Loading...
HomeMy WebLinkAboutEngineered Plan - Rev. 2001I ACCESS COVER TO WITHIN 6" OF FIN. GRADE ACCESS COVER (WATERTIGHT) TO WITHIN 6" OF FIN. GRADE i'OP OF FNDN AT EL. 28.6 GROUND SURFACE AT EL. 26.1'± GROUND SURFACE AT EL. 29.5'± k MINIMUM .75' OF COVER OVER PRECAST MINIMUM .75' OF COVER OVER PRECAST 2% SLOPE REQUIRED OVER SYSTEM GROUND SURFACE AT EL. 28.0'± (PROP.) RUN PIPE LEVEL EXISTING 1,000 (EXIST) FOR FIRST 2' 2" DOUBLE WASHED PEASTONE 1 GALLON SEPTIC f r TANK (H-10) AS BAFFLE24.06' 24.23' ��"" 24. 3' Q 2.5 ® SIDES 3.5' ® ENDS 6" CRUSHED STONE OR 2' : DEPTH OF FLOW 4' MECHANICAL COMPACTION. (15.221 [2]) TEE SIZES: "MIN BELOW FLOW LINE ? EN> INLET DEPTH 10 14" o$g a OUTLET DEPTH _ 4" MIN BELOW FLOW LINE 3/4" TO .'1 1/2" DOUBLE WASHED STONE (MIN 2% SLOPE) (MIN 1% SLOPE) (MIN 1% SLOPE) FOUNDATION 11 SEPTIC TANK 36' D' BOX 5' LEACHING FACILITY C SYSTEM PROFILE } (NOT TO SCALE) BOTTOM OF TEST HOLE AT EL. TH1 VARIANCE REQUESTED UNDER 15.405 (MFC) t¢IJNSUIT) _ 1(a) REQUEST REDUCTION IN SETBACK, SAS TO DEPTH (IN.) <, ELEVATION (FT.) PROPERTY LINE (10' TO 6') 0" Cf 22.6 - .. t FILL 1 f n 36 ' C1 C��.ARSE SAND ,-.5 Y 7/3 60" ,; C2 1 -0 --MY MED SAND _.5 Y 5/4 C3 SILT LOAM G EY 2 4/1 OB 01-046 Z�XISTING 1,000 SEPTIC T -K---- 01-046 ---- 24 �. 1A OF g� ARNE H. OJALA CI IL y No. 2 H. BENCHMARK - CENTER OF, CATCH BASIN ELEV. = 19.5 92" POSSIBLE 5' REMOVAL OF UNSUITABLE SOIL REQUIRED AROUND PORTION OF LEACH ` \ / FA('.It ITY IN AREA OF' PROPOSFD 1 19" 19.6 24.53' 22.03' 5.73' 0 DEPTH (IN,) TH2 n 0 6" 17.6 TIGHT POCKETS 14.93 1 ; 7R 178" Cf FI LL C1 FINE SAND 2.5 Y 6/6 ELEVATION (FT.) ----126.8 26.3 SOIL CLASS: _...... .... -. ..._ --- - __ 16.3 . �\� LINER. REPLACE WITH CLEAN MED. 0- 4) SAND. ENGINEER TO INSPECT AND WA WEEPING AT 76" NO WATER FOUND ry4 CERTIFY REMOVAL. -'-'L: 6 8 wS .'i..E --�p0- \ '� (NOT TO SCALE) 13,6 O IyFT� ' LOT 47 \ DIRT 31+/- ACRES SEPTIC SYSTEM DESIGN DATA PROVIDE APPROX. 26' OF 40 MIL DRIVE i LINER, 5' OFF LEACHING FkC(LITY AS SEPTIC DESIGN: (GARBAGE DISPOSER IS NOT ALLOWED) SHOWN (TO PREVENT POSS B LITY OF <� W BREAKOUT) ' DESIGN FLOW: 5 BEDROOMS (1 10 GPD) = 550 GPD TOP ELEV. AT 24.5', BOTTOM AT \ wSEPTIC TANK: 550 GPD 2 = 1100 d'OS LEACHING: BOTTOM: 56 X 8.83 = 494 S.F. OP LF $ DN TSH ; SIDES: 2(56 + 8.83) X 2 EFFECTIVE DEPTH = 259 S.F. TOTAL: 753 S.F. X 0.74 LTAR = 557 GPD > 550 O.K. OFc� G 2, r USE (1) ROW OF ( H-C-A-PPAC-I-T-Y-INFIL-TRAT-0 S WITH 2' OF STONE ALL AROUND AND 14" BENEATH / �Q> O / / (1) ROW OF (8) I-IIGH CAPACITY INFILTRATORS WITH (f6 �K 2' OF STONE ALL (AROUND AND 14" BENEATH V ti PUMP AND REMOVE EXISTING LEACH PITS ,.AND 2 � REMOVE ANY CONTAMINATED SOIL WITHIN i' OF 2 - NEW LEACHING FACILITY Ott 508-3 fox 508 3662 -asst 29880 } 3 I 3 down cope engineering, inc. OF Mgf ARNE s9�� CIVIL_ ENGINEERS JA BOARD OF HEALTH LAND SURVEYORS AV MA 939 main st. yormouth, ma 02675 'O EtnNP DATE AhPPROVED DATE x LEGEND --W- EXISTING WATER LINE --CHEYEN LN APPROXIMATE LOCATION EXISTING CONTOUR X 16 PROPOSED SPOT GRADE -16- PROPOSED CONTOUR TH 1 SOIL TEST HOLE ® SEE TEST HOLE LOG(S) UTILITY POLE LP EXISTING LEACH PIT NOT ALL SYMBOLS MAY APPEAR IN DRAWING DEPTH (IN,) TH2 n 0 6" 17.6 TIGHT POCKETS 14.93 1 ; 7R 178" Cf FI LL C1 FINE SAND 2.5 Y 6/6 ELEVATION (FT.) ----126.8 26.3 SOIL CLASS: _...... .... -. ..._ --- - __ 16.3 . �\� LINER. REPLACE WITH CLEAN MED. 0- 4) SAND. ENGINEER TO INSPECT AND WA WEEPING AT 76" NO WATER FOUND ry4 CERTIFY REMOVAL. -'-'L: 6 8 wS .'i..E --�p0- \ '� (NOT TO SCALE) 13,6 O IyFT� ' LOT 47 \ DIRT 31+/- ACRES SEPTIC SYSTEM DESIGN DATA PROVIDE APPROX. 26' OF 40 MIL DRIVE i LINER, 5' OFF LEACHING FkC(LITY AS SEPTIC DESIGN: (GARBAGE DISPOSER IS NOT ALLOWED) SHOWN (TO PREVENT POSS B LITY OF <� W BREAKOUT) ' DESIGN FLOW: 5 BEDROOMS (1 10 GPD) = 550 GPD TOP ELEV. AT 24.5', BOTTOM AT \ wSEPTIC TANK: 550 GPD 2 = 1100 d'OS LEACHING: BOTTOM: 56 X 8.83 = 494 S.F. OP LF $ DN TSH ; SIDES: 2(56 + 8.83) X 2 EFFECTIVE DEPTH = 259 S.F. TOTAL: 753 S.F. X 0.74 LTAR = 557 GPD > 550 O.K. OFc� G 2, r USE (1) ROW OF ( H-C-A-PPAC-I-T-Y-INFIL-TRAT-0 S WITH 2' OF STONE ALL AROUND AND 14" BENEATH / �Q> O / / (1) ROW OF (8) I-IIGH CAPACITY INFILTRATORS WITH (f6 �K 2' OF STONE ALL (AROUND AND 14" BENEATH V ti PUMP AND REMOVE EXISTING LEACH PITS ,.AND 2 � REMOVE ANY CONTAMINATED SOIL WITHIN i' OF 2 - NEW LEACHING FACILITY Ott 508-3 fox 508 3662 -asst 29880 } 3 I 3 down cope engineering, inc. OF Mgf ARNE s9�� CIVIL_ ENGINEERS JA BOARD OF HEALTH LAND SURVEYORS AV MA 939 main st. yormouth, ma 02675 'O EtnNP DATE AhPPROVED DATE x ASSESSORS MAP: 116 PARCEL: 44 < 9" IN 8:14 PERC RATE: <2 MIN./INCH PERC: 70" DATE: APRIL 5, 2001 ENGINEER: R. JUDD, SE WITNESS: AMY VON HONE, RS EXCAVATOR: ELLIS BROTHERS NOTES: 1. THE LOCATION OF LXIS T iNG UNDLRGROUND UTILITIES SHOWN ON THIS PLAN IS APPROXIMATE. PRIOR TO ANY EXCAVATION ON THIS SITE, THE EXCAVATING CONTRACTOR SHALL MAKE THE REQUIRED 72 HOUR NOTIFICATION TO DIG SAFE (1-888-344-7233) AND ANY OTHER UTILITIES WHICH MAY HAVE CABLE, PIPE, OR EQUIPMENT IN THE CONSTRUCTION AREA FOR VERIFICATION OF LOCATIONS. 2. MUNICIPAL WATER IS EXISTING, 3. ALL SEPTIC WORK AND MATERIALS TO CONFORM TO 310 CMR 15.00 TITLE 5 AND YARMOUTH HEALTH REGULATIONS. 4. MINIMUM PIPE PITCH TO BE 1/8- PER FOOT. 5. DESIGN LOADING FOR ALL PRECAST UNITS TO BE AASHO H-10. 6. PIPE JOINTS TO BE MADE WATERTIGHT. 7. WATER TEST D -BOX FOR LEVELNESS. 8. THIS PLAN IS FOR PROPOSED WORK ONLY AND NOT TO BE USED FOR LOT LINE STAKING. 9. PIPE FOR SEPTIC SYSTEM TO BE SCH. 40-4" PVC. 10. COMPONENTS NOT TO BE BACKFILLED OR CONCEALED WITHOUT INSPECTION BY BOARD OF HEALTH AND PERMISSION OBTAINED FROM BOARD OF HEALTH. 11. NO VEHICLES OR CONSTRUCTION EQUIPMENT ALLOWED OVER PROPOSED SYSTEM. 12. VERTICAL DATUM APPROXIMATED FROM QUAD TITLE 5 UPGRADE PLAN OF 19 CHEYENNE LANE IN THE TOWN OF: YARMOUTHPORT PREPARED FOR: GUY CECCHI 20 0 20 40 60 SCALE: 1 " = 20' DATE: APRIL 5, 2001 REV. 4/24/01 (REMOVE ST) MAN t r 2130 1 HEALTH DEPT. YARMO S LOCUS MILL POND --CHEYEN LN c�Fq T I .RNR ROUTE 6 LOCUS MAP SCALE: NTS ASSESSORS MAP: 116 PARCEL: 44 < 9" IN 8:14 PERC RATE: <2 MIN./INCH PERC: 70" DATE: APRIL 5, 2001 ENGINEER: R. JUDD, SE WITNESS: AMY VON HONE, RS EXCAVATOR: ELLIS BROTHERS NOTES: 1. THE LOCATION OF LXIS T iNG UNDLRGROUND UTILITIES SHOWN ON THIS PLAN IS APPROXIMATE. PRIOR TO ANY EXCAVATION ON THIS SITE, THE EXCAVATING CONTRACTOR SHALL MAKE THE REQUIRED 72 HOUR NOTIFICATION TO DIG SAFE (1-888-344-7233) AND ANY OTHER UTILITIES WHICH MAY HAVE CABLE, PIPE, OR EQUIPMENT IN THE CONSTRUCTION AREA FOR VERIFICATION OF LOCATIONS. 2. MUNICIPAL WATER IS EXISTING, 3. ALL SEPTIC WORK AND MATERIALS TO CONFORM TO 310 CMR 15.00 TITLE 5 AND YARMOUTH HEALTH REGULATIONS. 4. MINIMUM PIPE PITCH TO BE 1/8- PER FOOT. 5. DESIGN LOADING FOR ALL PRECAST UNITS TO BE AASHO H-10. 6. PIPE JOINTS TO BE MADE WATERTIGHT. 7. WATER TEST D -BOX FOR LEVELNESS. 8. THIS PLAN IS FOR PROPOSED WORK ONLY AND NOT TO BE USED FOR LOT LINE STAKING. 9. PIPE FOR SEPTIC SYSTEM TO BE SCH. 40-4" PVC. 10. COMPONENTS NOT TO BE BACKFILLED OR CONCEALED WITHOUT INSPECTION BY BOARD OF HEALTH AND PERMISSION OBTAINED FROM BOARD OF HEALTH. 11. NO VEHICLES OR CONSTRUCTION EQUIPMENT ALLOWED OVER PROPOSED SYSTEM. 12. VERTICAL DATUM APPROXIMATED FROM QUAD TITLE 5 UPGRADE PLAN OF 19 CHEYENNE LANE IN THE TOWN OF: YARMOUTHPORT PREPARED FOR: GUY CECCHI 20 0 20 40 60 SCALE: 1 " = 20' DATE: APRIL 5, 2001 REV. 4/24/01 (REMOVE ST) MAN t r 2130 1 HEALTH DEPT.