HomeMy WebLinkAboutEngineered Plan - Rev. 2017LOCATION MAP
ASSESSORS MAP: t76
PARCEL: 15 z
FLOOD ZONE::__�'�✓O�__ _.���G'q
REFERENCE: 7-)62FZ0
01
i�
HAVE
rA-70"
Paz
TEST HOLE : LOGS
SOIL EVALUATOR :
WITNESS A(I \4()v,4
DATE: 1L T
PERCOLATION RATE:
TH-I ;- TH-2
1-1I
,(I U-/
I) 'Che installation shall comply with Title V and Town of �jp.pq4j Board 01
lealth 1Zegula6011s.
2) The installer shall verily (lie location olutilities, sewer inverts and ;peptic
components prior to installation tinct setting; base elevalions.
3) All gravity septic piping to be 4 inch Sch 40 PVC at 1/8" per foot. The first
two feet out of the d -box to the leaching shall be level.
4) This plan is not to be utilized for property line determination nor any other
purpose other than the proposed system installation.
5) All septic components must meet Title V specifications.
6) Parking shall not be constructed over 1-110 septic components.
7) The property is bounded by property corners and property lines:
8) The property owner shall review design considerations to approve of total
design flow and number of bedrooms to be considered for design. Receipt
of payment for the plan and installation based on the plan shall be deemed
approval of the design flow by the owner.
9)' The existing leaching or cesspools shall be pumped and filled with material
per Title V abandon -meat procedures. Those within the proposed SAS shall
be removed along with contaminated soil and replaced with clean sand per
Title V specs.
10) System components to be 10 feet from water line. Sewer lines crossing the
water line shall be sleeved with 4 inch SCI 140 PVC with ends grouted if
applicable The proposed SAS is being installed below the water service
;,]_. -,- ,, ;, j� ' � �� line. The line is to be sleeved as aforementioned and maintained in place.
SEPT I C SYSTEM DES I G N 11) If a garbage grinder exists it is to be removed and is the responsibility of the
owner to ensure such.
FLOW ESTIMATE - 12)The installer is to take caution in excavation around the gas line if such
exists.
GAL/DAY ,
13) Tae installer shalt verify.the location, quantity and elevation of the sewer
— - - - lines exiting the dwelling'prior to the installation.
1 - - 14) This plali is representative only that a system can fitn a property meeting
SEPTIC TANK
� Title V requirements.
. r A _
-GAL/DAY x 2 DAYS • GAL =
USE GALLON SEPTIC TANK �jC]k1�lwoee OT
SOIL• AB ORPTION SYSTEM ——-�
L0 DIF,
SIDE AREA: -i" Z x Lx ; I 1e7
BOTTOM AREA: 7�
1 Com/
s
SEP -11C SYSTEM SECTION
r V �
1 PT I C •TA
• DATE HEALTH AGENT
- --
UAVIO
�- 6• c. s
MASON 91 �
J P6 l sj6�o
RECEIVED
JUN 0 9 2017
HEALTH DEPT.
SITE AND SEWAGE PLAN
LOCATION: A�� e�wlpkl 10�36
PREPARED -FOR:. CNS QJV
SCALE
DAVID B. MASON> DATE:
DBC ENVIRONMENtfAL DESIGNS
EAST SANDWICH.' -.MA
(508)"833-2177
Z f , Vl7--�AO K I IDOL