Loading...
HomeMy WebLinkAboutBoxwood Circle - Bldg 138 - Fire ProtectionLOWER LEVEL PLAN SCALE : 114" = 1' 0" NOTE: THIS DETAIL IS INTENDED FOR HYDRAILIC CALCULATION REFERENCE ONLY AND IS NOT A CONSTRUCTION DETAIL. WATER SERVICE DETAIL FOR HYDRAULIC CALCULATIONS ONLY SPRINKLER LEGEND CENTRAL MODEL LF RECESSED PENDEP 14 (3/8" ORIFICEX155°FX3.0K) (NUMBER INDICATES COVERAGE AREA) QCENTRAL MODEL G5 -QR UPRIGHT (1/2" ORIFICEX155°FX5.(oK) PIPE RISE C_ PIPE DROP 7 SPRINKLER (SECTIONAL VIEW) 51 HYDRAULIC CALCULATION NODE Y DESIGNED SPRINKLER SYSTEM 4FPA 13 R "WET SYSTEM" - MASTER SUITE UNIT N �l SPRINKLERS - 2 EMAND FLOW - 11.41 GPM STREAM - 100 GPM ESSURE REQUIRED - 25.42 PSI ESSURE AVAILABLE - 43.99 PSI QUAL PRESSURE AVAILABLE - 18.58 PSI HYDRANT TEST TEST DATE - lm/1/98 TEST HYDRANT - 44 PSI STATIC 38 PSI RESIDUAL FLOW HYDRANT - 6 62 GPM TEST PERFORMED BY ARH ENGINEERING, INC. GENERAL NOTES 1. All work shall be installed in a first-class manner consistent with the best current practices. Items not shown on the Drawing, but which are necessary to make a complete Fire Protection System, shall be furnished and installed as part of the work under this contract. 2. All work shall be installed in compliance with NFPA 13R and all governine Codes. 3. All materials and workmanship shall carry the standard warranty against all defects For a period not less than one (1) year from the date of acceptance of the work. Any fault due to defective materials, equipment, or workmanship which may develop within that period shall be made good, forthwith, by and at the expense of the Mechanical Contractor, including any damage done to areas, materials, and other systems resulting from this failure. 4. All layouts are diagrammatic and final arrangement shall suit field conditions. 5. Cutting and patching of masonry, concrete, wood framing and other parts of the structure shall be performed by the General Contractor. 6• All piping shall be CPVC and/or Schedule 40 steel. 1, A final system test shall be conducted in the presence of the Yarmouth Fire Department. 8. The sprinkler system shall be filled with a non-toxic antifreeze solution equal to FireFiehter Freeze Protection Solution specifically listed for use with Blazel"laster CPVC. UP"TER LEVEL PLAN SCALE 1/4 = 10„ ®r YARKQVT a tiFIRE DEPT. DEPOTY CHIEF RECEIVED A P R 13 2001 Yarmouth Fire & Rescue U i I I.I! BEDROOM BATH I� MASTER SUITE 1'-10" (E ° I'Iq _. _.._ I BATH KITCHEN I BATH �I BEDROOM �' 10'-011 BUILDING SECTION L NO SCALE -' PRESSURE GAUGE TRERICE NO. 66OC FIRST FLOW SWITCH FLOOR POTTER VSR-SF FILL CUP F I— r-- CHECK VAL - EXTERIOR WALL --7 FIRE DEPARTMENT { CONNECTION a j EXPANSION TANK AMTROL ST -5 3/41 DRAIN VALVE SLAB SLEEVE AND SEAL WATERTIGHT (TYP) RISER DETAIL NTS WITH GLYCOL REDUCED PRESSURE BACKFLOW PREVENTER AMES 40005 1'/2" FIRE SERVICE ETTS r4 ddU� z E— oLU I ��'OWltio'J U� LO0 LU co Z co (x 00 O � Z W �1 W CO W Cq LO LO co ID U � Qw W W E Q1 e � c� DRAWING TITLE: FIRE PROTECTION DRAWN BY: RCV CHECKED BY: DAG DATE: FEBRUARY 22, 2001 REVISED: PROJECT NO. 48398 SHEET W v® W o )- z W Q X Z Q ETTS r4 ddU� z E— oLU I ��'OWltio'J U� LO0 LU co Z co (x 00 O � Z W �1 W CO W Cq LO LO co ID U � Qw W W E Q1 e � c� DRAWING TITLE: FIRE PROTECTION DRAWN BY: RCV CHECKED BY: DAG DATE: FEBRUARY 22, 2001 REVISED: PROJECT NO. 48398 SHEET