Loading...
HomeMy WebLinkAboutEngineered Plan - 2016ACCESS COVERS TO WITHIN 6" OF FIN. GRADE ID. EL 16.0' 15.0' MINIMUM 75' OF COVER OVER PRECAST PRECAST H-10 RISERS (TYR) SYSTEM PROFILE (NOT TO SCALE) 2" PEASTONE OR GEOTEXTILE FILTER FABRIC OVER STONE 1i l I ALL SYSTEM COMPONENTS ShALL BE MARKED WITH MAGNETIC TAPE OR COMPARABLE MEANS FOR FUTURE LOCATION. CAST IRON H-20 WATERTIGHT jCOVER TO GRADE 2% SLOPE REQUIRED OVER SYSTEM BLOCKS OR PRECAST RISERS 99- EXISTING CONTOUR X 99. ' ,, • -[99]- WATERTEST D'BOX FOR LEVELNESS "saSCH40 PVC PIPES LEVEL 1ST 2' ' TH1 MORTAR ALL COMPONENT) INVERT IN 11.0 (TYP. 3'- ' I -S, TEST HOLE " 12.23* 20' 10" 1500 GAL H-10 14" BUILDING COVERAGE FIRE HYDRANT NOTE NOT ALL SYMBOLS MAY APPEAR IN DRAWING SOILS LEN5DS 4 ELEV. 1 Z.O' SIDES1.73' {� 4 0 f, 13.5' TEE SEPTIC TANK TEE 11.48 ®0®® A LS GAS BAFFLE . °°°°°°°00000 °0000°o^0000 °-° MIN. 2" WALL THICKNESS °°°°°°° ,0000000° >oo°°°o°o ;o 1OYR 4/2 8" ° 771 B °°°°°°°° LS ,•• � •.. �: 4' UQ. LEVEL (ACME OR EQUAL) 11.28' 27„ 11.19' �o°0°0°8 9.0' • )Q°°O°OHO°OOO°OHO°°°oa0°O°o°oho°O°ODO°O°O°o�L °,GQoo^oo,°,opo,°,o°,o,°,o.0000000�o�o�o(°,o(°,o,°,o,°,0000°° 3/4"-1-1/2" DOUBLE WASHED 4 L H-20 500 GAL LEACHING CHAMBER) BY ACME PRECAST OR EQUAL STONE 4' MIN. ALL AROUND PRECAST STRUCTURES (5) UNITS REQUIRED 6" CRUSHED STONE OR MECHANICAL OVERALL DIMENSIONS TO OUTSIDE OF STONE: 47.5' X 10.83' COMPACTION. (15.221 [2]) (-.Z-% SLOPE) (--L-% SLOPE) (--!-% SLOPE) J` to FOUNDATION- 25' SEPTIC TANK 20' DD'' BOX 21' LEACHINGFACILITY 3.6' ADJUSTED *THE INSTALLER SHALL VERIFY THE LOCATIONS OF ALL GROUNDWATER UTILITIES AND ALL BUILDING SEWER OUTLETS AND ELEVATIONS PRIOR TO INSTALLING ANY PORTION OF SEPTIC SYSTEM GROUNDWATER ADJ. DATA: WELL: MIW 29 99- EXISTING CONTOUR X 99. ' EXIST. SPOT ELEV. -[99]- PROPOSED CONTOUR 198•41 PROPOSED SPOT EL. TH1 MIN. SIDE SETBACK TEST HOLE 2� SLOPE OF GROUND 20' UTILITY POLE BUILDING COVERAGE FIRE HYDRANT NOTE NOT ALL SYMBOLS MAY APPEAR IN DRAWING TEST HOLE LOGS ENGINEER: CRAIG J. FERRARI, SE #13871 WITNESS: AMY VON HONE, RS MIN. DATE: 7/13/16 30' MIN. SIDE SETBACK 15' MIN. REAR SETBACK 20' PERC. RATE _ < 2 MIN/INCH BUILDING COVERAGE 25% CLASS I SOILS 4 ELEV. {� 4 0 f, 13.5' 0" A A LS LS 1OYR 4/2 1OYR 4/2 8" 771 B B LS LS 2291 1OYR 5/6 117, 27„ 1OYR 5/6 PERC C I I C ZONE: A ADJUSTMENT: 2.1' (J ,LY) i CLEANOUT (TY 110.48' o 1 ROPOSE� ECK PROPO ED 1' 3 SON EXISTING i OOM ON ^ DWELLING TOP cfl ONOTUBES CD 10.0 PROP SED OF FNDN EL: ADDITI N 4i 16.0 x O TOP O F D EL 16. �►y� J -3: ELEV. PORCH I 13.5' H1 20.9' _ PROPOSED 12 1 / x �I DIS VE D�ITII m �< �`J �� ORCH o Cl)j LOT 104 ' m TH2 o 10,694± S.F. 11.3' o I� 0 114.15 0 MS 1OYR 7/4 •0 1OYR 7/4 144" 1.5' 144" 1 I 1.5' GROUNDWATER ENCOUNTERED @ 144" EL. 1.5 LICE #16-199 Scale:1 "= 20' 0 10 20 30 40 50 FEET BENCHMARK CENTER OF BASIN EL » = 11.65' CK PATH:, O 0 1� NOTES 1. DATUM IS NAVD 88 2. MUNICIPAL WATER IS EXISTING 3. MINIMUM PIPE PITCH TO BE 1/8- PER FOOT. 4. DESIGN LOADING FOR ALL PROPOSED PRECAST UNITS TO BE AASHO H -M 5. PIPE JOINTS TO BE MADE WATERTIGHT. 6. CONSTRUCTION DETAILS TO BE IN ACCORDANCE WITH 310 CMR 15.000 (TITLE 5.) 7. THIS PLAN IS FOR PROPOSED WORK ONLY AND NOT TO BE USED FOR LOT LINE STAKING OR ANY OTHER PURPOSE. 8. PIPE FOR SEPTIC SYSTEM TO SCH. 40-4" PVC. 9. COMPONENTS NOT TO BE BACKFILLED OR CONCEALED WITHOUT INSPECTION BY BOARD OF HEALTH AND PERMISSION OBTAINED FROM BOARD OF HEALTH. ' 10. CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING DIGSAFE (1-888-344-7233) AND VERIFYING THE LOCATION OF ALL UNDERGROUND & OVERHEAD UTILITIES PRIOR TO COMMENCEMENT OF WORK. 11. ANY UNSUITABLE MATERIAL ENCOUNTERED SHALL BE REMOVED 5' BENEATH AND AROUND THE PROPOSED LEACHING FACILITY. 12. EXISTING LEACHING FACILITY SHALL BE PUMPED AND REMOVED OR PUMPED AND FILLED WITH CLEAN SAND. SYSTEM DESIGN: GARBAGE DISPOSER IS NOT ALLOWED / DESIGN FLOW: 5 BEDROOMS @ 110 GPD = 550 GPD USE A 550 GPD DESIGN FLOW SEPTIC TANK: 550 GPD (2) = 1100 USE A 1500 GAL. SEPTIC TANK LOCUS MAP NOT TO SCALE ASSESSORS MAP 42 PARCEL 24 ZONING SUMMARY ZONING DISTRICT: R-25 RESIDENTIAL DISTRICT MIN. LOT SIZE 25,000 S.F. gi El LOT FRONTAGE 150' MIN. FRONT SETBACK 30' MIN. SIDE SETBACK 15' MIN. REAR SETBACK 20' MAX. BUILDING COVERAGE 25% lam LOCUS MAP NOT TO SCALE ASSESSORS MAP 42 PARCEL 24 ZONING SUMMARY ZONING DISTRICT: R-25 RESIDENTIAL DISTRICT MIN. LOT SIZE 25,000 S.F. MIN. LOT FRONTAGE 150' MIN. FRONT SETBACK 30' MIN. SIDE SETBACK 15' MIN. REAR SETBACK 20' MAX. BUILDING COVERAGE 25% 1 LEACHING: SIDES: 2 (47.5 + 10.8) 2 (.74) = 172.5 GPD BOTTOM 47.5 x 10.8 (.74) = 379.6 GPD TOTAL: 746 S.F. 552.1 GPD USE (5) 500 GAL. LEACHING CHAMBERS (ACME OR EQUAL) WITH 2.5' STONE AT ENDS AND 3' AT SIDES Yarmouth Health Department N ZN OF 41 4 SS9cy OF MgSS moo`' DANIEL G� _�� 9cy A. DANIELA. G� o OJALA OJALA q No. 40980 CIVIL cn I � O�,� No. 46502 FESS�� � 9 'P lgNO SURNEyO o�� SG�NAL ENG\a� DATE DANIEL A. OJALA, P.E., P.L.S. TITLE 5 SITE PLAN OF 20 HEMLOCK PATH SOUTH YARMOUTH. MA PREPARED FOR FRANCIS ROSA DATE: DECEMBER 12, 2016 off 508-362-4541 I fax 508-362-9880 Idowncope.com down cape engineering, inc. civil engineers land surveyors 939 Main Street ( Rte 6A) YARMOUTHPORT MA 02675 16-199 ROSA.DWG