Loading...
HomeMy WebLinkAboutEngineered Plan - Rev. 2017LOCATION MAP ASSESSORS MAP: t76 PARCEL: 15 z FLOOD ZONE::__�'�✓O�__ _.���G'q REFERENCE: 7-)62FZ0 01 i� HAVE rA-70" Paz TEST HOLE : LOGS SOIL EVALUATOR : WITNESS A(I \4()v,4 DATE: 1L T PERCOLATION RATE: TH-I ;- TH-2 1-1I ,(I U-/ I) 'Che installation shall comply with Title V and Town of �jp.pq4j Board 01 lealth 1Zegula6011s. 2) The installer shall verily (lie location olutilities, sewer inverts and ;peptic components prior to installation tinct setting; base elevalions. 3) All gravity septic piping to be 4 inch Sch 40 PVC at 1/8" per foot. The first two feet out of the d -box to the leaching shall be level. 4) This plan is not to be utilized for property line determination nor any other purpose other than the proposed system installation. 5) All septic components must meet Title V specifications. 6) Parking shall not be constructed over 1-110 septic components. 7) The property is bounded by property corners and property lines: 8) The property owner shall review design considerations to approve of total design flow and number of bedrooms to be considered for design. Receipt of payment for the plan and installation based on the plan shall be deemed approval of the design flow by the owner. 9)' The existing leaching or cesspools shall be pumped and filled with material per Title V abandon -meat procedures. Those within the proposed SAS shall be removed along with contaminated soil and replaced with clean sand per Title V specs. 10) System components to be 10 feet from water line. Sewer lines crossing the water line shall be sleeved with 4 inch SCI 140 PVC with ends grouted if applicable The proposed SAS is being installed below the water service ;,]_. -,- ,, ;, j� ' � �� line. The line is to be sleeved as aforementioned and maintained in place. SEPT I C SYSTEM DES I G N 11) If a garbage grinder exists it is to be removed and is the responsibility of the owner to ensure such. FLOW ESTIMATE - 12)The installer is to take caution in excavation around the gas line if such exists. GAL/DAY , 13) Tae installer shalt verify.the location, quantity and elevation of the sewer — - - - lines exiting the dwelling'prior to the installation. 1 - - 14) This plali is representative only that a system can fitn a property meeting SEPTIC TANK � Title V requirements. . r A _ -GAL/DAY x 2 DAYS • GAL = USE GALLON SEPTIC TANK �jC]k1�lwoee OT SOIL• AB ORPTION SYSTEM ——-� L0 DIF, SIDE AREA: -i" Z x Lx ; I 1e7 BOTTOM AREA: 7� 1 Com/ s SEP -11C SYSTEM SECTION r V � 1 PT I C •TA • DATE HEALTH AGENT - -- UAVIO �- 6• c. s MASON 91 � J P6 l sj6�o RECEIVED JUN 0 9 2017 HEALTH DEPT. SITE AND SEWAGE PLAN LOCATION: A�� e�wlpkl 10�36 PREPARED -FOR:. CNS QJV SCALE DAVID B. MASON> DATE: DBC ENVIRONMENtfAL DESIGNS EAST SANDWICH.' -.MA (508)"833-2177 Z f , Vl7--�AO K I IDOL