Loading...
HomeMy WebLinkAboutReview Checklist i s 7 �/ �� / / TOWN OF YARMOUTH "/`��� ��� SEWAGE PLAN REV�W CHECKLIST ..�C�1�"' ����'�� �� � Location: A.M. � � Lot� Zone of Contribution: In�t_ Acreage�,���� �� n _ � Commercial: ResidentiaL• �� Street: (,O Village: i Floor Plan: �� #Bedrooms: .� '. Owner: / Insta.11er: �) Address: Phone: - Phone: '. Builder: Engineer: /2� � �i� Address: Phone: (r - �-- Phone: _���y'� � -G � N/A YES NO l.R uired#of co ies received 2.Date of soils exam and colation test not older than 2 ears L,.�-�'� ' 3.4-5 ft of natura occurrin ervious material,above water table 4.Founda.tion 2 ft above hi oint of road H.P.: Fnd: Var.: 5.Water line 10 ft from s tic com onents Var.: 6.Benchmark indicated and shown-NGVD if near wetlands 7. S tic tank minimum 10 ft from foundation, deck Var.: �/ 8.Leachin minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: � �.i 9.Leachin minimum 100 ft from wetlands Var.: 10.Leachin minimum 150 ft from drinking we1U25 ft irrigation well Var.: 1 from r line Var.: c.---� 11.Tank/leachin minixnum 0 ft operly ��� 12. S stem meets all other setback r uirements Var.: 13.Uses adjustment for maximum hi oundwater Var.: 14.Lea.chin set 4-5 ft above ad'.water or bottom of test hole Var.: 15. System not in to or subsoil(A,B horizons)or 5'removal 16.Pro osed contours are suitable �.--��' : 17. S stem meets slo e r uirements-min. 1/8", '/4" eferred 18. System meets breakout r irements PVC liner: Wall: �_�--- 19. S ecified tee sizes are ro , gas ba,ffle on outlet tee 20. Sewa e is under 10,000 d for arcel 21.No ba e dis osal ' • 22. S stem ad uatel sized for its intended use ._.---- 23.Minimum 6"stone or com acted below tank and dbox 24.Manhole covers within 6"of ade, um cha.mber cover to ade ` 25.Ins tion ort on lastic chambers/leach field 26.Electrical ermit for um chamber/S arate meter for du lexes ---�� 27.Pum s stem-2"line,wee hole,check valve,tee in dbo� um size -�"�- 28. S tic tank/ um chamber to be facto wat roofed 29.Vent rovided if leachin below 3 feet,under drivewa / arking 34.Buoyancy calcula.tions for tank/ um cha.mber 3 l.En ' eer to ins ect and cert' soils: wall: commercial: ! 32.En ' eer/Registered Sanitarian and Land Surveyor sta.m s/si ture 33.H-20 loadin is subject to vehicular traffic, oundwater 34.Title V A lica.tion and ermit fee, installer si ature 35.Founda.tion footin min. 2 feet above ad'usted ound water for new house 36.Deed Restriction r ired max. #bedrooms: max. flow: d ___..-� ' 37.Check area lots for oundwater/Label oundwater in Assessor's Ma -'""� Plan reviewed by: �osios