED AS PLANTING SOIL FOR LAWNS PROVIDED IT IS PROCESSED TO MEET THE REQUIREMENTS OF THE SPECIFICATIONS. 2. LOAMY SAND OR LOAMY SAND AND GRAVEL (SUBSOIL) SHALL BE REMOVED FROM TO 3 FT BELOW PAVEMENT AND BELOW AND 10' LATERALLY FROM DRAINAGE STRUCTURES TO ITS MAXIMUM DEPTH. LOAMY SAND AND GRAVEL MAY BE USED FOR FILL OUTSIDE OF THE PAVEMENT AREA. 3. MEDIUM SAND MAY BE USED AS FILL IN ALL AREAS. 4. ALL EXCESS SOIL MATERIALS SHALL BE REMOVED FROM SITE. 22 21 Z20 f� 19 Q w18 w17 16 15 SLOPE 5:1 MAX TO EXISTING GRADE NOTES: 1. STONE FOR THIS STRUCTURE SHALL BE DURABLE BROKEN ROCK WITH A SIX INCH MIN. DIMENSION. EACH STONE SHALL WEIGH NOT LESS THAN 15 POUNDS NOR MORE THAN 75 POUNDS. AT LEAST 75% OF THE VOLUME SHALL CONSIST OF STONES WEIGHING NOT LESS THAN 50 POUNDS EACH. C.I. FRAME AND COVER SCHEDULE OF ELEVATIONS STORMWATER MANAGEMENT COMPLIANCE DATA: STANDARD j/1: No discharge of stormwater to wetlands The destination of runoff form the portion of this site to be affected by construction is vegetated wetland bordering on drainage ditched and cranberry bog drainage systems, and ultimately, Lewis Bay. Treatment of stormwater runoff from impervious areas prior to discharge is required. STANDARD #2: Post development peak runoff rates must not exceed pre -development runoff rates. Town of Yarmouth Regulations require recharge of 100% of stormwater runoff generated on site during a 25yr storm. Therefor, the peak rate of runoff will remain approximately the some or less than pre -development conditions from storms with a return frequency of 25 years or less. The 100yr storm will likely be accompanied by coastal flooding to the margins of the proposed parking area. STANDARD #3: Loss of annual recharge The proposed drainage system will infiltrate all runoff from storms with a return frequency of 25yr of less. The recharge capacity of the drainage system is therefor greater than required to meet this standard. STANDARD #4: TSS removal This project will incorporate water quality inlets at each of the infiltration units to be placed under the pavement of the proposed parking area. Each infiltration unit consisting of a stone trench 4.8' wide and four foot deep is considered equivalent to an infiltration basin yielding on 80% TSS removal. Pretreatment in water quality inlets is considered to provide 25 % removal of TSS. EFFECTIVE TSS REMOVAL: 859 STANDARD #9 Operation and Maintenance Plan Maintenance of this drainage system will include annual inspection of each catch basin, and periodic removal of accumulated sediments when the level of accumulation is within one foot of the outlet trap. In addition, the overflow basin (FES1) will be annually inspected and sediments removed as required. Drainage inlets will be kept free of leaves and debris which would decrease inlet capacity. The parking lot will be swept fee of sand and debris annually after the last snowfall. F,'Hir" f RAIN I INK FFN( f REMOVE ANY UNSUITABLE MATERIALS AND REPLACE WITH CLEAN SAND AND GRAVEL TO AT LEAST 10 FT LATERALLY FROM THE LIMITS OF THIS STRUCTURE. (SEE TH3) DETAIL - FLARED END SECTION ES1 RIM 12' PIPE 0 co (V PIPE FROM O LEN. STRUCTURE M. INV TO m Z TRENCH STCT. W c=n C81 24.20 17.50 LT1 W AP LT1 CB1->CB2 65 C82 23.40 17.50 LTt T2 W AP LT2 CB2->MH1 100 CB3 2230 17.50 LT4 T5 W AP LT5 C83->MH2 100 C84 23.20 17.50 LT6 T7 WARAP t5 LT7 CB4->CB7 100 C65 21.50 17.50 LT4 W AP LT4 C65->CB3 44 LL 17.50 CB6 f1 U C86 21.50 17.50 LT6 W AP LT6 C86 ->C84 67 17.50 C85 0 CB7 21.80 17.50 LT7 W AP SHEET 2 OF 4 18.00 MH3 17.50 CB8 CB8 20.50 18.00 CB7 MHt 24.10 17.50 LT2 T3 LT3 MH1->MH2 60 MH2 2270 17.50 LT3 T5 18.00 MH3 MH3 2230 16.20 MH2 CB6 15.30 18'->FES1 STORMWATER MANAGEMENT COMPLIANCE DATA: STANDARD j/1: No discharge of stormwater to wetlands The destination of runoff form the portion of this site to be affected by construction is vegetated wetland bordering on drainage ditched and cranberry bog drainage systems, and ultimately, Lewis Bay. Treatment of stormwater runoff from impervious areas prior to discharge is required. STANDARD #2: Post development peak runoff rates must not exceed pre -development runoff rates. Town of Yarmouth Regulations require recharge of 100% of stormwater runoff generated on site during a 25yr storm. Therefor, the peak rate of runoff will remain approximately the some or less than pre -development conditions from storms with a return frequency of 25 years or less. The 100yr storm will likely be accompanied by coastal flooding to the margins of the proposed parking area. STANDARD #3: Loss of annual recharge The proposed drainage system will infiltrate all runoff from storms with a return frequency of 25yr of less. The recharge capacity of the drainage system is therefor greater than required to meet this standard. STANDARD #4: TSS removal This project will incorporate water quality inlets at each of the infiltration units to be placed under the pavement of the proposed parking area. Each infiltration unit consisting of a stone trench 4.8' wide and four foot deep is considered equivalent to an infiltration basin yielding on 80% TSS removal. Pretreatment in water quality inlets is considered to provide 25 % removal of TSS. EFFECTIVE TSS REMOVAL: 859 STANDARD #9 Operation and Maintenance Plan Maintenance of this drainage system will include annual inspection of each catch basin, and periodic removal of accumulated sediments when the level of accumulation is within one foot of the outlet trap. In addition, the overflow basin (FES1) will be annually inspected and sediments removed as required. Drainage inlets will be kept free of leaves and debris which would decrease inlet capacity. The parking lot will be swept fee of sand and debris annually after the last snowfall. F,'Hir" f RAIN I INK FFN( f REMOVE ANY UNSUITABLE MATERIALS AND REPLACE WITH CLEAN SAND AND GRAVEL TO AT LEAST 10 FT LATERALLY FROM THE LIMITS OF THIS STRUCTURE. (SEE TH3) DETAIL - FLARED END SECTION ES1 0 0 co (V oQ 0 oz° UJ 0) w UJ m Z Q Ld N W c=n Q LS✓ S to W Q U J � O f1 0 co (V O z Q Q SECTION 22 N vi Z 21 Q Cl- J i 20 WCL _ < CL 19 F- 0 0 Qd V) w )0 18 J En 17 Y w OU a ((O,, 16 Q W a N t5 O- V N Q Lj a_ LL W w (!) ui 5 O 0 CL Q m. LL O Q f1 U } W 0 99-034 SHEET 2 OF 4 DCT JOB NO. 99-031