Loading...
HomeMy WebLinkAbout81 Driving Tee Circle - Immediate Response Action Status IICONCRETE APRON BA5EMENT DETAIL SCALE 1 "=5' REFERENCE - PLAN TITLED "SUBDIVISION PLAN OF LAND IN YARMOUTH", PREPARED BY MERCER ENGINEERING CORP., SURVEYORS, DATED JULY I OGG - SKETCH OF BASEMENT AREA BY D. BENTLEY, FRIEDLINE * CARTER (UNDATED) - TOWN OF YARMOUTH ASSESSORS MAP 101 PARCEL 3 NOTE: THIS SITE PLAN WAS NOT PREPARED FROM ANY INSTRUMENT SURVEY AND UNDER NO CIRCUMSTANCES SHOULD THE DISTANCES, BEARING AND/OR OTHER FEATURES SHOWN BE USED TO ESTABLISH PROPERTY LINES. ZONE B (EXTERIOF,) AF1EA OF CONTAMINATED SOIL REMOVAL — 10' x'3' x I ME)) — VENT REA OF 5URFACE STAINING FILL WITH STAINING AROUND ZONE C (NORTH 3) AREA OF CONTAMINATED 501L REMOVAL —7.5'x 4.5'x 4'(D) CRACKS IN CONCRETE ZONE A AREA OF �— CONTAMINATED SOIL REMOVAL (COMPLETED) —G' x G' x 4-5'(D) AST 2 ZONE C (NORTH CENTRAL 2) --AREA OF CONTAMINATED SOIL REMOVAL —4.5'x 2'x 4'(D) ZONE C (SOUTH CENTRAL 2) AREA OA IT A A A I A I A TFfI C/lll OFI. Arl\/AI cor I AREA Of T LI V IIVV I\VVIVI '. RELEASE AREA AREA OF — CONCRETE FLOOR REMOVAL 1 3' x 27.5'x 0.3'(D) (-4.0 C") EXPANSION SEAM/CRACK YARMOUTH, Great W MA esters GoOf 01 se Par three KEY MAP LEGEND HB HAND BORING X 22 COMPLETED SHALLOW INTERIOR HAND BORING MW MONITORING WELL 501L VAPOR PROBE ® REMOVED CONCRETE FLOOR 51TE PLAN 0 30 GO 90 SCALE 1 "=30' DEC C � 701 HEALTH DEP ZTN# 4-25484 rroject: EMILY GLEASON KATE COLE, POA 18 WOODCREST ROAD - WESTBOROUGH, MA 01581 Title: INMMDIATE RESPONSE ACTION STATUS II 81 DRIVING TEE CIRCLE - SOUTH YARMOUTH, MA 02664 B ENNETT ENVIRONMENTAL BEA ASSOCIATES, INC. LICENSED SITE PROFESSIONALS, ENVIRONMENTAL SCIENTISTS, GEOLOGISTS, ENGINEERS 1573 MAIN STREET, P.O. BOX 1743, BREWSTER, MA 02631 PHONE: (508) 896-1706 www.bennett-ea.com FAX: (508) 896-5109 DATE SCALE BY CHECK JOB NUMBER 11/24/15 As Noted SRF TME IBEA15-10746